QA Requirements 2014-2015 Presenter Name | Anne Tuccillo.

Slides:



Advertisements
Similar presentations
Performance-based Financing in Liberia: Experiences of USAID/RBHS Richard J. Brennan Rebuilding Basic Health Services.
Advertisements

WP Operative Plan WP 4 : Functional requirements Task Responsible: Regione Piemonte.
BY RAYMOND GREENLAW ARMSTRONG ATLANTIC STATE UNIVERSITY ABET-Accreditation Timeline.
Vietnam Science & Technology Statistics Nguyen Minh Ngoc National Agency for Science and Technology Information Ministry of Science and Technology, Vietnam.
Road Map To Development September 2013 December 2013 February 2014 April 2014 July 2014 Data Submission WEQ 008 Assessment CO 283 Report GTL COs Draft.
Quality Education Investment Act of 2006 (QEIA) 1 Quality Education Investment Act (QEIA) of 2006 County Superintendents Oversight and Technical Assistance.
Annual meeting with the MA of the ETC programmes April 2013 Financial management Juan Lopez Lledo, Budget and Financial mangement, Unit REGIO.A.3.
Copyright © 2012 California Department of Education, Child Development Division with WestEd Center for Child & Family Studies, Desired Results T&TA Project.
Clinical Management for Behavioral Health Services (CMBHS) Mental Health Implementation Project Update Presented October 9th and 16th, 2012.
Recommended Guide for Next Generation of Transportation Design-Build Procurement and Contracting in the State of Georgia Russell McMurry, P.E. Chief Engineer.
Ohio Resident Educator Program: Focusing on Years 3 and 4.
California Student Aid Commission
KaufCAN.com ACA Update Focused on the Employer Mandate Final Regulations Shenandoah University Business Symposium March 25, 2014 John M. Peterson Kaufman.
PIAAC: Delivering the Survey in Ireland
What is NAP? NAP is a program of the State of Indiana in which tax credits are distributed to eligible non profits for sale as a fundraising and capacity.
A-16 Portfolio Management Implementation Plan Update
Texas A&M University-Kingsville Office of Planning and Assessment.
Managing Government Records Directive ACERA Meeting November 6, 2012 Don Rosen Director of Policy, Analysis and Enforcement Office of the Chief Records.
HVB Academy 1. CONTINUOUS COMPREHENSIVE EVALUATION (CCE)
2010 SACS-COC Annual Meeting December 6, 2010 CS-69 Administrative Program Review Assuring Quality in Administrative and Academic Support Units.
ACE/ARS Joint Staff Meeting ARS Program Report Field Service Accomplishments December 3, 2013.
Standards for Training Packages. Outline Outline of the development of the Standards Framework Transition timelines Overview of the Standards Framework.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
CSES CA GEN 8.0 UPGRADE Request for Project Certification Initiation & Planning CSES CA GEN 8.0 UPGRADE Request for Project Certification Initiation &
Timeline/Issues January to July 2012 FEPA Mid Year Work Session 2012.
Addition 1’s to 20.
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
Lim Sei cK.  16 th September 2013 – 7 th December 2013  ACADEMIC WEEK 1 – WEEK 11  9 th December 2013 – 4 th January 2014  BRUNEI STUDENT HOLIDAY.
Community Services and Health Industry Skills Council Revised Project Timelines January 2014.
CCRS Implementation Team Meeting #4 The Journey Continues! April/May, 2013.
Weekly Attendance by Class w/e 6 th September 2013.
Financial Aid Renewal
Instructional Hours Required Instructional Time / OAR
WIOA Timeline and Action Plan for States
1 Office of the Utah State Auditor OFFICE OF THE UTAH STATE AUDITOR A Key Pillar of State Government.
David Rhodes and Holly Langer-Evans QA Analysis Training.
Michael Cagle and Holly Langer-Evans QA Analysis Training.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Project Prioritization Process ASPCC Update December 14, 2005.
Michael Cagle, Holly Langer-Evans, and Anne Tuccillo | Dec U.S. Department of Education 2013 FSA Training Conference for Financial Aid Professionals.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
VERIFICATION OF TVET COLLEGE ENROLMENTS Background One of the key responsibilities of the Chief Directorate Planning and Institutional Support is.
Vendors for MainePERS Employers Welcome! 1 Vendor Informational Meeting August 2009.
Session 64 Set Your Knowledge in Motion: Maximize Reports & Graphs in the ISIR Analysis Tool Holly Langer-Evans Anne Tuccillo.
Session #65 Draft Results of Quality Assurance Program Data from Award Year David Rhodes and Anne Tuccillo.
Creating Flat ASCII Files and Uploading Records Training Developed by the QA Program Team.
Upload ISIR Records through Data Request Presenter Name | Michael Cagle.
1 Proposed New Direction in Dashboard Reports. 2 Proposed Analytic Change From: School verification in general To: Specific criteria in particular.
Michael Cagle and Holly Langer-Evans | Nov U.S. Department of Education 2012 Fall Conference FSA Assessments: Find It, Fix It, and Enhance Compliance.
Getting Started in the Quality Assurance Program Holly Langer-Evans Michael Cagle Anne Tuccillo
Data Management Seminar, 9-12th July 2007, Hamburg 11 ICCS 2009 – Field Trial Survey Operations Overview.
Controlling the Quality of Verification: Verifying a Sample of ISIR Records Anne Tuccillo and Michael Cagle U.S. Dept. of Education David Rhodes and Stacey.
Sampling and You Preliminary results from a pilot study on the return of sampling Tsze Chan, The American Institutes for Research David Rhodes, Caliber.
 Jeff Baker, U.S. Department of Education  Barbara Mroz, U.S. Department of Education  David Rhodes, U.S. Department of Education  Anne Tuccillo, U.S.
Tools to Assist You in Processing Aid and Sustaining Compliance Ginger Klock Michael Cagle 2006 NASFAA Conference Seattle, WA.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Session 44: Verification Analysis: Understanding the Reports Generated by the ISIR Analysis Tool David Rhodes, AIR Holly Langer-Evans, FSA.
Session 66 The Power of the IA Tool One Report at a Time (For QA Program Schools) Michael Cagle QA Team.
Session 29 Michael Cagle and Anne Tuccillo Federal Student Aid Extreme Verification Makeover, School Edition, Season 2: Use the ISIR Analysis Tool To Build.
Review and Discuss QA Program Requirements. 2. Re-visit the importance of Team Building as an integral role in the QA Program Activities. 3. Provide.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Session #21 ISIR Analysis Tool Data Holly Langer-Evans, U.S. Department of Education Stephanie Sutton, Lorain County Community College Jana Haile, Boston.
Compliance Committee (3C)
Jeff Baker, U.S. Department of Education
Session 21: How to use the FSA Assessments
2015 January February March April May June July August September
Presentation transcript:

QA Requirements Presenter Name | Anne Tuccillo

Training Objectives 1 QA Verification Findings 2 Institutional Verification 3 Review QA Requirements 2 2

IA Tool Changes IA Tool Deployment Schedule July 1, 2014 Data Request functionality August 10, 2014 Analysis of Data and Report functionality WebFOCUS Upgrade Report Assistant and Graph Assistant no longer available WebFOCUS 508 Compliant 3

QA Verification Findings QA schools identified six efficient criteria 98 percent of records selected had an EFC change 2010 Random sample data Selected by CPS 49 percent experienced a change to EFC Selected by School 56 percent experienced a change to EFC 4

Analysis Institutional Verification Selected by CPS Not Selected by CPS 5

Verification Criteria Know what your Verification criteria are and assign alphabetic codes (A-Z) to each verification criteria Work with IT support to automate the process of identifying the codes each record met OR Manually assign the code to each record 6

Uploading Records 7

Prepare Flat File of Verified Records 1.SSN 2.First two letters of the last name (CAPS) 3.Initial transaction 4.Paid on transaction 5.Include the “Y” since each record met your criteria 6.Include the Verification Code(s) the record met MA0105YAC LA0204YA EV0106YCDE Field Length: Up to 56 characters 8

Verify records that meet institutional criteria January – July Submit surveyJune Prepare flat file of verified recordsJune - December Upload flat fileJuly - December Analyze dataOctober - December Revise and prepare for implementation of verification criteria November - December Timeline for IA Tool Requirements 9

Timeline for FSA Assessments January - June, Continue completion of assessments or activities. Keep copies of all Action Plans in QA file. March – June, Establish Teams to begin completion of the assessments or activities for the award year June, Report on the QA Annual Survey which assessments or activities you will complete for July, 2014– June, Complete Assessments for , and any Action Plans 10

What Have We Learned Today? 1 Result of QA Verification Findings 2 The focus is on Institutional Verification 3 QA Requirements 11 20

QA Regional Representatives Regions 1, 2, and 5 – Holly Langer-Evans – (617) Regions 3, 4, 6 & 7 – Anne Tuccillo – (202) Regions 8, 9, and 10 – Michael Cagle – (206)