Proposal for RENO-50 Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Fill in missing numbers or operations
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Custom Services and Training Provider Details Chapter 4.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
SOLVING EQUATIONS AND EXPANDING BRACKETS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Turing Machines.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 Using one or more of your senses to gather information.
Equal or Not. Equal or Not
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
“Reading Measurement Scales”. MNI = marked number interval AMI = adjacent number interval.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Recent Results from RENO & Future Plan
Prospects for 7 Be Solar Neutrino Detection with KamLAND Stanford University Department of Physics Kazumi Ishii.
Soo-Bong Kim Seoul National Univ. Current Status of RENO (Symposium on “Physics of Massive Neutrinos” May 20-22, 2008, Milos, Greece)
Simulation study of RENO-50 Jungsic Park Seoul National University RENO-50 International Workshop June 13-14, 2013 Hoam Faculty House, Korea.
Eun-Ju Jeon Sejong Univ. Sept. 09, 2010 Status of RENO Experiment Neutrino Oscillation Workshop (NOW 2010) September 4-11, 2010, Otranto, Lecce, Italy.
Soo-Bong Kim Seoul National Univ. RENO for Neutrino Mixing Angle  13 5 th International Workshop on Low Energy Neutrino Physcis (Neutrino Champagne LowNu.
RENO & RENO-50 Soo-Bong Kim (KNRC, Seoul National University) “NOW 2014, Conca Specchiulla, Otranto, Lecce, Italy, September 7-14, 2014”
Future Reactor Neutrino Physics Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”
Status and Prospects of Reactor Neutrino Experiments Soo-Bong Kim (KNRC, Seoul National University) “NuPhys 2014: Prospects in Neutrino Physics, London,
K.K. Joo Chonnam National University November 13, Kavli, IPMU, Japan Neutrino Program in Korea (RENO/RENO-50/AMoRE/SBL) Neutrino Program.
“RENO/RENO-50” K.K. Joo Chonnam National University
Overview of the Jiangmen Underground Neutrino Observatory (JUNO)
June-Ho Choi (Dongshin University)
Design Requirements for Jinping Underground Neutrino Experiment
Overview of the Jiangmen Underground Neutrino Observatory (JUNO)
Presentation transcript:

Proposal for RENO-50 Soo-Bong Kim (KNRC, Seoul National University) “International Workshop on RENO-50, June 13-14, 2013”

Overview of RENO-50  RENO-50 : An underground detector consisting of 18 kton ultra- low-radioactivity liquid scintillator & 15,000 20” PMTs, at 50 km away from the Hanbit(Yonggwang) nuclear power plant  Goals : - High-precision measurement of  12 and  m Determination of neutrino mass hierarchy - Study neutrinos from reactors, (the Sun), the Earth, Supernova, and any possible stellar objects  Budget : $ 100M for 6 year construction (Civil engineering: $ 15M, Detector: $ 85M)  Schedule : 2013 ~ 2018 : Facility and detector construction 2019 ~ : Operation and experiment

Far Detector Near Detector RENO kton LS Detector ~47 km from YG reactors Mt. Guemseong (450 m) ~900 m.w.e. overburden

Funding  1 st attempt in 2012 : almost successful but failed  Continuous attempts with organized efforts : - Korea has significantly increased investments into the basic science. - Korea established a new institute of IBS in Complete a conceptual design based on more detailed MC studies and optimized detector design. - Prepare a well-written proposal. - Form international collaboration (LOI)

Technical Challenges  Large detector (18 ktons) : D=30m, H=30m  3% energy resolution : - High transparency LS : 15 m → 25 m (purification & better PPO) - Large photocathode coverage : 34% → 67% (15,000 20” PMT) - High QE PMT : 20% → 35% (Hamamatsu 20” HQE PMT) - High light yield LS : ×1.5 (1.5 g/ℓ PPO → 5 g/ℓ PPO) KamLANDRENO-50 LS mass~1 kt18 kt Energy Resolution 6%/  E3%/  E Light yield250 p.e./MeV>1000 p.e./MeV

Expected Energy Resolution PMT coverage : 67% (15,000 20” PMTs) + Attenuation length : 25 m + QE : 35%

25 m 27 m 25 m 27 m LS (10 kton) ” PMTs (24%) Mineral Oil 32 m Water ” OD PMTs Conceptual Design of RENO m 32 m 30 m 32 m LS (18 kton) ” PMTs (67%) Mineral Oil 37 m Water ” OD PMTs

Physics Goals  Precise measurement of  12,  m 2 21 and  m 2 31 (← 5.4%)(← 2.6%)(← 5.2%)  Determination of mass hierarchy (sign of  m 2 31 or  m 2 32 ) - Quite challenging : requires extremely good energy resolution  Neutrino burst from a Supernova in our Galaxy - ~5400 events kpc) - A long-term neutrino telescope  Geo-neutrinos : ~ 900 geo-neutrinos for 5 years - Study the heat generation mechanism inside the Earth

Schedule  2013 : Group organization Detector simulation & design Geological survey  2014 ~ 2015 : Civil engineering for tunnel excavation Underground facility ready Structure design PMT evaluation and order, Preparation for electronics, HV, DAQ & software tools, R&D for liquid scintillator and purification  2016 ~ 2018 : Detector construction  2019 ~ : Data taking & analysis

Your ideas and participation invited!