Session 12 Supporting Emergency Recovery Operations (Debris Management) Using GIS Ute J. Dymon, Professor Nancy L. Winter, PhD Kent State University.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Lesson 3 Responding to Emergency Events. For additional information or questions please contact Toledo-Lucas County Health Department APC:
Hurricane Sandy. Sandy was the second-largest Atlantic storm on record Storm surge reached over 13 feet in coastal areas of New York and New Jersey The.
Emergency Management Emergency Planning Emergency Preparedness Disaster Management Disaster Recovery Coordination Primary Functions.
Session 121 Comparative Emergency Management Session 12 Slide Deck.
Detail actions necessary to implement the interim housing mission in the post-disaster environment Identify command and control structures at all levels.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
Planning for the Future Disaster Recovery Plan / Business Continuity Plan Jim Zukowski, Ed.D. Texas State Board of Dental Examiners 2006 Annual ConferenceAlexandria,
DENR Disaster Response Center Purpose Purpose Activation Activation Operation and Responsibilities Operation and Responsibilities Phases of Response Phases.
A Brief Overview of Emergency Management Office of Emergency Management April 2006 Prepared By: The Spartanburg County Office of Emergency Management.
US&R Planning. US&R Planning Issues Establish authority and responsibility Assess vulnerability and hazards Identify resources Coordination of response.
ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
1 DEBRIS MANAGEMENT OVERVIEW PRESENTER: GREG KELLER, Disaster Recovery Branch Grants Administrator/Public Assistance Officer (614)
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Hurricane Katrina Lessons Learned Laurence I. Broun Departmental Emergency Coordinator Office of Law Enforcement, Security and Emergency Management May.
Joe Turner, PE Disaster Recovery Engineer. DIVISIONS AND DISTRICTS.
The Day After The Shakeout Place your Counties Logo Here MT DES Exercises.
Hurricane Katrina: Addressing Impacts on Water Systems and Ambient Waters -- State/EPA Response J. Scott Gordon Water Division Deputy Director U. S. EPA,
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Part One: Introduction and Federal GIS Response.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
Session 131 Hazard Mapping and Modeling Supporting Emergency Response Operations using GIS and Modeling.
State Debris Management Plan California the “Disney Land of Disasters”
Alaska Pandemic Influenza Response Plan
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
Emergency Response: Preparing for Disasters & Emergency Incidents June 2, 2015 Guest Secured Password: rangers!
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Texas Department of Public Safety Division of Emergency Management Debris Management Overview.
Session 16: Distribution of Geospatial Data 1 Distribution of Geospatial Data in the Public Environment Hazard Mapping and Modeling.
AmeriCorps in Times of Disaster AmeriCorps Conference July 23,
Part of a Broader Strategy
Community Preparedness & Disaster Planning. Why Disasters occur ?
CITIZEN CORPS & CERT ORGANIZATIONS. What is Citizen Corps? Following the tragic events that occurred on September 11, 2001, state and local government.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Disaster Debris Preparedness Planning Angeline McInerny Wake County Environmental Services Department.
Alan L. Phillips Emergency Response Coordinator Ohio Department of Transportation Ohio EMA Spring Directors Seminar.
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
ADM 677 Crisis Management in Educational Settings Karen McCuiston Kentucky Center For School Safety.
ESF #3 – Public Works and Engineering IS-803 – February 2009 Visual 1 Public Works and Engineering ESF #3.
1 The DNA of Emergency Management. 2 Approaches to Disaster Planning Two types of planning u Emergency 0perations Plan u Emergency Support Function.
COVER YOUR BASES By: Pete Spatara By: Pete Spatara Director of Public Works Director of Public Works City of West Palm Beach City of West Palm Beach.
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
Richard Butgereit GIS Administrator
Individual Assistance (IA) Forms Provided to assist you with reporting damages. Same general type of form that FEMA will use if a federal assessment is.
“Smells Like Trouble!” The LEA Disaster Response.
State of Florida Emergency Support Function 6 1 EMERGENCY SUPPORT FUNCTION 6 - MASS CARE & EMERGENCY ASSISTANCE “Training for incoming EMAC personnel”
State of Ohio Disaster Housing Strategy
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
McClain County Multi- Jurisdictional Multi-Hazard Mitigation Plan Update Image from
USACE Flood Risk Management and Silver Jackets Workshop Sandra K. Knight, PhD, PE, D.WRE Deputy Associate Administrator for Mitigation, FEMA August.
A Brief Overview of Emergency Management Office of Emergency Management September 2004 Prepared By: Marybeth Solesbee, CEM.
Office of Public Health Preparedness and Response Division of Emergency Operations Centers for Disease Control and Prevention.
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
2015 USACE Exercise – December 1, 2015 New Madrid Seismic Zone – Earthquake FEMA Mission, Legal Authorities and Regional Capability Overview Gus Wulfkuhle.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
1 Roles and Responsibilities During a Water Sector Incident: USEPA and USACE Dawn Ison, EPA Region 6 Arkansas Exercise for the Water Sector 2010 November.
Harris County Case Study.  Aligning plans with emergency support functions (ESFs) can facilitate an efficient and effective response to emergencies.
Nassau County Disaster Debris Management Plan Debris Planning Team Meeting 1, April 24.
Urban Forest Strike Team Team Leader Response Protocols Review Eric Kuehler, USDA Forest Service Brooksville, FL July 20-21, 2009.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
EMERGENCY CONTRACTING AND HURRICANE KATRINA Thomas H. Gourlay, Jr. Chief Trial Attorney U.S. Army Corps of Engineers.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Unit 1: Introduction to Recovery Concepts
Returning-Rebuilding-Preparing-Creating
Role of FEMA EHP During Response Activities
Unit 6- IS 230 Fundamentals of Emergency Management
Disaster Recovery Operations
Jess Neuner Esri Corporate Template-Dark v3.3
Tahsis Emergency Programming
Presentation transcript:

Session 12 Supporting Emergency Recovery Operations (Debris Management) Using GIS Ute J. Dymon, Professor Nancy L. Winter, PhD Kent State University

Session 121 WHAT IS A GIS’S CHIEF DATA CHARACTERISTIC? It layers data that represent different topics of information about the environment into a database that can be manipulated for analysis.

Session 122 HOW DOES THE MAP ANALYSIS CENTER (MAC) OF FEMA DEFINE A GIS? GIS is a database system with software that can analyze and display data using digitized maps and tables for planning and decision making. A GIS can assemble, store, manipulate, and display geographically referenced data, tying the data to points, lines and areas on a map or in a table.

Session 123 WHAT ADVANTAGES DOES A GIS OFFER IN EMERGENCY MANAGEMENT EFFORTS? The current trend in GIS is focused on web-based mapping. This capability can allow users to view an already created map or to create maps, based on their own specifications, on their personal computers. Web-based mapping is expected to widely expand the use of GIS in the workplace, in schools, and in homes.

Session 124 WHAT ADVANTAGES DOES A GIS OFFER IN EMERGENCY MANAGEMENT EFFORTS? The services now performed by a GIS are deemed to be so essential that a GIS is considered to be “the workhorse of disaster management”.

Session 125 THE BEST SYNONYM FOR DEBRIS IS THE TERM “WRECKAGE.” Some jurisdictions include planning for emergency debris removal as part of their “waste” programs. See California’s Integrated Waste Management Disaster Plan – an.htm

6 WASTE MANAGEMENT APPROACH FOR THE HANDLING OF DEBRIS Six options include: Reduction Reuse Reclamation Resources recovery Incineration Landfilling

Session 127 NATURAL AND HUMAN-CAUSED DISASTERS PRECIPITATE A VARIETY OF DEBRIS The quantity and type of debris generated from any particular disaster is a function of the location and kind of event experienced, as well as its magnitude, duration, and intensity.

Session 128 CONSIDERATIONS IN DEBRIS MANAGEMENT Type of collection and disposal methods used, associated costs incurred, and the speed with which the problem can be addressed.

Session 129 US ARMY CORPS OF ENGINEERS (USACE) Developed a “Sample Debris Management Plan – 04” which is a generic “fill-in-the- blanks” plan for any community to implement.

10 STORM DEBRIS ARE USUALLY HANDLED AT THE CURBSIDE STREET LEVEL They are separated into the following categories: Household garbage – perishable items, such as food and normal household waste should have priority removal service but it may be interrupted due to road closings. Yard debris – contained in a bag, box, can or tied and moved to the road right-of-way. Construction debris bulk items – damaged large furniture and materials related to building construction. Household hazardous materials – with specific disposal requirements.

Session 1211 EPA PUBLISHED A GUIDE FOR LOCAL GOVERNMENTS ABOUT DEBRIS REMOVAL City, county and state governments are not authorized to remove debris from private property except where extraordinary threats to human health and safety may exist. This policy protects the liability of both the workers clearing debris and the property owner.

Session 1212 TEMPORARY STORAGE SITE ADVANTAGE A local jurisdiction with the ability to stockpile or store disaster debris until a later time will be able to avoid sending the debris to a landfill with no possibility for recycling the materials.

Session 1213 TEMPORARY STORAGE SITE ECONOMICS FEMA will only pay for the movement of debris once. Costs may increase significantly if a temporary site is used as an intermediate step between clearing the streets and processing/recycling the materials

14 STEPS TO MAKE A TEMPORARY STORAGE SITE Determine the need for temporary sites. Develop criteria to evaluate potential sites. Identify temporary storage sites. Review Emergency Waiver of Standard Regulations. Identify permits or variances required to site a temporary storage site. Perform environmental review of proposed site. Develop a Site Development and Operation Plan. Prepare Inspection and Site Management Guidelines. Prepare a Site Restoration Plan in order to close it.

Session 1215 SCALE OF DISASTER DETERMINES DEBRIS RESPONSIBILITY The wreckage or remains after some emergencies is able to be handled by local or state governments. Large scale disasters may require a GIS to be established exclusively for resolving the problems associated with debris management.

Session 1216 TWO BASIC PROBLEMS OF DEBRIS MANAGEMENT How much and what types of debris are to be removed? Where can the debris be disposed of?

Session 1217 AMOUNT OF DEBRIS NEEDS TO BE MODELED Estimation of the amount of debris to be removed usually requires modeling with the disaster data being supplied to a GIS estimation model.

Session 1218 MAC AND THE ENTERPRISE GIS The FEMA Mapping and Analysis Center (MAC) is in the process of developing and implementing an integrated state-of-the-art enterprise GIS (E-GIS) for the whole Agency.

Session 1219 POST DISASTER MODELING OF DEBRIS Using GIS, personnel from the Disaster Field Office (DFO) and the Emergency Support Team (EST) can see the spatial extent of the damage.

Session 1220 USACE FORECAST MODEL FOR DEBRIS AMOUNTS Other factors utilized in the model’s calculations are: Cubic yards of debris generated per household category per storm Vegetative cover Commercial density Precipitation

Session 1221 FORMULA FOR ESTIMATING DEBRIS QUANTITY The actual formula for estimating debris quantity is: Q=H (C) (V) (B) (S) H (Households)=Population/3 (3 persons per household) C (Category of storm) ( Hurricanes are rated 1 through 5) V (Vegetation Multiplier ) (light, medium, heavy) B(Commercial Density Multiplier) (light, medium, heavy) S (Precipitation Multiplier) (none to light, medium to heavy)

Session 1222 FINDING LAND FOR PERMANENT DEBRIS STORAGE The option of opening a closed landfill must be considered

Session 1223 SOUTH FLORIDA WATER MANAGEMENT GIS FEMA relied upon the GIS of the South Florida Water Management District (SFWMD) in West Palm Beach, Florida, which was already preventing the overwhelmed area from being flooded by the follow-on rainfall.

Session 1224 WISDOM ABOUT GIS “Perhaps the most important lesson learned during Hurricane Andrew is that the GIS must survive a disaster to help out during the aftermath.” Corbgley, Kevin P “South Florida Fine- Tunes GIS in Hurricane’s Aftermath”, GIS World. September, pp

Session 1225 FEMA “FIRSTS” WITH GIS By 1993, FEMA first used real-time flood extent information on GIS maps during the Midwest floods. In 1994, FEMA employed GIS during the California earthquakes.

Session 1226 PRIMARY MISSION OF MAC The MAC’s dissemination of geographic information to the EST/ESF#5 (known as Information and Planning) and the rest of the Agency during disaster operations is its primary mission.

Session 1227 GIS THROUGHOUT FEMA The GIS staff is engaged in GIS map production and analysis for program offices throughout the Agency, including the: Emergency Support Team (EST) Readiness, Response and Recovery Directorate Federal Insurance and Mitigation Administration (FIMA) Administration and Resource Planning Directorate Disaster Field Offices Office of National Preparedness and Homeland Security

Session 1228 GOAL OF E-GIS For emergency events, deployable GIS suites have been developed, and on-call GIS contract support to provide on-site GIS field support to DFOs has been arranged.

Session 1229 NATIONAL RESPONSE PLAN Four concepts comprise the National Response Plan: Prevention Preparedness Response Recovery

Session 1230 PREVENTION Prevention means that the National Response Plan may be implemented for threats or potential Incidents of National Significance to prevent or intervene to lessen the impact of an incident.

Session 1231 PREPAREDNESS Preparedness is a continuous process involving efforts to identify threats, determine vulnerabilities, and identify required resources.

Session 1232 RESPONSE The National Response Plan provides the policies and processes for coordinating Federal support activities that address the short-term, direct effects of an incident.

Session 1233 RECOVERY Recovery involves actions needed to help individuals and communities return to normal, when feasible.

Session 1234 USACE’s Role for FEMA Ever since the Stafford Act was passed in 1988, the USACE has mobilized to serve as the lead for FEMA’s Emergency Support Function (ESF) #3 supplying public works and engineering support.

Session 1235 MAJOR CHANGES IN USACE DISASTER RESPONSE Lead districts were assigned to coordinate major missions such as water, ice, emergency power, debris, temporary moving, and housing. Other areas are covered by contracts made in advance. Pre-scripted assignment statements giving FEMA authorization to another federal agency to respond to a disaster were arranged so they can be given to the USACE by a community for work to begin immediately.

Session 1236 USACE and FEMA Partnering Both agencies review the remedial action plans quarterly to assure that implementation and corrective action are underway.

Session 1237 NEW STAFF STRUCTURE AT FEMA FEMA will use a deputy public assistance office for debris management.

Session 1238 BEFORE HURRICANE ANDREW … Geographic Information had not been perceived as an important ingredient in disaster management.

ANDREWS DEVASTATION

40 USACE MISSIONS IN HURRICANE ANDREW AFTERMATH The list developed as follows: Roofing (plastic sheeting) Debris Generators and Pumps Portable Water Supplies Public Assistance Technical Assistance Portable Toilets Ice Damage Surveys Schools Garbage Showers Hurricane Evacuation (Planning in the event of a second one) Temporary Housing

Session 1241 GIS Mapping for USACE Missions Mapping was required to perform each of these missions: Decisions in accomplishing them rested on tracking huge amounts of information about sources and amounts of available materials for completing the tasks to be done.

Session LANDFILLS FOR ANDREW DEBRIS

Session ACRE CONSTRICTED URBAN AREA

Recovery Samples 1

Session 1245 Preliminary Assessment Map

CRANES MOVE LARGE DEBRIS IN DAISY CHAINS

Session 1247 EVERY BIT OF DEBRIS HAD TO GO THROUGH A FOUR STEP PROCESS extracted inspected for human body parts hauled to Staten Island spread out and inspected for human remains again.

Lidar Image of Ground Zero

Session 1249 NEW YORK CITY EOC…. Gone!