Development update for BOF meeting – 14 June 2005.

Slides:



Advertisements
Similar presentations
EU Presidency Conference Effective policies for the development of competencies of youth in Europe Warsaw, November 2011 Improving basic skills in.
Advertisements

Advanced Piloting Cruise Plot.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Erasmus Mundus Information Day 20 January Erasmus Mundus Information Day 20 January ERASMUS MUNDUS PREPARING YOUR APPLICATION.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
Vienna, | Slide 1 EUROPEAN ENVIRONMENT AGENCY EUROPEAN TOPIC CENTRE ON WATER Quality of Groundwater in Europe Vienna, 22 June 2005 Andreas Scheidleder.
Scaling up the global initiative on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the.
1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
The National Standards and Quality System Jean-Louis Racine The World Bank Cambridge, England April 19, 2007 Knowledge Economy Forum VI Technology Acquisition.
DG REGIO – Unit "Thematic Development" EUROPEAN COMMISSION EN 1 Transport and Regional Policy Transport and Regional Policy Patrick.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
The European Qualifications Framework (EQF)
1 7 th Progress Report: The regional and urban dimension of Europe 2020 Lewis Dijkstra Deputy Head of the Analysis Unit DG for Regional Policy European.
Regional and national initiatives in support of European Technology Platforms Dr. Fiona Williams Chairman, eMobility steering board
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
Making the System Operational
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
1 Incorporating Extreme Weather Risks in Asset Management Planning Lynn Clarkowski.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Vision: A strong and capable civil society, cooperating and responsive to Cambodias development challenges 1.
Bridge Owners Forum Code of Practice for Bridge Management Research Opportunities Graham Cole s.
1 Risk Reasoning Ltd Risk Management Made Easy Mark Swabey & Stuart Gruszka If I were you, I wouldnt start from here Getting Enterprise Risk Management.
Effectively applying ISO9001:2000 clauses 6 and 7.
ABC Technology Project
IHPA and the National Efficient Price (NEP) Independent Hospital Pricing Authority.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Drystone Retaining Walls Presentation to Bridge Owners Forum at Kings College, Cambridge 13 May 2008.
Journey Management Nigel DAth Journey Manager Bay of Plenty RTIM Seminar 18 March 2014.
Current Status of Japanese Road Bridges and Future Perspective
Pavement, Geotechnical and Structures Group Safety Standards and Research Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
Proactively Preventing Freight Wagon Derailment Innotrans | Berlin| 18 th September Dr Björn Paulsson (UIC) Grigory Kozyr(UIC) Gordana Vasic (NewRail.
25 seconds left…...
Unlocking the potential from UKCS low deliverability reservoirs Colin Cranfield (DTI) Pete Naylor (ECL Technology)
Korkeakoulujen arviointineuvosto — Rådet för utvärdering av högskolorna — The Finnish Higher Education Evaluation Council (FINHEEC) eLearning and Virtual.
Week 1.
We will resume in: 25 Minutes.
PSSA Preparation.
Development update for BOF 20. Slide 2 CIRIA Arch Manual Now published Available for free download from CIRIA web site.
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Leeds -14 June 2005.
CONDITION APPRAISAL AND REMEDIAL TREATMENT CIRIA Research Project RP692 MASONRY AND BRICK ARCH BRIDGES:
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum – Cambridge –26 Sept
Asset Management Performance (Structures) Awtar Jandu Safe Roads, Reliable Journeys, Informed Travellers Bridge Owners Forum Cambridge -13 September 2005.
Development update for BOF /18/9b. Slide 2 CIRIA Arch Manual final draft approved by SG internal CIRIA review completed final edit by research.
Development update for BOF 17. Slide 2 CIRIA Arch Manual final draft circulated to SG for comment internal CIRIA review completed returned to research.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Loddon Campaspe Integrated Transport Strategy
Loddon Campaspe Integrated Transport Strategy
Presentation transcript:

Development update for BOF meeting – 14 June 2005

Slide 2 Outline main projects –discussed in detail smaller projects/collaborative networks/ watching brief trade bodies/liaison groups recent finishes proposals under consideration what are you doing?

Slide 3 Main Projects EU –Sustainable Bridges CIRIA –arch bridge manual –tunnel manual Advanced composites –joint venture

Slide 4 Sustainable Bridges “Assessment for future traffic needs and longer lives” Integrated Project funded through EU 6 th Framework programme - €10m project, €7m from EU, 32 partners from all over Europe. Response to EU objective of a 30% increase in rail passenger traffic & tripling of rail freight in 30 years

Slide 5 CIRIA Arch Manual (1) title not finalised – currently “Masonry arch bridges: management appraisal and remedial treatment” in same series as current CIRIA publications on embankments and cuttings cost about £150K (including in kind), cash funding from DfT through Roads Liaison Group & Bridges Board and from Network Rail ideally it will be “all you ever wanted to know about arches, but were afraid to ask”

Slide 6 CIRIA Arch Manual (2) research contractor –Mott Macdonald, supported by Prof Clive Melbourne (Salford University), Nisar Sawar (Birse Rail) and Carlos Sicilia (WK Ltd) steering group –about 20 people from all parts of industry final draft being circulated for comment publication later this year –electronic and hard copy

Slide 7 CIRIA Tunnel Manual (1) following on from arch manual total cost also about £150K, funding from more individual sources – including Network Rail research contractor – Mott Macdonald, supported by Prof Chris Clayton (Southampton University) and Kevin Roberts (Atkins/Trans4m)

Slide 8 CIRIA Tunnel Manual (2) steering group about 10 people, including Colin Sims first draft recently circulated –still very rough and ready –second draft due May 2005 publication expected early 2006

Slide 9 Advanced composites Exclusivity of MouchelParkman/TGP joint venture under review –possible that two further consultancies (also working as a joint venture) will be approved CETAN being reviewed –issue 3 expected soon Autumn road shows –nominations needed from TCE organisation

Slide 10 Smaller projects (1) CIRIA –manual on the use of rock in hydraulic engineering –whole life asset management across industries DTI –TSET (LSBU) –MMS 6 (OBU) –ACLAIM (AEAT) –monitoring of concrete structures (CIRIA) –specification for concrete durability (BRE)

Slide 11 Smaller projects (2) Mining related (with JS) –NDE for detecting mine shafts –monitoring and treatment of shallow mine workings –updated specification for procurement of mining related NDE

Slide 12 Smaller projects (3) Universities –Bath shear assessment/strengthening of older pre-stressed concrete beams –Cardiff usage cost drivers for masonry arch bridges –Glamorgan infra-red thermography for detecting faults in FRP –Keele non destructive evaluation of reinforced concrete

Slide 13 Smaller projects (4) Universities (cont) –Salford soil/structure interaction in arch bridges –Southampton wrought iron characterisation for FRP strengthening –Surrey FRP patch repairs for fatigue enhancement residual fatigue life in elderly wrought iron bridges

Slide 14 Collaborative Networks European –SafRelNet –ConRepNet UK –SIMoNET –SMART Net –NGCC

Slide 15 Trade Bodies CIRIA Concrete Society –Institute of Corrosion liaison Concrete Centre Concrete Bridge Development Group –fast construction task group –strengthening task group Steel Construction Institute –steel piling group –steel bridge group

Slide 16 Liaison Groups Bridge Owner’s Forum –mainly research focussed, but looks at some policy issues Bridges Board –Policy advice to DfT re highway bridges Bridgeguard 3 –CSS –LoBEG

Slide 17 Watching brief (1) Highways Agency –additional parts for BA86 (NDE manual) –review of BA79 – management of sub standard bridges –replacement of BD52/TD19 - road restraint systems –parapet sector scheme BSI –Committee B/509/1 BS EN Road restraint systems BS6779 Pt 4 – Masonry bridge parapets

Slide 18 Watching brief (2) British Board of Agrèment –NTC17 – bridge expansion joints –HAPAS SG13 - scheme for composites approval –Level crossing panels DfT Bridges Board –bridge management code of practice –performance indicators for highway bridges TWI –CSWIP accreditation scheme for composites application

Slide 19 Watching brief (3) European Technology Platform for Construction RSSB –safe management of railway structures –scour and flooding

Slide 20 Recent finishes (1) BRE –“Triggers for Intervention” –maintenance optimisation tool for concrete structures CIRIA –scour manual –use of FRP for strengthening metallic structures –railway run off –unlocking whole life value (joint with ICE)

Slide 21 Recent finishes (2) Concrete Society –TR57 –revised version of TR55 –electrochemical tests for reinforcement corrosion HR Wallingford –whole life costs in fluvial engineering Nottingham/Cranfield Universities –use of GPS for structural health monitoring

Slide 22 Recent finishes (3) Highways Agency –BA86 Issue 1 –reliability PhDs Imperial –element and system risk considerations in bridge management Surrey –Optimisation of preventative maintenance strategies for reinforced concrete bridges Cambridge –uncertainty between inspection reporting and material quantities and properties

Slide 23 Current proposals (1) DfT Bridges Board –“CIRIA” manual on metallic bridges –assessment of dry stone walls CIRIA –construction risks to transport corridors smart materials KTN Edinburgh University –use of GPR on masonry arches

Slide 24 Current Proposals (2) Surrey University –reliability based bridge inspection frequencies –fatigue crack growth in wrought iron proprietary FRP products for use in bridges Laser deflection monitoring ICE Piling guide Radial pinning for arch refurbishment