Testbed Usage and Support Eric Fede

Slides:



Advertisements
Similar presentations
Amsterdam 7-8-9/03/01 WP6 Information Service Which information in the Globus IS ? Users Administrators Applications Ressources … Access to informations.
Advertisements

Nadia LAJILI IN2P3 Computing Center Testbed Status IN2P3 Computing Center Testbed Status Lyon, February 2003.
1 Network Monitoring with Nagios Asian Internet Interconnection Initiatives Project Yan Adikusuma Nara Institute of Science and Technology
February Extended Project Group Meeting Working Sessions Practical planning Session I: Thursday, 16: :30 Session II: Friday, 9: :30.
ERIC and the 21 st Century: Education Research in the Digital Age Erwin Flaxman James Lonergan.
EU DataGrid progress Fabrizio Gagliardi EDG Project Leader
Andrew McNab - Manchester HEP - 15 February 2002 Testbed Release in the UK EDG Testbed 1 GridPP sources of information GridPP VO GIIS and Resource Broker.
Andrew McNab - Manchester HEP - 10 May 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –What are other sites doing? –What are.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Vanderbilt Consulting / Amy K. C.S. Vanderbilt, Ph.D. Owner – Principal Consultant Vanderbilt Consulting
APPLICATION TESTBED SITE STATUS Eric Fede
Vertical Communications, Inc1 Wave 3.0 Overview. Wave 3.0 Key Features Vertical Communications, Inc2.
Ashish Gupta Project with Bin Lin. Overview Our Goal –Introduce resource borrowing and its motivation –Current model and further possibilites –What we.
Peter van Rosmalen Barcelona, June 22th, 2007 Question-Answering -c onnecting and supporting the learner-
Andrew McNab - Manchester HEP - 22 April 2002 UK Rollout and Support Plan Aim of this talk is to the answer question “As a site admin, what are the steps.
IPv6 Interim Policy Draft RIPE 42 Amsterdam, The Netherlands 1 May 2002.
Tyler Young Using Google Analytics to Better Your Business.
Support for system administrators Feedback from site admins after Testbed1 experience 05/03/2002 4th EDG WS Paris G. Merino, IFAE.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Topic 1Topic 2Topic 3Topic 4Topic
Bob Jones – June n° 1 EDG release Schedule Bob Jones.
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
 Starter activity. How did life get better for many ordinary people?
If … Then … Closing Argument Key Points in Support of Our Position Debate Smart-sheet #1 Order Our position:
Jesper Rønn-Jensen reboot8 Prototype driven development with Rails Demo of employee/competence web-app for Danish Agency for Commerce and Companies.
1 A Process for Developing the Structure of Need-Based Web Sites: Technical Report 29 Julia Panke, Darrin L. Carr, Scott Arkin, & James P. Sampson, Jr.
8-Jul-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security (Report from the LCG Security Group) RAL, 8 July 2003 David Kelsey CCLRC/RAL, UK
KISTI Grid CA Status Report Korea Institute of Science and Technology Information Sangwan Kim Jae-Hyuck Kwan
Dr. Joy Pixley Project Manager, Social Sciences California Plug Load Research Center California Institute for Telecommunications and Information Technology.
Enabling Grids for E- sciencE EGEE and gLite are registered trademarks EGEE-III INFSO-RI Analysis of Overhead and waiting times.
Quantum Computers.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Site Management & Support for 1.2 Technical Problems Other Problems What is a Sysadmin? What is wrong with the way we work? Me as a Site Manger Me as an.
1 Grid monitoring System (GridICE) Grid monitoring System (GridICE) DataTAG Collaboration: S.Andreozzi, S.Fantinel, A.Ghiselli, G.Tortone, C.Vistoli A.Ghiselli,
EE 316 Computer Engineering Junior Lab Project 2 Digital Yahtzee.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
RenéFabian. It all runs down to this… The objective of the campaign is to develop a younger audience and supporter base for our communication channels,
User Support Sophie Nicoud PTB, April 10th 2002.
Stephen Burke – Sysman meeting - 22/4/2002 Partner Logo The Testbed – A User View Stephen Burke, PPARC/RAL.
Testbed Release Criteria and Plans WP8 Loose Cannons & App Representatives.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal Development Update on Requirements Cyril L'Orphelin IN2P3/CNRS.
Quiz About Your Topic Question 1 A question about your topic: A. [Insert incorrect answer] C. [Insert incorrect answer] B. [Insert incorrect answer]
Published :June 2016 Global UF Film Industry 2016 Market Research Report.
Published :June 2016 Glufosinate Ammonium Consumption 2016 Market Research Report.
Celstran LFRT Consumption Market Analysis and Forecast 2016
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
Lithium Consumption Market : International Industry Analysis
Mints Market Report - Worldwide Industry Analysis
Europe Oat Industry Analysis and Revenue Forecast 2016
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
Worldwide Tungsten Steel Industry- Size, Share and Market Forecasts 2021
International Rubber Latex Thread Market
Worldwide Silicon and Ferrosilicon Industry- Size, Share and Market Forecasts 2021
United States Silver and Gold- Based Brazing Materials Industry 2016 Market Research Report
China Perfluorooctanoic Acid (PFOA) Industry 2016 Market Research Report
Energy Savings Coatings Consumption Market : International Industry Analysis
Global Hemp Fiber Industry Share and 2021 Forecasts Analysis
Global Morpholine Consumption Market 2016: Industry Trends and Analysis
Type Topic in here! Created by Educational Technology Network
معلم الصف الثالث الابتدائي
סדר דין פלילי – חקיקה ומהות ההליך הפלילי
RESPONSE.

ФОНД “СОЦИАЛНО ПОДПОМАГАНЕ”
Organization- Unit 1 CDA
You must show all steps of your working out.
Question 1.
Review Time! (Yaaaaaaay!). Review Time! (Yaaaaaaay!)
Presentation transcript:

Testbed Usage and Support Eric Fede

2Eric Fede PTB 13 June 2003 PLAN -Testbed Application Status - Services Status - VO Status - Support Status

3Eric Fede PTB 13 June 2003 EDG TESTBED APPLICATION STATUS AND PLAN

4Eric Fede PTB 13 June 2003 TESTBED APPLICATION SERVICES

5Eric Fede PTB 13 June 2003 VO STATUS

6Eric Fede PTB 13 June 2003 Testbed Status overview - Site - Enough site involved on EDG until the end of the project - Enough hardware resources - Enough people - Services - All the services are (and will be) supported - VO - All the EDG VO are supported by more than one site.

7Eric Fede PTB 13 June 2003 User Support Status -Now -By mail on Iteam list (large success) -No real history of the answer -A little bit chaotic but efficient and direct with the expert - By the users support interface ( poor usage) -To slow but structured (topics, key word,…) -Good for the users which discover EDG - Plan until the end of the year - The both system will be supported.

8Eric Fede PTB 13 June 2003 Conclusion The availability of resource will be enough until the end of the project to have a realistic and functional testbed of production. The actual support structure should be enough until the end of this year