L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
1 Enhancements to the Linac Coherent Light Source.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
E163: Laser Acceleration at the NLCTA Eric Colby, ARDB For the E163 collaboration Safety Overview Committee Meeting Sept. 19, 2002.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Control configulation for S1G module operation H. Hayano version 1.
By Reza Esfandiari, SULI Program Mentor: Carsten Hast August 14, 2009.
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
NLCTA and ESA (Next Linear Collider Test Accelerator and End Station A) Carsten Hast Test Facilities Department Head SLAC DOE HEP Review July 7 – 9, 2008.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Marc Ross The Normal-Conducting Linear Collider preparation - status and plans.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Refurbished Booster RF John Reid October 24, 2012.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
L-band test stations in End Station B Richard Swent.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
ABT-EC EYETS Activities 2nd reports
ATF/ATF2 Control System
Chris Adolphsen Sergei Nagaitsev
ATF2 Magnet Power Supplies
LUSI Coordination with LCLS
352MHz Klystron Control for the 3MeV Linac test stand
Facility upgrade Housekeeping, rad waste segregation, chemicals, safety issues, new configurations. Please see me or Keith.
X-band Facilities and High Gradient Tests Stands Around the World
UITF MPS system requirements
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
RF Local Protection System
Operational Experience with LCLS RF systems
UITF Conduct of Operations Review
SuperKEKB required (e+ / e-)
Needed for Team A on -End
Presentation transcript:

L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures and power sources as well as beam optical, diagnostic and collimation systems. Operates and supports the large test facilities at SLAC End Station B NLCTA X-Band RF L-band RF  SNS and Marx Test Stands End Station A FACET Contributions to ATF/ATF2 program at KEK Support for LCLS hard- and software development People Five engineering physicists, two technicians

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 2 End Station B (ESB)

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 3 Marx Test Stand Marx Modulator

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 4 Marx Test Stand Toshiba MB Klystron

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 5 Marx Test Stand Needed to install a new electrical and cooling water infrastructure

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 6 Marx Test Stand *Control system for the klystron based on the new Fast Fault Finder F3-Boards. *F3-boards have fast inputs to monitor RF and to turn power off within the pulse if a fault occurs *F3-boards have slow inputs which monitor the conventional systems (water flow, temperature, magnets, heater, vacuum, etc.). *Needed to develop several different styles of signal conditioning and processing. *Slow control is backed with a conventional approach using relays

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 7 Marx Test Stand

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 8 Marx Test Stand Current Status *Marx Modulator functionality and safety systems were thoroughly checked out *Klystron F3-slow control and relay based interlock systems were tested and certified *Currently finishing a firm ware upgrade in the Marx control software *Need to perform spark down tests and verify the F3-board’s fast interlocks *In about 2 weeks will connect Marx to the MB klystron

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 9 SNS Test Stand SNS Modulator

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 10 SNS Test Stand Klystron and Controls

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 11 SNS Test Stand Test area in NLCTA……and in ESB

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 12 B-Target Room and ESB for KC and CTO Testing

SLAC ART Review April , 2009 Carsten Hast ARD-TF Department Page 13 End Station B (ESB) You are welcome to see all that tomorrow morning during a tour of ESB