Loher Elektro Subotica LES

Slides:



Advertisements
Similar presentations
The Department of Education Presented to the Senate Finance and Assembly Ways & Means Joint Committee March 10, 2009.
Advertisements

Relu Data Support Service, UK Data Archive
INEBRIA 2009 Newcastle upon Tyne
Composition Program 09 Grading Workshop Conclusion Ellen Barton Director of Composition
COMP 110: Introduction to Programming Tyler Johnson Feb 11, 2009 MWF 11:00AM-12:15PM Sitterson 014.
COMP 110: Introduction to Programming Tyler Johnson Feb 25, 2009 MWF 11:00AM-12:15PM Sitterson 014.
COMP 110: Introduction to Programming Tyler Johnson Mar 16, 2009 MWF 11:00AM-12:15PM Sitterson 014.
COMP 110: Introduction to Programming Tyler Johnson Mar 23, 2009 MWF 11:00AM-12:15PM Sitterson 014.
COMP 110: Introduction to Programming Tyler Johnson Apr 20, 2009 MWF 11:00AM-12:15PM Sitterson 014.
COMP 110: Introduction to Programming Tyler Johnson Apr 27, 2009 MWF 11:00AM-12:15PM Sitterson 014.
COMP 110: Introduction to Programming Tyler Johnson Feb 4, 2009 MWF 11:00AM-12:15PM Sitterson 014.
Solvency ii: an overview Lloyds May © LloydsSolvency II May Contents Solvency II: key features Legislative process Solvency II implementation.
2010 Tax Class1 Day 3 Class Participation Class Exercise – Paul Austin Publ W Exercise page 98 Advanced Section.
Tax Year TYPES OF PAYMENTS 1040 PG 2 Line & 68 Federal income tax withheld from W-2s, 1099s Estimated payments & $ applied from prior year.
Katowice, 17th April, KIC - Sustainable Energy - current status of preparations Prof. Tomasz Szmuc AGH University of Science and Technology Katowice,
Federal Energy Regulatory Commission July Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
Mobile Care for Chronic Conditions Presentation to: Wireless Future of Health IT G-106, Dirksen Senate Office Building March 23, 2009 BeWell Mobile Technology,
Egon Verharen Nederlandse Publieke Omroep (Netherlands Public Broadcasting) Date: 16 sept 2009, Nordunet Copyright 2009 NPO, Egon Verharen, Large.
Large Scale Integration of Senses for the Semantic Web Jorge Gracia, Mathieu dAquin, Eduardo Mena Computer Science and Systems Engineering Department (DIIS)
© Copyright SOGET 2008 GRAND PORT MARITIME DU HAVRE CIP – Le Havre Technical Cooperation Tenth Executive Board Meeting of the Inter-American Committee.
1. 2 PERCENTAGE FOR IACHR IN THE OAS 2009 BUDGET (US$ 3,746,100)
M. Mayer SEWG Fuel Retention June Sample Analysis for TS, AUG and JET: Depth Profiling of Deuterium M. Mayer Max-Planck-Institut für Plasmaphysik,
Producing monthly estimates of labour market indicators exploiting the longitudinal dimension of the LFS microdata R. Gatto, S. Loriga, A. Spizzichino.
DEALING WITH DOOM THE TRIPLE CHALLENGE OF ENERGY SCARCITY, CLIMATE CHANGE AND GLOBAL INEQUITY JOS BRUGGINK.
20 May Data Protection Conference CONSUMER PROTECTION AND PERSONAL DATA PROTECTION Prof.dr. Paul De Hert Vrije Universiteit Brussel (LSTS) & University.
Empowering the Consumer: Telecom Consumer Parliament A Nigerian Communications Commission Initiative by Lolia S. Emakpore (Mrs) Director, Consumer Affairs.
Presenter Name(s) Issue date National Student.
Copyright Dr Mike Sutton Who Buys Stolen Goods? Findings from the 1994 BCS, 2002/03 BCS and 2003 Offending Crime and Justice Survey Dr Mike Sutton,
University of Reading Improved understanding of how rainfall responds to a warming world Richard Allan Environmental Systems.
Wouter Noordkamp The assessment of new platforms on operational performance and manning concepts.
49 th CGSIC Meeting in Savannah, Georgia, September GPS Time and Frequency Transfer Activities at NIST Victor Zhang National Institute of Standards.
Quality Management for the Medical Laboratory
Student Learning Center Time Management Welcome to the Time Management workshop. While we are waiting to begin, please fill out the blank weekly.
Urban Water Conservation: Comparing Price and Non-price Policies Sheila M. Olmstead Yale University Federal Reserve Bank of Atlanta June 17, 2009.
Ziehm Academy - User Guide for online registration portal Nuremberg, February 2009.
October FUEL PRICE EVALUATION Comparing different fuel costs is a complex issue requiring an in-depth knowledge of fuel properties and characteristics,
Automation Solutions for Ladle Gate Applications
Efficient Solutions For Water Supply Helix High-Pressure Vertical Multistage Pump.
Speed Limit Finder CS 410 Fall 2009 Personal Presentation September 21, 2009 Sept. 21,
1 Cathay Life Insurance Ltd. (Vietnam) 27/11/20091.
Progress report on coatings for SPS-U S.Calatroni, P.Chiggiato, P.Costa Pinto, M.Taborelli, I.Wevers, C.Yin Vallgren, H.Pedroso-Marques, W. Vollenberg.
Feb Alten Group Started in France in 1988 Currently more than people Presence in 10 countries Active in The Netherlands since 2002.
ATUG Roundtable – November 2009 NBN Architecture Reference Model.
Source: Financial Times of London Global Banks 1999 – 2009 “Changing of the Guard”
FC-PI-5, FC-FS-3, and 16GFC T11/09-506v0 - 8/27/2009 FC-PI-5, FC-FS-3, and 16GFC.
FC-PI-5, FC-FS-3, and 16GFC T11/09-506v2 - 10/27/2009 FC-PI-5, FC-FS-3, and 16GFC.
1. (c) Alan Rowley Associates Laboratory Accreditation Dr Alan G Rowley Quality Policy based on Quality Objectives Quality Management System Communicate.
CAP CAVSARP: Clearwater Facility. CAP (Central Arizona Project) In 1980, Arizona overdraft: 2.5 million acre feet year (afy) groundwater deficit due to.
Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.
Name ____________________ Date ___________ Period ____.
Our project for Salo Youth Conference February 2009 Realschule Puchheim Bavaria/Germany.
B E S T B E S T B E S T.
High Power Terminals & Connectors MAK8 & MAK12
Panel 3D = XML file pointer 08/09/20091 LHCb calorimeter meeting (jean-luc PANAZOL)
Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,
Agriculture: the Dog that Didn’t Bark? Tim Josling and Stefan Tangermann.
Ohio University Beta Alpha Psi Awards Banquet
K eep I t C onfidential Prepared by: Security Architecture Collaboration Team.
Delivering Preference The Marketing Clinic THE MARKETING CLINIC Success Springs From Understanding The Consumer Fully Understanding Regional Preferences.
RASADNIČKA PROIZVODNJA I PROIZVODNJA CVEĆA U SRBIJI
Alternative INDC Zero Carbon Serbia: Plan for 100% renewable energy system in Serbia.
Ekonomski rast i tehnoloski progres
Gromobranska zaštita vetroelektrana
Upravljanje ambalažnim otpadom u Srbiji Waste Management in Serbia
ECO POWER d.o.o. Kotor Varos
PROIZVODNJA ENERGIJE IZ BIOMASE - “VICTORIA GROUP” COMPANY
VEKTORSKI UPRAVLJAN ASINHRONI MOTOR
AMM SISTEM Opseg PLC komunikacije 72kHz±1.2kHz
Herceg Novi - Igalo, maj godine
Presentation transcript:

Loher Elektro Subotica LES Proizvođač za Obnovljive Izvore Energije Prezentacija o LES-u - April 2009

Istorijat LES – a Firma Loher Elektro Subotica d.o.o (LES) je osnovana u januaru 2003. godine sa 100% - nim vlasništvom LOHER GmbH iz Ruhštorfa (Nemačka) – funkcioniše u sastavu FLENDER grupacije. LOHER GmbH je prisutan u Subotici od 2001. godine kada je pokušavao realizovati proizvodnju sa SEVER-om. Nakon 2 godine ova saradnja je prekinuta zbog neispunjavanja planirane prozvodnje, zbog problema sa kvalitetom i kašnjenjem isporuka (period pre privatizacije fabrike SEVER). Nakon osnivanja fime LES u 2003. godini realizuje se obuka u matičnoj firmi za 10+2 radnika u trajanju od 3 meseca, Proizvodnja u Subotici na 1.000 m2 proizvodne površine počinje u maju 2003. godine a prva isporuka je ostvarena 16. juna 2003. godine 6. april 2009

Proizvodni program LES-a Namotavanje statora i rotora (garnitura) za vetrogeneratore sa impregnacijom i polimerizacijom elemenata Opseg snaga od 1,5 do 3 MW Asinhroni generatori sa namotanim rotorom Montiranje vetrogeneratora Sinhroni generatori sa rotorom od permanentnih magneta Montiranje pretvaračkih ormana za potrebe solarnih- i vetroelektrana Solarni sistemi do 500 kW Za vetroelekrane do 3 MW 6. april 2009

Istorijat LES – a 2004. godine se udvostručuje proizvodni prostor ( na 2.500m2) i LES počinje da radi u okviru Slobodne Zone Subotica (SZS) Osniva se firma Flender Motox Subotica (FMS) za izradu delova motora reduktora sa matičnom firmom FLENDER Tübingen iz Nemačke Proizvodni program u Subotici se proširuje sa impregnacijom i polimerizacijom namotanih statora i rotora ( firma Energomont) Povećava se proizvodni prostor na 2.500 + 2.500 m2 (dve hale na staroj lokaciji na Paliću) Razvoj proizvodnje LES –a u proizvodnoj godini 2005/2006 iziskuje proširenje infrastrukture. Zakupodavac želi da poveća cenu zakupnine bez ulaganja : Nedostatak priključka vode i kanalizacije Nedostatak priključka zemnog gasa Nedostatak asfaltiranih puteva Nedostatak planova o proširenju proizvodnih prostora 6. april 2009

U 2005. godini menja se vlasnik - SIEMENS kupuje FLENDER Istorijat LES – a U 2005. godini menja se vlasnik - SIEMENS kupuje FLENDER Flender Motox Subotica (FMS) zatvara (likvidira) firmu u Subotici, njihovi radnici su primljeni u LES LES se od 01. oktobra 2006. godine seli na novu lokaciju u Halu 1 sa 15.000 m2 ( Logistički centar Subotica). Nove investicije u Hali 1 iznose oko 4 mil. EUR Povećanje obima proizvodnje u svim odeljenjima LES – a. Iznamljuje se Hala 2 u 2008. godini ( proiz. površina se povećava na 28.000 m2) Rekordna proizvodnja LES – a u proizvodnoj godini 2007/2008 6. april 2009

Kupci LES – ovih proizvoda Kupci vetrogeneratora GE Wind Siemens Nordex Repower Fuhrlander Gamesa Ecotehnia Vestas Eviag Kupci pretvaračkih ormana za potrebe solarnih ćelija Xantrex 6. april 2009

Parametri proizvodnje LES-a 6. april 2009

Parametri proizvodnje LES-a 6. april 2009

Parametri proizvodnje LES-a 6. april 2009

Uticaj energetske krize na LES Zbog nestašice zemnog gasa ispad proizvodnje u LES-u je trajao samo pola dana Dodatne neplanirane investicije Primenjene alternative za zemni gas omogućuju optimalni izbor sistema grejanja u LES-u 6. april 2009

Razvoj , optimalizacija i inovacija u LES-u Projektovanje, izrada i verifikacija presa ( CE znak – TÜV Rheinland) za kalibraciju i mikanizaciju namotaja statora i štapova rotora Za potrebe LES – a Za potrebe matične firme LOHER GmbH Za izvoz u Kinu Projektovanje, izrada i verifikacija sistema za impregnaciju i polimerizaciju namotanih statora i rotora (Energomont) Izrada sistema za impregnaciju sa 100%- nim monitoringom procesa Izrada peći za polimerizaciju sa 100%- nim monitoringom procesa Energetski efikasan sistem polimerizacije 6. april 2009

Razvoj , optimalizacija i inovacija u LES-u Projektovanje, izrada i verifikacija mašina za bandažiranje ( CE znak – TÜV Rheinland) obrtnih stolova ( CE znak – TÜV Rheinland) mašina za ravnanje i savijanje krajeva namotaja statora ( CE znak – TÜV Rheinland) Peći za zagrevanje kućišta Peći za HT tretman drvene ambalaže Izrada i verifikacija uređaja za kontrolu ležajeva Kompenzacija jalove energije u LES-u Ugradnja hibridnog filtera radi smanjenja prljanja el. mreže kod mašina za balansiranje Zatvoreni sistem vodenog hlađenja presa 6. april 2009

Razvoj , optimalizacija i inovacija u LES-u Monitoring sistemi procesa Monitoring rada presa kod izrade namoja statora i rotora Monitoring zatvorenog sistema vodenog hlađenja Monitoring temperatura u server sobama Monitoring potrošnje: Električne energije i trafo stanice Vode, hidranta i sprinkler sistema Gasa (zemni, TNG, industrijski) Monitoring rada peći u LES-u Monitoring tehnološkog procesa proizvodnje u svim segmentima proizvodnje Monitoring otpadnih materijala (reciklaža – deponija) 6. april 2009

Razvoj , optimalizacija i inovacija u LES-u Izrada i verifikacija izrade rotora sa permanentnim magnetima u LES –u Izrada prototipa Realizacija proizvodnje 0 - serije Izrada i verifikacija montaže sinhronog generatora (PERM) u LES-u Pripreme za usvajanje tehnologije namotavanja statora sinhronog generatora konstrukcije Siemens Berlin (vetrogenerator bez prenosnika, snage 3 - 10 MW – formiran iz segmenata statora – rotor sa permanentnim magnetima) 6. april 2009

Implementacija i integracija LES – a u SIEMENS Implementacija SAP u LES Logistika, ulazna kontrola delova P2P proces knjigovodstvo Compliance – antikorupcioni program Sistem provere (Audit) top+ PUMA program 5 S metoda Auditi kupaca (minimum jednom godišnje) GE Wind Nordex Gamesa Vestas (potencijalni novi kupac) Integracija LES –a u Siemens Beograd 6. april 2009