Maintenance Utilization TECH 58100 Project Analyze Phase Chris Gray 11/14/2013.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

1 Chapter 58 - Clinical Syndromes of Metabolic Alkalosis Copyright © 2013 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 14.
1 Introducing the Specifications of the Metro Ethernet Forum.
For DBEs You Are the Message Speaker: Larry Sunday Altorfer.
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Meeting Customer Expectations Through Performance Measurement in New Hampshire Christopher D. Clement, Sr. June 10,
Demand Response: What Is It? John E. Shelk President & CEO, EPSA Harvard Electricity Policy Group Calgary, Alberta – June 13, 2013.
Washington State Auditors Office Troy Kelley Independence Respect Integrity Regulatory Reform: Improving Permit Timeliness Joint Legislative Audit and.
Best Fleet Practices Award Winning Tips General Services Conference April
Maintenance Utilization TECH Project Champion/Define Phase Chris Gray 10/2/2013.
Integrated Business Statistics Program (IBSP) Introduction Daniela Ravindra Director, Enterprise Statistics Division November 9th, 2010.
Chapter 11 Software Evolution
Solving Absolute Value Equations Solving Absolute Value Equations
1 Key facts about the proposals: What is FRS 101? Qualifying entities need not disclose: – A cash flow statement (IAS 7); – Related party transactions.
Maintenance Utilization TECH Project Measure Phase Chris Gray 10/2/2013.
Unit 14 Assessment Objective Three. Unit 14 Assessment Objective Three.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Energy Efficiency at Marathon Petroleum Wayne Kinnel Catlettsburg Energy Coordinator 1.
Phase Difference = Phase Difference = 0.05.
TECH Project Title: Customer service management in automotive industries Analyze Phase Date: 11/19/2014 Team member: Ponnappa Bheemaiah.
QC Throughput Rate Improvement Increase productivity from 55 units/8 hrs/person to 60 units/8 hrs/person On time delivery Decrease in unit cost Improved.
Mastering, Improving and Managing of the Advanced Metering Infrastructure (AMI) Implementations Date: November 19, 2014 Team members: Joe Jones TECH
Herbarium Digitization Workshop Institute for Digital Information & Scientific Communication – Florida State University 1 Digitization Workflows Gil Nelson.
ANALYSIS REQUIREMENT ANALYSIS DESIGN IMPLEMENTATION TEST.
NEED EQUIPMENT SERVICE?. What is CFESA? The Commercial Food Equipment Service Association is the trade organization of professional service.
Curriculum development A brief guide to the construction of relevant curricula.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
Every student. every classroom. every day. Creating a Service Culture MSDF Impact Assessment.
Financial Statements Presented by: Leo Ashley Tony David Sungtae.
D AMAGE P REVENTION : A RE THE S TATES AS E NGAGED AS T HEY N EED TO B E ? C HRISTINA S AMES V ICE P RESIDENT O PERATIONS & E NGINEERING A MERICAN G AS.
Top 10 TOP 10 REASONS TO OUTSOURCE STATEMENT PRINTING/MAILING David Yates, VP Sales Southeast Region.
0 CHAPTER 3 Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows © 2009 Cengage Learning.
Systems Engineering Conceptual System Design. Systems Engineering and Analysis, B.S. Blanchard and W. J. Fabrycky, 3 rd edition, Prentice-Hall, 1998.
The ArcGIS Platform for Storm Response in Electric Utilities Kevin Kirk & Brian Baldwin.
Re-Engineering and Re-Organisation of the Revenue Management Function Project Overview August 2007.
CSC480 Software Engineering Lecture 8-9 September 20, 2002.
Value Chain Analysis Group 12 – 3. Primary Activities Analysis Primary Activities Support Activities Support Activities Analysis Primary Activity ☑ Core.
Customer Relationships
Abel Electric Repair Income Statement, CH1, AP2 Jeff Tsui Wilson Chien Annie Huang Sun Yangiu.
Week 10 Common Industrial Building energy efficiency measures (Energy Management Opportunities)
1 CHAPTER 4 Audit Evidence and Programs. 2 financial statements financial statement cycles management assertions general audit objectives specific audit.
Progressive Energy, Environment, & Sustainability Summit 17 Denver, CO Compressed Air - What a Waste! Presented by: September 17, 2013.
Water Utility General Overview Revenues Overall Revenue Increase 2.6% Expenditures. Overall Expenditure decrease of 1.3% Reservoirs Supplies 203.6% Hydrant.
Do you Have a Problem For- For-. Techiezoncall.com Techiezoncall.com Offers Online Technical Support To Global Customers, Just
Bitdefender Support Number for Help
MS Office Help Support Toll Free :
Future Rail and Road developments
Process Layout Chapter #6.
Gmail tech 1~ support Number. Gmail Tech Support Number.
Jerry-Ann L. Oluya BEN-32.   Scheduling is to establish the timing of the use of equipment, facilities, and human activities in an organization. The.
Acer Technical Support NZ Number

Quicken Support Phone Number More info :
This presentation uses a free template provided by FPPT.com Human Resource Management
This presentation uses a free template provided by FPPT.com Human Resource Management
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
+61. Avira Tech Avira customer support.
WELCOME T0 CANON PRINTER SUPPORT Helpline Number
Energy Tracking, Monitoring and Reporting
Emergency Management ESFs NIMS, ICS, and HICS Regulations and
5.08 ASSET MANAGEMENT AND DECISION SUPPORT IN A COST-CUTTING REGIME
HP Printer
Emergency Management ESFs NIMS, ICS, and HICS Regulations and

Elevator-Escalator Reliability Failure notification

The Basis of Inventory Control
Public Works 2020 Budget and CIP Review.
We are independent provider of technical support services. All the trademarks, names and logos on this site are the properties of their respective owners and are shown for reference purposes only. We disclaims any association or ownership of such third pa
Presentation transcript:

Maintenance Utilization TECH Project Analyze Phase Chris Gray 11/14/2013

Brief Review of Project Maintenance organizations must operate as an independent entity within a business. Their focus must be customer service with attention on equipment up-time, equipment availability, timeliness of repairs; along with cost. The opening statement of the business case was reiterated to re-enforce the point of maintenance efficiency and cost reduction. Utilizing your system and resources is essential to providing your customer with timely repairs at a low cost. Goals:  Reduced time for general repairs –repairs made <4 weeks  Increased customer satisfaction  Reduced maintenance backlog –reduce work order backlog by 50%

CTQ Tree CustomerCTQKPOVs KPIVs Maint Backlog Levels WORK ORDER REQUESTORWork Orders Completion Time to completion Work Order Execution # of Craft per WO Emergency/Safety WO Increased Maint Personnel Usage Craft Utilization Time

Data Collection Summary Data collection will be completed on Facility Management System (FMS) work order system. All work orders (1/1/13 to 11/12/13) will be reviewed. As found in the measure phase of the project, FMS has revealed some limitations on data collection. Based on the findings, data will only be collected and analyzed for KPOV “Work Order Completion” and KPIV(S) “Maintenance Backlog Levels” and “Time to Completion”. Collection Period: 1/1/13 – 11/12/13 Sample: Open & Closed (All Departments) Raw data was not included due to the amount generated for this analysis.

KPOV Graphs –Work Order Completion

Fishbone

KPIV Graph – Time to Completion

KPIV Graph- Maintenance Backlogs

Conclusion  There are opportunities with the software. Had to get the architect to pull data for analysis. The general user cannot query and retrieve information.  Time to completion has a bell shaped curve. The majority of work orders, 707 of them, are completed the day of issue. If the work order is not completed on the day of creation there is a potential it will be completed after being open for 30 days.  Maintenance Backlogs are somewhat consistent with the exception of Automation and Injection. - Continued on next Slide- Maintenance Backlog % Open Work Orders AutomationBlowInjectionTechnologySafety 67%20%47%24%14%

Conclusion - Continued  Automation has three total work orders.  Injection has 146 open and 164 closed or 47% Open. This shows an inconsistent ability to execute work orders on time.  The sample size was 1674 work orders. The average time to completion was 38 days. As of 11/12/13 there are 420 open and 1254 closed work orders. There is a 75% closure rate for work order issued in 2013.