Installation and Maintenance of Health IT Systems This material Comp8_Unit11 was developed by Duke University, funded by the Department of Health and Human.

Slides:



Advertisements
Similar presentations
By: Edith Leticia Cerda
Advertisements

Support.ebsco.com Nursing Reference Center Tutorial.
September, 2005What IHE Delivers 1 Presenters: Keith W. Boone, John Donnelly, Larry McKnight, Dan Russler IHE Patient Care Coordination.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
Online Student Success: Teaching the ABCs of Online Proficiency to Produce As, Bs, and Cs in Online Classes.
Making the System Operational
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
1 Looking at the TPBs Draft Participation Plan Presentation to the Transportation Planning Board July 18, 2007 Sarah Crawford Transportation Planner Department.
Program design overview Pre-contract to post-program year Office on Volunteerism and Community Service.
Introduction to Homeless Management Information Systems (HMIS)
Case Study: Developing an EMR Implementation Schedule at UVA Health System Paul Dreyer VA HIMSS Student Liaison.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Welcome to Game Lets start the Game. An electronic health record (EHR) is a digital version of a patient’s paper chart. EHRs are real-time, patient-centered.
ARRA Meaningful Use Update Mount Auburn Hospital Information Systems Update March 2011.
Building Your SUSP Team Part II
System Testing 2  Effective March 3, 2014, new requirements for system testing were implemented  State Agencies are now required to provide to FNS:
© Paradigm Publishing Inc Chapter 10 Information Systems.
What is this course? This course is designed to provide a basic awareness and understanding of ICD-10 and why it is so critical to our organization.
Quality Improvement Introduction to Reliability This material (Comp12_Unit3) was developed by Johns Hopkins University, funded by the Department of Health.
Presenter: Jennifer LoGalbo RHP 8 Monthly Learning Collaborative Call February 10,
Ohio Statewide Automated Child Welfare Information System OCF ELC January 19, 2006 SACWIS.
ITIL: Service Transition
What Happens after You Sign with Missouri Health Information Technology Assistance Center?
Health Informatics Series
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
Release & Deployment ITIL Version 3
Current and Emerging Use of Clinical Information Systems
1 Addressing Common EHR Implementation Problems June 18, 2010 Tammy Geltmaker, RN, BSN, MHA EHR Consulting Manager, Health Care Excel Bonnie Hollopeter,
Component 10 – Fundamentals of Workflow Process Analysis and Redesign Unit 10 – Process Change Implementation and Evaluation This material was developed.
Working with Health IT Systems HIT System Planning, Acquisition, Installation, & Training: Practices to Support & Pitfalls to Avoid Lecture b This material.
Presented by Joan Kossow Data Compliance Manager The Changing Face of Claims Processing &
Configuring Electronic Health Records Migration to an Electronic Health Record System Lecture b This material (Comp11_unit1b) was developed by Oregon Health.
Georgia Rural HIT Forum CLINICAL HIT LEADERSHIP – ESSENTIAL ELEMENTS FOR SUCCESS Karen Graves Clinical Systems Analyst - Chestatee Regional Hospital Jennifer.
Installation and Maintenance of Health IT Systems
Working with Health IT Systems Potential Issues with Adoption and Installation of an HIT System This material (Comp7_Unit9) was developed by Johns Hopkins.
Comp 14 - Special Topics in Vendor- Specific Systems Unit 8 - Vendor-Specific Go- Live Strategies This material was developed by Columbia University, funded.
Unit 8a Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
Health Management Information Systems Computerized Provider Order Entry (CPOE) Lecture b This material Comp6_Unit4b was developed by Duke University funded.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
Component 8 Installation and Maintenance of Health IT Systems Unit 1a Elements of a Typical Electronic Health Record System This material was developed.
Component 8 Installation and Maintenance of Health IT Systems Unit 11 Pilot Testing and Full-Scale Deployment This material was developed by Duke University,
Special Topics in Vendor- Specific Systems EHR Go-Live Strategies This material (Comp14_Unit8) was developed by Columbia University, funded by the Department.
Component 8 Installation and Maintenance of Health IT Systems Unit 4 Structured Systems Analysis and Design This material was developed by Duke University,
Unit 8.2: Effective Implementation Planning HIT Implementation Planning for Quality and Safety Component 12/Unit 81 Health IT Workforce Curriculum Version.
Component 8 Installation and Maintenance of Health IT Systems Unit 10 Developing a Test Strategy and Test Plan This material was developed by Duke University,
Working with HIT Systems Unit 8a: HIT system planning, acquisition, installation, and training: Practices to Support & Pitfalls to Avoid This material.
This material was developed by Oregon Health & Science University, funded by the Department of Health and Human Services, Office of the National Coordinator.
This material was developed by Duke University, funded by the Department of Health and Human Services, Office of the National Coordinator for Health Information.
Working with HIT Systems Unit 8b: HIT system planning, acquisition, installation, and training: Practices to Support & Pitfalls to Avoid This material.
Fundamentals of Workflow Analysis and Process Redesign Unit Process Change Implementation and Evaluation.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Working with HIT Systems
Unit 8a: The Implementation Team HIT Implementation Planning for Quality and Safety This material was developed by Johns Hopkins University, funded by.
Unit 7a: Workflow Assessment Safe Workflow Design This material was developed by Johns Hopkins University, funded by the Department of Health and Human.
Installation and Maintenance of Health IT Systems Unit 8a Troubleshooting; Maintenance and Upgrades; and Interaction with Vendors, Developers, and Users.
Patricia Alafaireet  Lecture 2 – Implementation and go-live strategies Data conversion Communication Planning Downtime.
Patricia Alafaireet Patricia E. Alafaireet, PhD Director of Applied Health Informatics University of Missouri-School of Medicine Department of Health.
Installation and Maintenance of Health IT Systems Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Lecture a.
Quality Improvement HIT Implementation Planning for Quality and Safety Lecture b This material (Comp12_Unit9b) was developed by Johns Hopkins University,
Statewide Access Update August 18, 2010 Ohio Department of Health Office of Vital Statistics.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
ITIL: Service Transition
Case Costing at TBRHSC June 2015.
Migration to an Electronic Health Record System
M ERP (Enterprise Resources Planning)
Information Systems Selection
Electronic health record (EHR) software selection and purchase
Installation and Maintenance of Health IT Systems
Component 11 Unit 7: Building Order Sets
Presentation transcript:

Installation and Maintenance of Health IT Systems This material Comp8_Unit11 was developed by Duke University, funded by the Department of Health and Human Services, Office of the National Coordinator for Health Information Technology under Award Number IU24OC Pilot Testing and Full-Scale Deployment

Pilot Testing and Full-Scale Deployment Learning Objectives 1.Identify pilot testing, deployment steps, and group for pilot testing 2.Develop a plan for training pilot users 3.Gather and prioritize feedback from pilot test 4.Recommend amount of legacy data to preload 5.Develop a plan for implementation using best practices 6.Identify post-implementation practices 2 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pilot Testing Trial run of procedures, instruments, & software planned for deployment Pilot group(s) composition dependent upon organization’s size & structure. –Consider steering committee for selection. –Ensure adequate cross-section of users. –Readiness assessment: Assess staff’s technical capabilities & ability of current practice management technology to meet needs. (Huffmaster & Holmes, 2008) 3 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

User Training Adequate training is crucial to success. Consider: –Scheduling within 2 weeks to help users retain skills –Scheduling both initial training and subsequent updates for complex tasks, e.g. physician documentation –Customizing training to meet specific needs of distinct user groups (Huffmaster & Holmes, 2008) (Adler, 2007) 4 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

User Training: Strategies & Styles Choose a combination. –Train the Trainer –Classroom-style –Web –One-on-one (Huffmaster & Holmes, 2008) (Fullerton et al, 2006) 5 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pilot Group Training and Implementation Treat it as a mini-rollout. Being a pilot site requires flexibility on timelines and functionality. Devise contingency plans for downtime. IT support resources must be committed and immediately available after go-live. (Fullerton et al, 2006) 6 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pilot Group Training and Implementation (cont’d) Standardized communication process, with single liaison Formalize orientation process for new members, outlining policies and procedures that underlie decisions made at organizational level. Consider rolling out more complex modules (e.g. charge capture) later on, after user confidence & familiarity have grown. Involve everyone in decision-making: physicians, nurses, admin, financial, etc. (Fullerton et al, 2006) 7 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pilot Group Training and Implementation (cont’d) Medication dosages and instructions in EHR should be reviewed by independent experts. Pilot testers should report potential mistakes. System stability is essential for building user confidence in system, even during pilot & beta phases. (Fullerton et al, 2006) (HIMSS, 2001) 8 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Learning from Your Pilot Test Review pilot user feedback & make necessary adjustments. Develop surveys addressing: –Workflow changes –Interface problems, adjustments needed –Data errors or failure Keep journal of experiences & processes. Conduct post-implementation review. 9 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pre-Loading Legacy Data: Typical Options None –All visits after go-live use EHR. –Paper charts frequently accessed. Limited –Pre-load commonly-referenced data, e.g. meds, conditions, immunizations, allergies. –Reduces need to pull paper charts for most visits. All data from last year –Vendor should assist due to high data volume. –Paper charts retained for reference. (EHR Adoption – Implementing, n.d.) 10 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Planning Implementation: “Big Bang” vs. Phased Difficult decision “Big Bang”: whole organization at same time –Pro: finish quickly; avoid separate processes for same task. –Con: size of project can cause chaos (especially in large organizations). Phased: users &/or functions introduced over time –Consider less-interactive functions first; e.g. scanning, result reviewing. (Adler, 2007) 11 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Implementation Best Practices Train, evaluate, & support users throughout process. –Essential for optimizing user efficiency, effectiveness, & system adoptability –Builds user confidence Test system thoroughly, before & after final roll-out. –Resolve issues, problems, bugs ASAP. Users determine success. –Support them from beginning, through training, and into post- implementation support. Ultimate goal is NOT to implement health IT –… but to maximize efficiency, quality, & effectiveness of care. Be proactive in organizational policy. –Facilitate user adoption through training and continued support. 12 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Closing the Gap: Post-Implementation Maintenance and update phase begins. Repeat baseline system performance test. Continue support and development. Solicit user feedback. –Resolve issues promptly, and consider suggestions for improvement. Hold meetings: –Project review (stakeholders, key players) –Customer acceptance (vendor) 13 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pilot Testing and Full-Scale Deployment Summary Pilot Testing –user testing –catch and correct errors before they are magnified through full deployment. Training Methods Implementation Methods –Big Bang –Phased Implementation tips –Understand the REAL goal –User adoption Post implementation –Baselines –Maintenance and Upgrades –Reviews 14 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment

Pilot Testing and Full-Scale Deployment References References Adler, K. (2007 February). How to Successfully Navigate Your EHR Implementation. Fam Pract Manag., 14(2), Retrieved from EHR Adoption - Implementing. (n.d.). Retrieved February 9, 2012, from Rhode Island Quality Institute website: Fullerton, C., Aponte, P., Hopkins III, R., Bragg, D., & Ballard, D. J. (2006). Lessons learned from pilot site implementation of an ambulatory electronic health record. Proc (Bayl Univ Med Cent), 19, Retrieved from _4_Fullerton.pdf _4_Fullerton.pdf Huffmaster, T., & Holmes, M. L. (2008, June 18). Selecting and Implementing a Communitywide EHR, Part 2. Retrieved from Hospitals & Health Networks (H&HN) website: ta/Spring2008/080618MW_Online_Huffmaster&domain=HHNMOSTWIRED ta/Spring2008/080618MW_Online_Huffmaster&domain=HHNMOSTWIRED The Design and Implementation of a Computerized Patient Record at the Ohio State University Health System – A Success Story. (2001 Davies Organizational Award Winners). (2001). Retrieved from HIMSS website: 15 Health IT Workforce Curriculum Version 3.0/Spring 2012 Installation and Maintenance of Health IT Systems Pilot Testing and Full-Scale Deployment