Planned FCC Power Outage July 11, 2011. ARRA Feynman ARRA construction project requires completion by September 30 th. This constraint.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Business Practices Subcommittee Update August 17, 2010.
Bob Grubbs Lead Bridge Engineer ODOT Region 3, Tech Center Lessons Learned FAST 14, Boston MA FHWA Highways for Life Showcase.
SAVE FOR TOMORROW ENERGY PLAN (STEP) REBATE PROGRAMS Kathe Doran Manager of Energy Management.
Alabama Water Resources Conference 2013
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
TAB Data Center Renovation Project Planning for Transition of Summer 2013 February 21, 2013 TAB Atrium.
Green Building Ordinance Transportation and Environment Committee
Emerado Public School: Energy Audit & Energy Conservation Alternatives Undergraduate Thesis Mechanical Engineering Kristin McKenzie March 15th, 2007.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Race to the Top Years 2 to 4 Finish line webinars July
A Youth Capability Building Project- Muslim Youth Scholar Training Internship (MyStI) A Presentation by MY -FIKR (Muslim Youth Foundation of Intellectual.
FY12 and FY13 Budget Development Special Board Meeting Alachua County Office of Management and Budget June 7, 2011.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
2015/16 changes to the winter time-of-use peak periods and tariff charge name changes.
ICW Water Leak at FCC Forces a Partial Computing Outage at Feynman Computing Center J. MacNerland, M. Thomas, G. Bellendir, A. Walters May 31, 2007.
Do Hurricanes cool Ocean
SCAQMD Boiler Rules Rule – Emissions of Oxides of Nitrogen from Large Water Heaters and Small Boilers March 22, 2006.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Southwark’s New District Heating Network.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
GCC Cooling Problems and Recommendations Computing Sector.
Workshop « Commissioning and auditing of buildings and HVAC systems » Brussels, January 28th, 2008 Identification of heat recovery on chiller condenser.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Aristotelis Botzios-Valaskakis MSc Mechanical Engineer Division of Development Programmes Building Energy Performance Reliable Predictions ESCO’s point.
UGI Utilities – Electric Division Energy Efficiency & Conservation Collaborative Meeting June 9, 2010.
Information Technology Report Dave Pagliai Manager, IT Support Services February 2015 ERCOT Public.
RMS Update to TAC May 8, RMS Update to TAC ► At April 9 RMS Meeting:  Antitrust Training  RMS Voting Items: ► NPRR097Changes to Section 8 to Incorporate.
Sunset Date Extension Requests Jennifer Anziano Regional Technical Forum August 18, 2015.
Latest on the Proposed WYDEQ BACT Policy Dana Wood, BP Senior Environmental Technical Advisor.
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
PROP K UPDATE Citizens’ Oversight Committee Meeting October 17, 2013.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Energy conservation strategies Buildings energy consumption depends on building envelop, efficiency of HVAC and lighting systems, amount of required fresh.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
ERCOT Staff Demand Integration Update to DSWG 3/08/2013 DSWG Meeting.
SHDH Perimeter Radiation Improvements Town Hall Meeting – June 23, 2015.
Dialing it in: A Year of Tuning the NCAR-Wyoming Supercomputing Center Aaron Andersen, Deputy Director of Operations, National Center for Atmospheric Research(NCAR)
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
PM2.5 Working Group Meeting #2 South Coast Air Quality Management District July 11, 2006.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Implementation of National Ambient Air Quality Standards Bill Harnett NACAA Fall Meeting September 22, 2009.
MARS Taskforce RMS Update April 12, Initial Settlement As of April 5, 2011 Operating Date: March 29, 2011 AMC ESI ID Totals: 2,601,788 AMDG ESI.
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
Presentation about Terminal Expansion at Bahrain International.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
Meeting Nantucket’s demand for electricity, today and tomorrow. Upgrading Nantucket’s Electric Grid.
Data Center Stabilization
Machine operation and daily maintenance management in SOLEIL
CBETA Technical Review
1.3-GHz Cavity Vacuum Furnace at IB4
International House 3 (Air-conditioned Triple Studio)
Date of download: 12/16/2017 Copyright © ASME. All rights reserved.
Loop Water Controller Overview
Department of Environmental Quality
UNC Modification 0531 Provision of Industry Testing System
HYBRID AIR COOLING TECHNOLOGY
Calibrated Energy Models: One New Change
Presentation transcript:

Planned FCC Power Outage July 11, 2011

ARRA Feynman ARRA construction project requires completion by September 30 th. This constraint requires a outage window on Saturday August 13 th to enable subsequent deliverables and activities. Date negotiated with experiment D0, CDF and CMS spokespersons to minimize impact.

ARRA Feynman Cooling Upgrade project requires an outage – Electrical work associated with cooling system for the FCC2 computer room – EPO upgrade to new system on FCC2 (including commissioning and testing) – Opportunistic Work Installation of power monitoring for the original FCC 480V service (DOE requirement) Small electrical upgrades & work

Impact to Services Core Services will be unavailable with the exception of network for the duration. Shared Scientific Computing Services will be either unavailable or impacted for the duration. We are working in the interim to mitigate the impact on the network and scientific services.

Outage Schedule Saturday, August 13 Scheduled for 8 hours Tentative start of work is 6:00AM All power and cooling in Feynman is impacted except for the FCC3 HACC computer room

Questions

Appendix GCC Cooling Outage

June 7 loss of cooling in Computer Room B – Ambient air to condensers to hot > 120F – Heat build up on condenser pad Record Setting Dupage Airport

Short Term Actions Understand indicators or predicators Computing load shed plan Cooling in the room reviewed – Increased cooling setpoint from 73F to 77F Review of existing monitoring data Water cooling under condensers at the pad Reduction of vegetation around the pad Augmentation of monitoring at the pad

FESS Engineering Study Engineering Review of the cooling system Determine Root Cause Recommendations & proposals Deliverables from study in late summer Implement any modifications – Prior to Summer, 2012