19-09-2005AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.

Slides:



Advertisements
Similar presentations
Geometry Chapter 2 Review 11 February 2014Geometry Chapter 2 Review2 Chapter 2 Review Work quickly. Only copy what is necessary. Use.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Coursework Airport Departures. How to fly... Buy the ticket – you now have a place reserved on a flight. – You now have a ticket (often this is virtual)
Controls Configuration Service Overview GSI Antonio on behalf of the Controls Configuration team Beams Department Controls Group Data & Applications.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Selected Subjects on Controls System - Quality Assurance P.Charrue On behalf of the AB Controls Group LHC Machine Advisory Committee 16 June 2006.
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April –
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
PSB DSP Based Low Level RF Operational Experience. April 2015 M.E. Angoletta, A. Blas, A. Butterworth, A. Findlay, S. Hancock, M. Jaussi, J.Molendijk,
Stephane Deghaye (AB/CO) ATC/ABOC days.
Maintenance concept of existing injector controls until replacement Eugenia Hatziangeli AB/CO ABOC/ATC Jan 2008 Input from E. Roux, V. Baggiolini,
© 2001 By Default! A Free sample background from Slide 1 LEIR Application Project LEIR Applications is a separate project.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Application Development for Operations in the Coming Years Mike Lamont.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
25/01/2001 PS days - Evian Application software Status and trends Marine Pace Marine Pace.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
FESA FRONT-END SOFTWARE ARCHITECTURE [FESA] Michel Arruat, Leandro Fernandez, Stephen Jackson, Frank Locci, Jean-Luc Nougaret, Maciej Peryt, Anastasiya.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
BE-CO review Looking back at LS1 CERN /12/2015 Delphine Jacquet BE/OP/LHC Denis Cotte BE/OP/PS 1.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Archives/References for SPS Faraday Cage Timing Vito Baggiolini AB/CO after discussions with M. Arruat, J.-C. Bau, R. Billen, A. Butterworth, F. Follin,
Introduce of Linac Control System Xiangcheng.Kong Control Group.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre.
LEIR Ar11+ ISSUES FOUND DURING OPERATION S.PASINELLI BE-OP-AD.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
AB-CO Review Controls for BDI
SPS Applications Software issues - startup in 2006 and legacy problems
ToPO Tools for PS Operation
Update on BISW EYETS activities
Controls & software Andy Butterworth.
Status and Plans for InCA
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Evolution and future of the Access safety and control systems
Post-mortem of Experience with LEIR Controls
Michael Benedikt AB/OP
Presentation transcript:

AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli

AB / CO Review2 PS Complex accelerators Accelerators (In use)  Linac 2 (p+)  Linac 3 (ions)  Booster (p+)  PS (p+, Ions)  ADE (p-) Accelerator (In commissioning)  LEIR (ions) Accelerator (In studies)  CTF (e+)

AB / CO Review3 PS Complex accelerators Accelerators (Future)  Linac 4  Elena Experimental areas  Isolde (HRS – GPS),  East Hall  nTof  ADE (ATHENA – ASACUSA - ATRAP)

AB / CO Review4 Control Software OP definition Suite of coherent software, used by the operation group to control and make diagnoses on the accelerators. Controls and the diagnosis must be possible on all the parts of the PS Complex accelerators. The availability and reliability must be very high. All interventions, modifications and evolutions must coherent and be planned in order to avoid the disturbance of the accelerators and physics.

AB / CO Review5 Generic Controls Start-up 2006 Console manager Working set + knobs References Archives nAos GFA editor Sampler

AB / CO Review6 Generic Controls Start-up 2006 PLS Alarms  Equipment Setup (single / multiple) Infos  DSC Status Reboot infos

AB / CO Review7 Generic Application Start-up 2006 ABS Tomoscope BSM SEM grid OP display Beam statistics eLogbook EqpSurvey

AB / CO Review8 Specifics Application Start-up 2006 Labview  Spill analyzer  LHC TT2-TT10 Pick-ups  CCC signals Cycle editors Etc..

AB / CO Review9 To be Debugged or Developed Passerrelle (Server + DLL)  Varilog Refresh data  No synchro. received from DSC Timing diagnostic  Useful for OP & CO

AB / CO Review10 To be Debugged or Developed Fly wire  Data transmission  Data treatment Standard CO access of vacuum data  Data correlation Labview  OASIS  Labview

AB / CO Review11 CO Support CO components CCC Windows & Linux consoles Labview HW infrastructure eLogbook  Server  Database Passerrelle  Server  DLL

AB / CO Review12 To be clarified CO support for CPS complex applications CO diagnostics tools Schedule for new CO tools  LSA  FESA PICO role in the CPS environment Database intervention

AB / CO Review13 Remark All java applications developed in the PS framework must be compatible with the new java environment and full operational at the 2006 startup. PS Java applications deployed  PS  PSB  ISOLDE  ADE

AB / CO Review14 Conclusion For 2006 we want for all accelerators, all software with the same functionalities and reliability that we had in 2003 – 2004 Q1