Multiconsult.no Om forskningsaktiviteter og funn så langt Workshop next 2014, Multiconsult Oslo Svein Bjørberg.

Slides:



Advertisements
Similar presentations
Training and Education
Advertisements

Requirements Engineering Processes – 2
Chapter 5 Transfer of Training
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Advanced Piloting Cruise Plot.
Cost Management ACCOUNTING AND CONTROL
Chapter 1 The Study of Body Function Image PowerPoint
1 International Workshop Beijing, 8-10 June 2009 From Data to Accounts Session VI: General Discussion Moderator : Frederick W H HO.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
One UN Results Reporting Prototype Consultation Workshop UN DOCO New York, NY – September 2009.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
ActionDescription 1Decisions about planning and managing the coast are governed by general legal instruments. 2Sectoral stakeholders meet on an ad hoc.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
The Implementation Structure DG AGRI, October 2005
The Managing Authority –Keystone of the Control System
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Modern Systems Analyst and as a Project Manager
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Richmond House, Liverpool (1) 26 th January 2004.
Promotion and Tenure Workshop 1. Evaluation Procedure There is only one evaluation procedure leading to recommendations regarding promotion, tenure and.
1 The OneGeology project IC GS Ian Jackson, February 2007.
Integrated Approach to Area Master Planning in Jubail Industrial City
Effectively applying ISO9001:2000 clauses 6 and 7.
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
VOORBLAD.
Tools and Methodologies in Assessing Technology Needs: An Overview Contact: Prof. Zou Ji Dept. of Environmental Economics and Management Renmin University.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
Settlement Program Logic Model
© 2012 National Heart Foundation of Australia. Slide 2.
Universität Kaiserslautern Institut für Technologie und Arbeit / Institute of Technology and Work 1 Q16) Willingness to participate in a follow-up case.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Appraising and Managing Performance (c) 2007 by Prentice Hall7-1 Chapter 7.
Chapter 5 Test Review Sections 5-1 through 5-4.
1 K. C. Lo / L. M. Chow Power Systems Business Group CLP Power Knowledge Management in CLP Power Oct 2004.
The EU in the new complex geography of economic systems: models tools and policy evaluation COST Action IS1104 Meeting Lisbon March 2013.
25 seconds left…...
Delivering training at work. Housekeeping › mobile phones › break times › toilets › emergencies © smallprint 2.
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
REGISTRATION OF STUDENTS Master Settings STUDENT INFORMATION PRABANDHAK DEFINE FEE STRUCTURE FEE COLLECTION Attendance Management REPORTS Architecture.
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
District Leadership Team Stakeholder Involvement in the District Strategic Plan! Session #4 April 12th, 2011.
Principles of Marketing
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
Implementing Strategy in Companies That Compete in a Single Industry
1 Distributed Agents for User-Friendly Access of Digital Libraries DAFFODIL Effective Support for Using Digital Libraries Norbert Fuhr University of Duisburg-Essen,
NORMAPME ISO User Guide for European SMEs The essence of.
Multiconsult.no Sutainable Refurbishment Ljubljana 15th of January 2015 Professor Svein Bjørberg.
Presentation transcript:

multiconsult.no Om forskningsaktiviteter og funn så langt Workshop next 2014, Multiconsult Oslo Svein Bjørberg

multiconsult.no 2 Agenda Literature review Definitions Oscar Model Determination of cases (selection criteria) Case study template Research assistance NTNU Student works Internal workshops Coming activities

multiconsult.no 3 PROJECT PHASES I. Phase – Different characteristics, means and cases, March 2015 II. Phase – In depth analysis, classification, modelling, October /December 2015 III. Phase – Testing on cases/ March 2016 IV. Phase – End Report, March / June 2016

multiconsult.no 4 DIFFERENT PERSPECTIVES VALUE CREATION CHARACTERISTICS ORGANIZATION OPERATION SERVICES WP1 WP2 ECONOMIC SOCIAL People and Organization ENVIRONMENTAL PHYSICAL Space and Infrastructure ECONOMIC INCENTIVES KNOWLEDGE CONTRACT PROCESSES AND ASSURANCE QUALITY

multiconsult.no 5 DIFFERENT PERSPECTIVES – WP1 VALUE CREATION CHARACTERISTICS ECONOMICLife cycle costs (MOME), financial situation (interest), market, rent costs, space efficiency, interaction of costs, green accounting … SOCIAL People and Organization Usability, Esthetic and Architectural values, Location characteristics, Indoor climate / Comfort, Culture values, Logistics service support … ENVIRONMENTALRenewable energy, Energy efficiency, Environment-friendly materials, Waste management, Energy class … PHYSICAL Space and Infrastructure Technical condition (need for maintenance / technical upgrading), Material quality, Adaptability (flexibility, generality and elasticity), Architectural solutions, Sufficient infrastructure, Accessibility, Space efficiency, Long term solutions …

multiconsult.no 6 DIFFERENT PERSPECTIVES – WP2 VALUE CREATION ORGANIZATION OPERATION SERVICES Environmental funds, Financial supports for testing new trends, Branding, Rewarding, Cost productivity orientation, Changing the energy consumption, Tax reduction… ECONOMIC INCENTIVES Good planner and good management, Changing regulation, New demands from society, Social awareness, User satisfaction, Communication ability, Creating value with society /user… KNOWLEDGE Contract process with dialogue, Contract division, Selection and award criteria, Contracting plan, Clear tasks and definitions, Allocation of responsibility and risks… CONTRACT Process management ability, Political support, User participation, Using value metrics, Performance requirements for each phase, Mechanisms and procedures for ex-ante and ex-post evaluations… PROCESSES AND ASSURANCE QUALITY

multiconsult.no 7 HUMAN RESOURCES A B C ACTIVITIES DEFINITIONS WORKSHOPS DEVELOPING THE TEMPLATES LITERATURE REVIEW SURVEY MASTER THESIS CASE STUDY 1 CASE STUDY 2 … TESTING THE FINAL MODELS PROJECT PARTICIPANTS PROJECT PARTICIPANTS NTNU, HiOA U KARLSRUHE EFL, ESLG STUDENTS NTNU, HiOA U KARLSRUHE EFL, ESLG STUDENTS EXPERTS

multiconsult.no 8 ACTIVITIES Theoretical & Practical background Literature Review (scientific papers, evidence based documents…) Survey Case studies Interviews

multiconsult.no 9 DIFFERENT STAKEHOLDERS (Ulike interessenter) OWNER (Eier) PLANNERS / DESIGNERS (Planleggere/ Designere) CONTRACTORS (Entreprenører og leverandører) FM PROVIDERS (FM- Lev.) USER (Brukere)SOCIETY (Samfunnet) PUBLIC (Offentlige) ARCHITECTS (Arkitekt)CONSTRUCTION COMPANIES (Entreprenører) SERVICE COMPANIES (FM-leverandører) EMPLOYEE (Ansatte) BUILDING AUTHORITIES (Planmyndighetene) LANDSCAPE ARCHITECTS (Landskapsarkitekter) SUB CONTRACTOR (Underentreprenører) SINGLE PURPOSE COMPANIES (Leverandører av enkelttjenester) CLIENT (Kunder) PUBLIC AUTHORITIES (Politiske myndigheter) PRIVATE (Private) CONSULTANTS (Rådgivere) SUPPLIERS (Leverandører) VISITORS (Besøkende) THE NORWEGIAN LABOUR INSPECTION AUTHORITY (Arbeidstilsynet) URBAN DESIGNER (Byutviklere) PATIENT (Pasient) INTERIOR ARCHITECTS/ WORK PLACE DESIGNERS (Interiørarkitekt/ arbeidsplassutforming) STUDENT (Student/ Elever) TENANT (Leietaker) ………………

multiconsult.no 10 Literature study

multiconsult.no 11 Example ValPro

multiconsult.no 12 Definitions (extraction from literature study)

multiconsult.no 13 Literature study

multiconsult.no 14 Norwegian definitions

multiconsult.no 15 Oscar Model – Basic Mind Map Value for user and owner Value contribution Planners, architects, consultants, contractors, deliveries, facility management, service providers

multiconsult.no 16 Oscar Model - Value creation model. CHARACTERISTICS (WP1 - Early phase planning) STRATEGY MEANS (WP2) ECONOMIC CONTRACT OWNER USER C C EPP O O SOCIAL (People and Organization) ECONOMIC INCENTIVES Maximizing value for owner and user over time ENVIRONMENTAL PHYSICAL (Space Infrastructure) KNOWLEDGE PROCESSES AND QUALITY ASSURANCE WP3 – TOOLS AND METHODS D D C C EPP O O D D C C O O D D C C O O D D

multiconsult.no 17 Case to typer 1.Case vi høster erfaringer fra (dokumentsstudier, intervjuer, befaringer) 1.Erfaringer: case som er «i front» innen enkelte områder, eller motsatt – der man kan lære av feil/manglende måloppnåelse etc. 2.Case vi aktivt tar en rolle i og følger, evt. påvirker gjennomføringen av (typisk pågående prosjekt der partnerne er involvert) 1.Følge-case: krever gjerne mer ressurser og må følge prosjektet over tid. Dette bør være case partnerne selv er aktive deltakere i, slik at forskningsarbeidet kan inngå som en naturlig del av daglige oppgaver – og være et positivt bidrag for partner og prosjektet. Tenk vinn-vinn!

multiconsult.no 18 Determination of cases (selection criteria)

multiconsult.no 19 Determination of cases (selection criteria)

multiconsult.no 20 Templates Case study template Questionnaire ­

multiconsult.no 21

multiconsult.no 22 Questionnaire

multiconsult.no 23 Student work WG1 Topic 1 Topic 2 Topic 3 Topic 4 Topic 5 … WG2 Topic 1 Topic 2 Topic 3 … WG3 Topic 1 Topic 2 Topic 3 … Project partners

multiconsult.no 24 STUDENT WORK UNIVERSITY FACULTY STUDENT NAME SUPERVISOR NAME Other Research Funds NTNU Norway QIDI JIANG Marit Støre Valen Svein Bjørberg NTNU – Research assistance for the period (one semester) Master thesis – to be defined SURVEY (October – December) 1.Phase – Preparing the Survey out of Case study template 2.Phase – Distributing it and collecting the results 3.Phase – Evaluating the results

multiconsult.no 25 STUDENT WORK UNIVERSITY FACULTY STUDENT NAME SUPERVISOR NAME THEME – master and doctoral thesis NTNU Norway AMIN HADDADI Olav Torp Anne Kathrine Larsen Value analysis and value management ESLG Kosovo BESNIK VRELLA Svein Bjørberg Service Level Agreement – a tool to ensure the quality of FM delivery VETIOLA RECICA Antje Junghans How is the Integrated FM role practiced among public an private owners ALBANA GJONBALAJ Marit Støre Valen Condition analyses and other KPIs as strategic basis for decision making EFL Slovenia IRENA VRTARIC Alenka Temeljotov Salaj, Svein Bjørberg Green PPP model for the delivery of education infrastructure in Norway and Slovenia by incorporating international experiences NTNU2-3 Master thesisTo be defined

multiconsult.no 26 Workshops Partner group ­ WS1 20 th of February ­ WS2 17 th of June ­ WS3 31 st of October Internal (smaller groups) ­ WSI1 24 th of September (KS, ØMF, UiA, MC) ­ WSI2 29 th of October (MC departments) Meetings ­ Different meetings with possible new partners

multiconsult.no 27 Coming activities Testing and improving templates ­ Next week: internal by MC and NTNU Interviews and Survey, collecting information ­ Case study  Partners (use your employees and partners in the case!!) »MC gives instructions on how to do ­ Questionnaire  Trondheim area  “all over” through organizations (RIF, NBEF +++) Conference ­ 28 th of November: Invited conference from breakfast to lunch

multiconsult.no 28 Takk for innspill fra dere, og takk for meg ICEconsult Hospitali tet NN Eiendomsutvikler