TRAFF-20 Development Author: Nick Rubbi Prepared: December 2011.

Slides:



Advertisements
Similar presentations
Software Version: DSS ver up01
Advertisements

SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Adders Used to perform addition, subtraction, multiplication, and division (sometimes) Half-adder adds rightmost (least significant) bit Full-adder.
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Business Practices Subcommittee Update August 17, 2010.
Business Practices Subcommittee Update February 1, 2011.
1 Understanding Web Project Management Build a better relationship with IT Christina Zeller InfoAction, Vancouver Public Library SLA NorthWest Regional.
World Class Standards TC SCP TEC Status Report to TC SCP Plenary #49 Paul JOLIVET, Chairman, LG Electronics Sebastian HANS, Vice chairman, Oracle SCP(11)0177.
ETSI TC SCP WG TEST Status Report to TC SCP Plenary #49
IPC Working Group 28- Update on IT support for the IPC Geneva November 1, 2012 Patrick Fiévet Head of IT Systems Section.
Arithmetic and Geometric Means
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
EMIS The fun never ends…. 2 Previously… EMIS data -- snapshot submitted once in January, December (special education, CTAE students only), February and.
Making the System Operational
With LMG Secretariat LMG Forum October 2010 Christopher Croft, LMGS Rob Gillies, LMA Tim Carroll, Chaucer.
1 NatQuery 3/05 An End-User Perspective On Using NatQuery To Extract Data From ADABAS Presented by Treehouse Software, Inc.
Internet Survey Method in the 2010 Census and Challenges to the 2015 Census in Japan Population Census Division, Statistics Bureau of Japan Hideki Koizumi.
MX250 Power on and off, Console Mode. January 2004 Page 2 Power Supply MX250 has ac and dc inputs –ac 100 to 240 V, 5A, 50 to 60 Hz –dc –48 V, 6A –worldwide.
Electric Bus Management System
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Housekeeping in Shoper 9 POS February 2010.
Slide 5-1 Copyright © 2004 Pearson Education, Inc. Operating Systems: A Modern Perspective, Chapter 5 5 Device Management.
THE DEVICE, THE FEATURES & Centralized Management System (CMS)
High School Data Review Grades 9-12 KDE:OAA:DSR:pp: 8/20/
1 FY10 ACS Methods Panel Update Jennifer Guarino Tancreto Chief, ACS Data Collection Methods Staff Decennial Statistical Studies Division Presentation.
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Barbara Zendejas, Melissa Omand and Manuela Lachica,
Telemetry Modules Quick Start
Doc.: IEEE OmniRAN-13/0069r0 Submission September 2013 Michael Montemurro, BlackBerrySlide 1 Liaison Report for OmniRAN EC SG Date: Authors:
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
Principles for Supplements, Series of amendments and Revisions to UN Regulations Note by the secretariat Taking into consideration: long transitional periods.
Strategic Planning Update Contents: Review Strategic Planning Framework (from Board 8/20) SP Situation Assessment Progress Report SP SA Exercise: Foundation.
School Census Summer 2011 Headlines Version Jim Haywood Product Manager for Statutory Returns.
Gursharan Singh Tatla PIN DIAGRAM OF 8086 Gursharan Singh Tatla Gursharan Singh Tatla
Weekly Attendance by Class w/e 6 th September 2013.
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
Installing Windows XP Professional Using Attended Installation Slide 1 of 30Session 8 Ver. 1.0 CompTIA A+ Certification: A Comprehensive Approach for all.
Web Time Entry Hours Entry in ESS 04/26/12 1 Banner.
Special Education Director Meeting February 18, :30pm.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction 2013 Assessment and Accountability Information Meeting Technology.
HORIZONT 1 ProcMan ® The Handover Process Manager Product Presentation HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89.
Software Project Transition Planning
1 The 9-Pin Connector Pin abbreviations (numbers in parentheses are the 25D pin numbers): 1. CD (8) 2. RD (Rx) (3) 3. TD (Tx) (2) 4. DTR (20) 5. SG (Ground)
Development plan and quality plan for your Project
© 2009 GroundWork Open Source, Inc. PROPRIETARY INFORMATION: Information contained herein is not for use or disclosure outside of GroundWork Open Source,
Creating an Education Destination through Strategic Planning Lodi Unified School District Board Study Session Presentation August 16, 2011.
7 th TTG meeting – Trieste – 3-4 March, 2015 SeaDataNet tools, new developments IFREMER : M. Fichaut, A. Briand, M. Larour, T. Loubrieu, V. Tosello ALTRAN.
EPICS devSNMP Extensions Euan Troup, CSIRO Australia Telescope National Facility ASKAP Project Paul Wild Observatory.
February 24, 2004 TR-45 Lawfully Authorized Electronic Surveillance (LAES) Activity Industry Meeting on LAES Terri L. Brooks Chair TR-45 LAES Ad Hoc 817.
Software Development Software Testing. Testing Definitions There are many tests going under various names. The following is a general list to get a feel.
Specview 32 Release 2.5 Enhancements
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
1 Project Update and Summary of Project Priority List (PPL) Activity June 11, 2015.
Overview of MSWS Control of 212-LC July 15, 2006.
Mission Science By Team Team 07 Members Jiashuo Li Chen Li Sergey Mukhin Hanadi Mardah Yun Shao Farica Mascarenhas 2.
GPRS functionality overview in Horner OCS. GPRS functionality – Peer to Peer communication over GPRS – CSCAPE connectivity over GPRS – Data exchange using.
Magnum Chiller Plant Manager
SunGuide SM Software Development Project End of the Year ITS Working Group Meeting December 7, 2005.
4/27/ T7C - DCM Software Interface ISUAL DPU-to-DCM Interface and Protocol 8644-T7C Rev Description Date A Initial release 20-Feb-2001 SG B MMCB.
TRAFF-20 Development Author: Nick Rubbi Prepared: March 2015.
Traffic Control & Coordination
Participant Browser Services (PBS) Update
Mission Science By Team 07.
Liaison Report Date: Authors: January 2012
Implementing an OpenFlow Switch on the NetFPGA platform
Review plan of the nature reporting – update 6
Progress with transition to new SDF
Operational Context and Use Case Focus Group
Presentation transcript:

TRAFF-20 Development Author: Nick Rubbi Prepared: December 2011

Agenda Current status of work; Current status of work; Traff-20, VC=6, Revision 1; Traff-20, VC=6, Revision 1; Changes made since February 2011; Changes made since February 2011; Future work; Future work;

Current Status Traff-20 VC6 Rev 1 Test Release – Build 102 (dated 24 th May 2011).Traff-20 VC6 Rev 1 Test Release – Build 102 (dated 24 th May 2011). Traff-20 test versions supplied to controller manufacturers;Traff-20 test versions supplied to controller manufacturers; –Test version 102 supplied on 24 th May 2011; –Targeting Traff VC6 build 1 release; Failed to meet original target ie first controller in the field to correspond with SCATS release in June 2011;Failed to meet original target ie first controller in the field to correspond with SCATS release in June 2011;

Current Status of QTC Controller QTC provided hardware and software for the test controller on 3 rd February;QTC provided hardware and software for the test controller on 3 rd February; Estimated software delivery at the end of October.Estimated software delivery at the end of October.

Current Status of Eclipse Controller Tyco provided hardware updates to the test controller on 9 th November;Tyco provided hardware updates to the test controller on 9 th November; Estimated software delivery end of January 2012;Estimated software delivery end of January 2012; Aside Tyco expressed a desire to minimise future changes to PSC software: – affects porting of some VC6 changes;Aside Tyco expressed a desire to minimise future changes to PSC software: – affects porting of some VC6 changes;

Current Status of ATSC/4 Controller ATC have only just started making changes for Traff-20 VC6.ATC have only just started making changes for Traff-20 VC6. ATC have been concentrating on Type Approval;ATC have been concentrating on Type Approval; Field trial of ATSC/4 version 8.1 scheduled for 11 th December;Field trial of ATSC/4 version 8.1 scheduled for 11 th December;

Changes Since Last SMUG Meeting (February 2011) Release is now targeting Traff Build 1 (not 28)Release is now targeting Traff Build 1 (not 28) Traff Software description CnnV6.xR20:Traff Software description CnnV6.xR20: –nn Controller Id (18 – QTC; 24 – Eclipse; 29 - ATSC/4); –x VC 6 revision x; –R20 Indicates Traff-20;

Changes Since Last SMUG Meeting (February 2011) Release notes: TRAFF20-TN-000 Release Notes 3.pdf

Changes Since Last SMUG Meeting (February 2011) 32 XSF Bits (Operational):32 XSF Bits (Operational): –X1TO8 - $00D8 –X9TO16 - $00D9 –New X17TO24 - $0180 –New X25TO32 - $0181 Warning non-contiguous addresses

Changes Since Last SMUG Meeting (February 2011) 32 XSF Bits (SCATS and Flexilink Plans):32 XSF Bits (SCATS and Flexilink Plans): –SCATX1 - $0332 –SCATX9 - $0333 –New SCATX17 - $018C –New SCATX25 - $018D –FLEXX1 - $0330 –FLEXX9 - $0331 –New FLEXX17 - $0188 –New FLEXX25 - $0189 Warning non-contiguous addresses

Changes Since Last SMUG Meeting (February 2011) 32 MSS Bits:32 MSS Bits: –S1TO8 - $00DA –S9TO16 - $00DB –New S17TO24 - $0180 –New S25TO32 - $0181 Warning non-contiguous addresses

Changes Since Last SMUG Meeting (February 2011) New Fault 67 (SG output map fault): Caused by allocating a SG output more than once.New Fault 67 (SG output map fault): Caused by allocating a SG output more than once.

Changes Since Last SMUG Meeting (February 2011) Daily Output separated from Special Facility Outputs (aka SPOPS); - New DAILY - $0F2C

Changes Since Last SMUG Meeting (February 2011) 24 SPIPS:24 SPIPS: –EXTINP - $0379 –New EXTINP2 - $0F24 –New EXTINP3 - $0F25 24 SPOPS:24 SPOPS: –EXTOUT - $037A –New EXTOUT2 - $0F28 –New EXTOUT3 - $0F29 Warning non-contiguous addresses

Changes Since Last SMUG Meeting (February 2011) RAM address $3603 indicates runtime library version (release is targeting 1);RAM address $3603 indicates runtime library version (release is targeting 1); RAM address $3604 indicates hht version (release is targeting 1);RAM address $3604 indicates hht version (release is targeting 1); RAM addresses added to allow remote checking of the controller software build switches used;RAM addresses added to allow remote checking of the controller software build switches used;

Changes Since Last SMUG Meeting (February 2011) RAM addresses added to allow remote monitoring of SCATS communications errors eg rx buffer full;RAM addresses added to allow remote monitoring of SCATS communications errors eg rx buffer full; Corresponding HHT menu updates;Corresponding HHT menu updates; Bug fixes in HHT and previous Test version of Traff; Bug fixes in HHT and previous Test version of Traff; Refer HHT Manual RTA-TC-301 Draft Issue J May 2011 Refer HHT Manual RTA-TC-301 Draft Issue J May 2011

Changes Since Last SMUG Meeting (February 2011) Wintraff: Mostly complete for VC6;Mostly complete for VC6; Waiting for final testing before available to release;Waiting for final testing before available to release;

Changes Since Last SMUG Meeting (February 2011) NGEN: Handover to RMS effective 17 th November 2011;Handover to RMS effective 17 th November 2011; Minor changes required before ready for new Traff VC6 personality;Minor changes required before ready for new Traff VC6 personality; Will manage both VC6 and VC5 personalities;Will manage both VC6 and VC5 personalities;

Future Changes More Phases; How many?More Phases; How many? New communications protocol;  NTCIP?New communications protocol;  NTCIP? Plan based operation; take pressure of commsPlan based operation; take pressure of comms Change to time settings and time settings management; needs to be extensible; - Work related to new comms protocolChange to time settings and time settings management; needs to be extensible; - Work related to new comms protocol

Future Changes Plug and play type operation;Plug and play type operation; Serial communications allowing the Personality to setup and test messages eg RS-485;  SystemSerial communications allowing the Personality to setup and test messages eg RS-485;  System One mode of operation;One mode of operation; Additional Personality Operators;Additional Personality Operators;

Future Changes Maybe Fill gaps in I/O;Maybe Fill gaps in I/O; TSC/4 Controllers Support: –96 – 128?? Inputs max. – Loop Inputs max. – Switch Inputs max. TSC/4 Specifies: –64 Inputs max. »64 Logical Vehicle Detectors max. »8 Logical PB Inputs max. –32 Loop Inputs max. –64 Switch Inputs max. (with 8 PB Inputs max.)

Feedback No Feedback received from SMUG members from last meeting;No Feedback received from SMUG members from last meeting; Feedback is encouraged to help in determining work priorities;Feedback is encouraged to help in determining work priorities;