1 From Collaboration to Collaboration An « agile » PLM implementation CERN PLM 2011 Conference September 6th 2011, Gilles Ruffieux.

Slides:



Advertisements
Similar presentations
Conducting your own Data Life Cycle Audit
Advertisements

The Road to Agile From the Bottom Up Kevin Malley Tracey Clark 1 March 20 th, 2013 SWOQG.
Spring Roo and the Cloud Shekhar Gulati.
Understanding Student Learning Objectives (S.L.O.s)
Presentation Title | Date | Page 1 Extracting Value from SOA.
Project Management with VIVA PPM Tool (Project Portfolio Management)
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Implementation of a Validated Statistical Computing Environment Presented by Jeff Schumack, Associate Director – Drug Development Information September.
Cultural Heritage in REGional NETworks REGNET. REGNET Development process.
Armstrong Process Group, Inc. Copyright © , Armstrong Process Group, Inc., and others All rights reserved Armstrong Process.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Modern Systems Analyst and as a Project Manager
Making the System Operational
Lean Kaizen Empowering the Team in Interesting Times 14 September 2010 Robin Armstrong Viner Cataloguing Manager Library & Historic.
ZMQS ZMQS
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
Chapter 6: Integrated Processes
Sven Eppert and Thomas Kapfhamer 26 May 2003 Warsaw School of Economics International Logistics Prof Krzysztof Rutkowski CPFR - the new edge in logistics.
SharePoint success in the business: implementation implementation implementation Ellen van Aken September 25, 2012.
Product Specialist Sage 1000 & CRM Sage UK
A BPM Framework for KPI-Driven Performance Management
Change Management Overview. 2 Objectives Overview of the change management approach Clarity on how the tools support the change approach Apply the change.
Are Parametric Techniques Relevant for Agile Development Projects?
Customer Experience Solutions. Delivered. 1 BANK 2.0 Making Banks Successful in the Era of Engagement Banking.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
The importance of the service catalogue to the service desk
Fifth Edition 1 M a n a g e m e n t I n f o r m a t i o n S y s t e m s M a n a g I n g I n f o r m a t i o n T e c h n o l o g y i n t h e E – B u s i.
Jonathan Berry President & CEO Leveraging a Help Desk as part of a Hyperion Center of Excellence Copyright © 2014, Accelatis.
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Symantec Education Skills Assessment SESA 3.0 Feature Showcase
Innovation in Business Presentation to Aspiring Entrepreneurs VIT University 05 th March 2011.
DevOps The effects of DevOps on your IT service organization
How to commence the IT Modernization Process?
Chapter 2 Using Information Technology for Competitive Advantage Copyright 2001, Prentice-Hall, Inc. MANAGEMENT INFORMATION SYSTEMS 8/E Raymond McLeod,
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Lecture 5: Requirements Engineering
1. 2 Captaris Workflow Microsoft SharePoint User Group 16 May 2006.
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
The European Organisation for the Safety of Air Navigation AIRM Review Forum AIRM Status Report.
25 seconds left…...
From ILL to online ordering? An improved service for OCLC and British Library users Katie Birch – OCLC Samantha Tillett – British Library.
Week 1.
Organizational Innovation
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
© Prentice Hall CHAPTER 15 Managing the IS Function.
Chapter 11: Systems Development and Procurement Copyright © 2013 Pearson Education, Inc. publishing as Prentice Hall Chapter
Berlin, Germany June 20, Extending the Kernel with Practices to Create Methods Brian Elvesæter SINTEF, Oslo, Norway.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
Creative Commons Sustainable IT Architecture year plan 1 / 18 Sustainable IT Architecture Sustainable IT Architecture.
RAT R1 R2 R3 R4 R5 R6 R7 Fetch Q RS MOB ROB Execute Retire.
Scalable Rule Management for Data Centers Masoud Moshref, Minlan Yu, Abhishek Sharma, Ramesh Govindan 4/3/2013.
<<replace with Customer Logo>>
New Product Development Management NPDM 11 Mohsen SADEGHI
Tuesday, June 8 th, Agile Development-Successful Delivery & Implementing Across the Enterprise.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
IT Requirements Management Balancing Needs and Expectations.
Presented To: Dr. Dina Rateb MOIS 549 Class Presented By: Karim Aguib.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Confidential and Proprietary 1 Project Management using Scrum at Wachovia.
Oracle Agile Product Lifecycle Management Project January 5, 2011.
Background - Business Vision
Caitlin Grzybala Content Operations Analyst
E2E Testing in Agile – A Necessary Evil
Presentation transcript:

1 From Collaboration to Collaboration An « agile » PLM implementation CERN PLM 2011 Conference September 6th 2011, Gilles Ruffieux

Agenda 1 Brand & Context 2 PLM as a solution 3 Implementation 4 New Product Development Methodology 5 First Results 6 Conclusion

TODAY High creativity – High value Fashion Time Brand Repositionning 1. Brand & Context Corum: A high value watchmaker 3

1. Brand & Context The vision

1. Brand & Context The challenge Today Product Reconstruction Product Affirmation 15’000 watches/yr 160 employees 5 subsidiaries 450 Points of sale 3 owned Boutiques % of the Collection recreatedbased on a modern reinterpretation of Corum’s DNA

1. Brand & Context The craftman’s way to do it ! 6 New People No process No tools to support No time to build High pressure on delays No compromise in Quality, Content & Design External Risks -Suppliers - New market positionning Commando Mode

1. Brand & Context People involved in productdevelopment 7 1 CEO 2 Marketing : 1 Director, 2 Product Managers 3 Product Dev. : 1 Director, 1 Designer, 4 Project Leaders 4 Techical Dpt ; 2 Engineers 5 Logistic Dpt : 1 Directors, 4 buyers 6 After-Sale dpt : 2 persons 6 Master Data : 2 persons 7 Production & Quality : 3 persons Total : 23/100 1 on 5

1.Brand &Context The impact 8 People & teams High pressure Stress Communication failures Demotivation Data Management Broken and destructured Duplicate & non consistent Heavymanual Workload for change Operationnalrisks Deliveriesdriven by production capacity Cost of non-efficency Deliverydelays Cash Flow We need a strong Product Development Methodology To ease development To capture and maintain the short TTM we already gained To reduce all the risks

Supply- chain Methods & Manufact. After-Sale Services Product Development Key successfactors STEP 1STEP 2 Select a product Rapidimplementati on Direct usability NPD Methodology Fundamental lifecycle Rules and workflow CenteredaroundProject Data Capture information as soon as itisknown 2. PLM as a Project (GED = EDM in french) 9 Project

2. PLM as a solution Selection of a PLM Constraints Coverthe full scope of the PLM project Very flexible to beabele to followclosely ournever-endingevolution Shouldmakeveryeasythe check-in of documentation Must bemanageableinternally Strongrelationshipbetween the PLM application developer&Corum'sintegrator PLM application integratorshouldunderstand the companiesspecificactivities and constraints PLM app. dev. takeson bears part of the risks (crisis time) 10

Projets & doc Article et & BOM Integration & SI Corum Methodology PLM Detailled Parts definition&implementation Corum Methodology Implementation @GED Projet Documents Macro-Parts Data management rules and processdefinition 1 Representative team project 2 Pilot & Test 3 Adaptation & Correction 4 Training 5 Roll-Out Failed CONCEPT CRASH AGAINST REALITY ! 2. PLM as a Project Concept…

1 ERP Parts & BOM Upload 2 Part Lifecyle and creation process implementation 3 Supplier Technical Drawing Process implementation 4 Corum Methodoly Definition implemented in an agile way 5 Direct Integration and use of all users 6 Direct adaptation to fit the real field reality 3. Implementation From classic to agile 12

3. Implentation Process: Users integration and feedback 13

Process Broken in Tools fulfillthe needs Project Tracking Sprint 1 Project Managers Sprint 2 Project Managers Sprint 1 IT Improvements Immature process Tools in beta version 3. Implentation Followup and optimization Coaching Presentation of improvements 14

Scrum Master Product Owner Waiting validated Sprints Backlog Validation Customer Sprint 1 15 Scrumsprocesseapplied to NPD 15 3 layers system Projet A Projet B Projet C

4. NPD Methodology First step: Agile light Customer Product owner Scrum Master Marketing Brief PreStudyStudyImplementation Tests & Delivery Initial cost marketing Initial cost Dev ±20% Estimatecost Dev ±10% Final cost Dev 16

4. NPD Methodology Second step: Transition to agile strong 17 Customer CEO Product owner Dir. Dév. Scrum Master Roues R0 Contextualisatio n R1 Conceptualisati on (Interne/Extern e) R2 Calcul PRF J2 ± 10% R3 Maquettage (Externe) R4 Etude technique R5 Prototypage (Externe) R6 Nomenclatures / Gammes R7 Appeld'offre R8 Etude de l'offre R9 Dossier fabrication R10 Calcul PRF J4 R11 Comparaison et vaildation du PRF J4 R12 Commandes R13 Production v1v2v3

5. Results Project Control Center Nextproduct Next vue: Dev Log SAV Prod Nextproject Acces reports 18

Change Request Comp 1 Comp 2 Comp 3 Product A PLM Integrated Change management Improvement of data culture Change Impact Change Validation Change Realization Change Refused PLM Integrated Retro-planning 5. Results Other Benefits

Internal External 6. Conclusion Impact on IS Architecture ERP Proconcept ERP WMS KLS Gildas CAQC Qualigest PLM AUDROS PIM Centrix XRM CAO Inentor vault marcom.corum.ch Internal External ERP Proconcept ERP WMS KLS Gildas CAQC Qualigest PIM Centrix CAO Inventor vault sav.corum.ch BI Iphone / Ipadapps marcom.corum.ch sav.corum.ch

6. Conclusion Project for a new architecture The future Advantages One user one tool all access to needed data Elimination of licences costs Bettercomprehensionof the processes and tools by the user Data flownbetween applications facilitated Better collaboration and follow-up betweendepartements Effort on Data Qualitywillbeeased Data Governancecanbecome a reality 21 MIDDLEWARE ERP PCS GQAO BI CENTRIX CRM PLM COLLABORATIVE LAYER ?

THANK YOU FOR YOUR ATTENTION Contacts and questions 22 Integrator PLM app. Dev. Montres Corum Sàrl Gilles Ruffieux Organization& IS Director Follow Specialthanks to : Michael Ingram for hiswork on New DevelopmentMethodology& Samuel Loup for hiswork on the Project