1 The Ramifications of the New Transformer Efficiency Standards from DOE IEEE REPC Meeting Charleston, SC 4/29/08 Alan L. Wilks Chief Technical Officer.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Advanced Piloting Cruise Plot.
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Part 3 Probabilistic Decision Models
Inventory Systems for Dependent Demand
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Create an Application Title 1A - Adult Chapter 3.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
Break Time Remaining 10:00.
Discussion Topics Overview of Water Rates in California Legal Framework of Water Rates Water Consumption Patterns Empirical Data – City of Fresno The.
Netique InfoTech (P) Ltd. Welcomes you for the Presentation of Netique Deckle Matcher.
DOE Distribution Transformer Efficiency Regulation Evaluation of Impact on the Industry Carlos Gaytan Manager of Engineering Distribution Transformers.
The Price System The market system, also called the price system, performs two important and closely related functions: Price Rationing Resource Allocation.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 Price Risk Management and the Futures Market Hedging.
Chapter 11 AC Power Analysis
Capacity Planning For Products and Services
Capacity and Constraint Management
Capacity and Constraint Management
VOORBLAD.
15. Oktober Oktober Oktober 2012.
LONG-RUN COSTS In the long-run there are no fixed inputs, and therefore no fixed costs. All costs are variable. Another way to look at the long-run is.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Measurements and Their Uncertainty 3.1
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Chapter 5 Microsoft Excel 2007 Window
1..
1 ENERGY Gr. 5 Science: Conservation of Energy & Resources BY Full Name Science Unit PowerPoint Outline by Miss Berndl 2009.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Select a time to count down from the clock above
CpSc 3220 Designing a Database
Presentation transcript:

1 The Ramifications of the New Transformer Efficiency Standards from DOE IEEE REPC Meeting Charleston, SC 4/29/08 Alan L. Wilks Chief Technical Officer

2 Discussion Outline 1.How the DOE Rule Impacts: Cost Delivery Size Loss Formulas Testing Future Changes 2. Example Calculations

3 Impact on Cost Major factors on Cost Raw Material Cost Core Steel – UP (DOE uses more, all high quality) Copper – UP (DOE uses more) Aluminum – UP (DOE uses more) Oil – UP (DOE uses about same or less)

4 Raw Material Cost History

5 Impact on Cost Availability of Raw Materials Core Steel – Limited Supply (High Quality) Major factors on Cost (Cont.)

6 Availability of Raw Material – Core Steel X X X X X X – High quality (M3 or better) steel producers

7 Continued high demand in China Domestic steel vendors plans: Modest production increases by 2010 No plans on adding significant capacity Takes 3 years after deciding Availability of Raw Material – Core Steel World shortage of high quality core steel

8 Core Steel Consumption Consumption based on 2007 usage, an average production year Actual2007 Converted to DOE Transformer Full Capacity M6 M2 M3 Allotment

9 Impact on Cost Major factors on Cost (Cont.) Production Capacity Higher efficiency transformers require:  Larger cores  More winding turns Results in more manufacturing time, slightly limiting production capacity

10 Overall Impact on Cost DOE estimated an increase in first cost of 6-12% Based on 2006 material costs and no escalation This estimate was a generalization and too low Impact on cost depends upon individual utility purchasing techniques Difficult to predict costs next month, let alone 2010 Best way to determine cost impact is to get quotes on DOE and non-DOE transformers

11 Impact on Delivery Delivery will be impacted as materials are in short supply Steel vendors will continue to have manufacturers on allocation Core steel rationing may cause transformer production to be limited ERMCO will support long-standing customers as first priority

12 Impact on Delivery Storm emergency transformers will be greatly impacted Options will be: Build storm restoration units and delay others Utilities carry more inventory Distributors carry more inventory Petition DOE for a temporary waiver for storm units

13 Impact on Size (1Ø)‏ +27#, =Size +43#, -4”H +68#, +1”D +46#, +4”D Change

14 Impact on Size (3Ø)‏ -378#, -4”W -115#, =Size +165#, =Size Change

15 Impact on Loss Formula Non-Compliant Compliant 98.91%

16 Impact on Loss Formula Generally Speaking – Loss formulas of $4.50/$1.00 for 1Ø and $3.00/$1.00 for 3Ø usually meet DOE Higher formulas will result in more efficient units than DOE Lower formulas will have no effect on efficiency, but may shade the loss ratio in one direction or another to minimize TOC No formula will result in lowest cost without regard for TOC

17 Impact on Loss Formula Since formulas reflect the Total Owning Cost Continue to use a formula if believed to be accurate. Using a formula will result in: An optimum ratio of core to winding loss A most cost effective design based on TOC Not using a formula will result in: A DOE design at minimum cost.

18 Impact on Testing Manufacturers must verify compliance by: 100% testing, or Alternative Efficiency Determination Method (AEDM) sampling plan Enforcement is by the Honor System Manufacturers must report lowest efficiency models to DOE Violators will be found by whistleblowers DOE may seek civil penalties for non- compliance

19 Tolerances The stated DOE efficiency levels are minimum averages for a model A model is defined by electrical characteristics However, DOE allows a tolerance The average efficiency of the sample X must be: Avg.Eff.(X) ≥ 100 / (1+(1+0.08/SQRT(n))*(100/RE-1))‏ Where:n = number of units in sample RE = represented efficiency (DOE’s specified value)‏

20 Example Tolerance (25 kVA)‏ Avg.Eff.(X) ≥ 100 / (1+(1+0.08/SQRT(n))*(100/RE-1))‏ RE = 98.91% Efficiency For: nAvg.Eff.≥

21 Future Changes ? Lawsuits may affect future efficiency levels Earthjustice has filed suit on behalf of: Sierra Club National Resources Defense Council (NRDC)‏ California Attorney General’s office has filed a similar suit Both suits claim the standards are too weak and will lead to excessive energy consumption and unnecessary global warming pollution

22 Future Changes ?

23 Future Changes ? Fast track temporary waiver of DOE efficiency requirement in the event of storm emergencies.

24 Supplemental Information Example Calculations

25 Example Calculations Efficiency = Output / Input kVA*1000 / (kVA* Losses)‏ DOE Basis No Load 20°C Load 55°C (exc. auxiliary losses)‏ 50% load Eff = kVA*1000*0.5 / [kVA*1000*0.5 + NL 20°C + LL 55°C *(0.5) 2 ]

26 Example Calculations (cont.)‏ Temperature Corrections No Load If quoted at 85°C, then NL 20°C = NL 85°C * TCF where TCF = = * (85° - 20°)‏ No Load If quoted at 85°C, then LL 55°C = LL 85°C * TCF where TCF = for AL/AL (225+55)/(225+85)‏ for CU/AL (229+55)/(229+85)‏ for CU/CU( )/( )‏

27 25 kVA Example Losses: NL 20°C = 60 watts LL 85°C = 334 watts (CU/AL) Efficiency Calculations: LL 55°C = 334 * = Eff = 25,000*0.5/(25,000* *0.5 2 )‏ Eff = 98.93% DOE Rule = 98.91%, therefore this unit meets DOE

28 ERMCO Contact Information Alan Wilks – ERMCO (800) (731)