ISO certificering i projektledelse Opsamlingsforelæsning Projektledelse (42430) forår 2013.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT BASICS
Advertisements

COBIT® 5 for Assurance Introduction
EMS Checklist (ISO model)
PROJECT MANAGEMENT for CONSTRUCTION
Degree and Graduation Seminar Scope Management
Program Management Overview (An Introduction)
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Author:Prof.Dr.Tomas Ganiron Jr1 CHAPTER 7 PROJECT EXECUTION, MONITOR & CONTROL PROCESS 7-1 Project Executing process 7-2What is Project monitor & control.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Purpose of the Standards
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Project management INTRODUCTION. Information Technology Project Management, Fourth Edition 2 IT projects have a terrible track record. A 1995 Standish.
Fundamentals of Project Management
Project Management Framework. PMBOK ® Guide, Third Edition.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
Welcome ISO9001:2000 Foundation Workshop.
Project Management Lecture 5+6 MS Saba Sahar.
Project Management Fundamentals Project Organization and Integration
Project Human Resource Management
What is Business Analysis Planning & Monitoring?
Advanced Project Management PM Processes and Framework
Project Management: Madness or Mayhem
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
PMP® Exam Preparation Course
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Adaptive Processes Project Management Body of Knowledge
ICE2401 Project Management
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Management & Development of Complex Projects Course Code - 706
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
1 © The Delos Partnership 2004 Project Management Organisation and Structure.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
Project Management For the Non Project Manager 1.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
2 nd Knowledge Area : Project Scope Management. Importance of Good Project Scope Management 1995 CHAOS study cited user involvement, a clear project mission,
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Advanced Project Management PM Processes and Framework Lecture #5 Ghazala Amin.
Introduction to Project Management.  Explain what a project is?  Describe project management.  Understand project management framework.  Discuss the.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
ISO Page Protection notice / Copyright notice QEHS & Holst PMI | Top Ten Reasons Projects Fail 1.Inadequately trained.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
A process is "a series of actions bringing about a result.“ Project processes typically consist of project management processes and product-oriented processes.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
The Project Management Process Groups
Introduction to Project Management Project Management Certificate Series – Day 4 Project Management Processes.
Information Technology Project Management, Seventh Edition.
B U D I L U H U R U N I V E R S I T Y POST GRADUATE PROGRAM MAGISTER ILMU KOMPUTER (M.Kom) IS PROJECT MANAGEMENT.
Process and customizations
Project Management PTM721S
Project Integration Management
TechStambha PMP Certification Training
Project Management Process Groups
Portfolio, Programme and Project
Presentation transcript:

ISO certificering i projektledelse Opsamlingsforelæsning Projektledelse (42430) forår 2013

Agenda (8-13): Certificeringsprocessen og prøven Præsentation af standarden Øvelse Spørgsmål

Certificeret projektleder Pilotprojektet Samarbejde mellem DTU og DSC Fokus på ISO (dansk oversættelse på vej) Det er frivilligt om du vil blive certificeret Som studerende får du standarden til låns af DS Certificering

Hvad får jeg ud af det? Du får et diplom som viser du er certificeret projektleder Du bliver listet i DSCs database over projektledere – hvor du også kan dokumentere dine erfaringer og kompetencer Du får lov til at beholde den ISO standard du får udleveret

Hvad kræver det? Gennemføre kurset og forstå standarden Bestå kursets mundtlige eksamen Bestå den skriftlige multiple choice eksamen Betale et registreringsgebyr på 450,- til DSC

Certificeret projektleder Den skriftlige eksamen: Lørdag den 22. juni på DTU Blanding af muliple choice og essay spørgsmål Hæfte med opgaver Afleveres til DSC 22. juni

Efter skriftlig eksamen Tredobbelt kontrol af jeres besvarelser I få besked om jeres score og om I er bestået Er I bestået får I mulighed for at betale Har I betalt får I certifikat og bliver listet på websitet Består I ikke, så får I bekræftelse på at I lever op til krav 1 og 2 – så I kan tage prøven igen om 6 måneder

Certifikatet og websitet

Beståelseskriteriet Man skal kunne sproget Man skal forstå relationerne Man skal kunne navigere standarden Man skal kunne bruge modellen

Eksamensopgaverne Multiple choice: Defintioner X is to Y: Anfør forskellen Essay: Forklar… Fill in the blanks: Hvad hører sammen… Case: Hvordan ville du… Der er i alt 125 points og man skal have 65 Minimum 60% består

Hvad er vigtigt? Terms and definitions - samples Activity (2.1): Identified component of work within a schedule that is required to be undertaken to complete a project Application area (2.2): Category of projects that generally have a common focus related to a product, customer or sector Baseline (2.3): Reference basis for comparison against which project performance is monitored and controlled Change request (2.4): Documentation that defines a proposed alteration to the project

Hvad er vigtigt?

Implementing Closing Controlling PlanningInitiating

Hvad er vigtigt?

Spørgsmål?

ISO standarden DTUs projektlederuddannelse Projektledelse (42430) forår 2013

En blandt mange standarder PMI Amerikansk IPMA Europæisk Prince 2 Engelsk ISO International

□ Introduction and scope □ Terms and definitions □ Central concepts □ Project management processes □ Appendices ISO standarden

Aim of the standard …providing guidance on concepts and processes of project management that are important for, and have impact on, the performance of projects.

Audience senior managers and project sponsors, in order to provide them with a better understanding of the principles and practice of project management and to help them give appropriate support and guidance to their project managers, project management teams and project teams; project managers, project management teams and project team members, so that they have a common basis upon which to compare their project standards and practices with those of others; developers of national or organizational standards, for use in developing project management standards, which are consistent at a core level with those of others.

Scope This International Standard provides guidance for project management Can be used by any type of organization, including public, private or community organizations, and for any type of project, irrespective of complexity, size or duration. This International Standard provides high-level description of concepts and processes that are considered to form good practice in project management. Projects are placed in the context of programmes and project portfolios, however, this International Standard does not provide detailed guidance on the management of programmes and project portfolios. Topics pertaining to general management are addressed only within the context of project management.

□ Introduction and scope □ Terms and definitions □ Central concepts □ Project management processes □ Appendices ISO standarden

A project is…! A project is a unique set of processes consisting of coordinated and controlled activities with start and end dates, performed to achieve project objectives. Achievement of the project objectives requires the provision of deliverables conforming to specific requirements. Although many projects may be similar, each project is unique. Project differences may occur in the following: deliverables provided; stakeholders influencing; resources used; constraints; the way processes are tailored to provide the deliverables. Source: ISO (2012)

Project management is …! …the application of methods, tools, techniques and competencies to a project. Project management includes the integration of the various phases of the project life cycle. …performed through processes. The processes selected for performing a project should be aligned in a systemic view. Each phase of the project life cycle should have specific deliverables. These deliverables should be regularly reviewed during the project to meet the requirements of the sponsor, customers and other stakeholders. Source: ISO (2012)

Terms and definitions (1-4) Activity (2.1): Identified component of work within a schedule that is required to be undertaken to complete a project Application area (2.2): Category of projects that generally have a common focus related to a product, customer or sector Baseline (2.3): Reference basis for comparison against which project performance is monitored and controlled Change request (2.4): Documentation that defines a proposed alteration to the project

Terms and definitions (5-8) Configuration management (2.5): Application of procedures to control, correlate and maintain documentation, specifications and physical attributes Control (2.6): Comparison of actual performance with planned performance, analysing variances and taking appropriate corrective and preventive action as needed Corrective action (2.7): Direction and activity for modifying the performance of work to bring performance in line with the plan Critical path (2.8): Sequence of activities that determine the earliest possible completion date for the project or phase

Terms and definitions (9-10) Lag (2.9): Attribute applied to a logical relationship to delay the start or end of an activity Lead (2.10): Attribute applied to a logical relationship to advance the start or end of an activity

Terms and definitions (11-13) Preventive action (2.11): Direction and activity for modifying the work, in order to avoid or reduce potential deviations in performance from the plan Project life cycle (2.12): Defined set of phases from the start to the end of the project Risk register (2.13): Record of identified risks, including results of analysis and planned responses

Terms and definitions (14-16) Stakeholder (2.14): Person, group or organization that has interests in, or can affect, be affected by, or perceive itself to be affected by, any aspect of the project Tender (2.15): Document in the form of an offer or statement of bid to supply a product, service or result, usually in response to an invitation or request Work breakdown structure dictionary (2.16): Document that describes each component in the work breakdown structure

□ Introduction and scope □ Terms and definitions □ Central concepts □ Project management processes □ Appendices ISO standarden

Project management concepts KEY: Boxes represent project management concepts Arrows represent a logical flow by which the concepts are connected Dotted lines represent organizational boundaries Source: ISO (2012)

External Environment Factors: socio-economic, geographical, political, regulatory, technological and ecological … may have an impact on the project by imposing constraints or introducing risks affecting the project. … are often beyond the control of the project manager, they should still be considered. Source: ISO (2012)

Organisation Environment Organizational strategy (3.4.1) Opportunity evaluation and project (3.4.2) Benefits realization / initiation (3.4.3) Source: ISO (2012)

Organizational context ( ) A project usually exists inside a larger organization encompassing other activities. Projects may be organized within programmes and project portfolios. Source: ISO (2012)

Portfolio management ( ) A project portfolio is generally a collection of projects and programmes and other work that are grouped together to facilitate the effective management of that work to meet strategic goals. Project portfolio management includes identifying, prioritizing, authorizing, directing and controlling projects, programmes and other work to achieve specific strategic goals Source: ISO (2012)

Programme management ( ) A programme is generally a group of related projects and other activities aligned with strategic goals. Programme management consists of centralized and coordinated activities to achieve the goals. Source: ISO (2012)

Project governance (3.6) Governance is the framework by which an organization is directed and controlled Project governance may include subjects such as the following: – defining the management structure; – the policies, processes and methodologies to be used; – limits of authority for decision-making; – stakeholder responsibilities and accountabilities; – interactions such as reporting and the escalation of issues or risks. Source: ISO (2012)

Projects and operations (3.7) Operations are performed by relatively stable teams through ongoing and repetitive processes and are focused on sustaining the organization; Projects are performed by temporary teams, are non-repetitive and provide unique deliverables Source: ISO (2012)

Stakeholders and project organization (3.8) Stakeholder (2.14): Person, group or organization that has interests in, or can affect, be affected by, or perceive itself to be affected by, any aspect of the project Source: ISO (2012) …leads and manages project activities and is accountable for project completion …supports the project manager in leading and managing the project activities …performs project activities …contributes to the project by providing senior level guidance to the project. …authorizes the project, makes executive decisions and solves problems and conflicts beyond the project manager’s authority

Contextual competencies Technical competencies Behavioural competencies Each project team requires competent individuals who are capable of applying their knowledge and experience to provide the project deliverables. contextual competencies, related to the management of the project inside the organizational and external environment technical competencies, for delivering projects in a structured way, including the project management terminology, concepts and processes defined in this International Standard Competencies of project personnel (3.9) Source: ISO (2012) IPMA (2013) Behavioral competencies are associated with personal relationships inside the defined boundaries of the project

Project life cycle (3.10) The project life cycle spans the period from the start of the project to its end. The phases are divided by decision points, which can vary depending on the organizational environment. The decision points facilitate project governance. By the end of the last phase, the project should have provided all deliverables Project life cycle (2.14): Defined set of phases from the start to the end of the project Source: ISO (2012)

Project constraints (3.11) the duration or target date for the project; the availability of the project budget; the availability of project resources, such as people, facilities, equipment, materials, infrastructure, tools; factors related to health and safety of personnel; the level of acceptable risk exposure; the potential social or ecological impact of the project; laws, rules and other legislative requirements Achievement of consensus among key project stakeholders on the constraints may form a strong foundation for project success. Source: ISO (2012)

Relationship between project management concepts and processes (3.12) Project management is accomplished through processes utilizing the concepts and competencies described. A process is a set of interrelated activities. Processes used in projects are generally categorized into three major types: project management processes, which are specific to project management and determine how the activities selected for the project are managed; delivery processes, which are not unique to project management, which result in the specification and provision of a particular product, service or result, and which vary depending on the particular project deliverable; support processes, which are not unique to project management and which provide relevant and valuable support to product and project management processes in such disciplines as logistics, finance, accounting and safety.

□ Introduction and scope □ Terms and definitions □ Central concepts □ Project management processes □ Appendices ISO standarden

Making projects successful (4.1) select appropriate processes described in 4.3 that are required to meet the project objectives; use a defined approach to develop or adapt the product specifications and plans to meet the project objectives and requirements; comply with requirements to satisfy the project sponsor, customers and other stakeholders; define and manage the project scope within the constraints, while considering the project risks and resource needs to provide the project deliverables; obtain proper support from each performing organization, including commitment from the customers and project sponsor.

Two perspectives on PM Processes The project management processes may be viewed from two different perspectives: – as process groups (see 4.2.2) for the management of the project; – as subject groups (see 4.2.3) for collecting the processes by subject

Project management subjects ISO Subjects PMBoK® Guide Knowledge Areas Integration Stakeholder- Scope ResourceHuman Resources Time Cost Risk Quality Procurement Communication

Subject groups Integration …includes the processes required to identify, define, combine, unify, coordinate, control and close the various activities and processes related to the project ( ) Stakeholder…includes the processes required to identify and manage the project sponsor, customers and other stakeholders ( ) Scope… includes the processes required to identify and define the work and deliverables, and only the work and deliverables required ( ) Resource… includes the processes required to identify and acquire adequate project resources such as people, facilities, equipment, materials, infrastructure and tools ( ) Time …includes the processes required to schedule the project activities and to monitor progress to control the schedule ( ) Cost …includes the processes required to develop the budget and to monitor progress to control costs ( ) Risk… includes the processes required to identify and manage threats and opportunities ( ) Quality… includes the processes required to plan and establish quality assurance and control ( ) Procurement… includes the processes required to plan and acquire products, services or results, and to manage supplier relationships ( ) Communication…includes the processes required to plan, manage and distribute information relevant to the project ( )

Project management processes Implementing Closing Controlling PlanningInitiating

Map of Processes & subjects

Create work breakdown structure (4.3.12) The purpose of Create work breakdown structure is to provide a hierarchical decomposition framework for presenting the work that needs to be completed, in order to achieve the project objectives. The work breakdown structure provides a framework for dividing and subdividing the project work into smaller, thus more manageable, pieces of work. The work breakdown structure can be structured, for example, in project phases, major deliverables, discipline and location. Each descending level of the work breakdown structure describes project work in an increasingly detailed level. It is possible to develop other hierarchical breakdown structures for methodically assessing items such as deliverables, organization, risk and cost accounting of the project. The primary inputs and outputs are listed in Table 12.

Projektdokumenter

□ Introduction and scope □ Terms and definitions □ Central concepts □ Project management processes □ Appendices ISO standarden

Initiating

Planning

Implementing

Controlling

Closing

□ Introduction and scope □ Terms and definitions □ Central concepts □ Project management processes □ Appendices ISO standarden

Øvelse

Øvelse: Design af projektledelsesprocesser Gå sammen i grupper Find et eksempel på et projekt (gerne et simpelt) Hvordan vil I organisere ledelsen af projektet igennem projekts livscyklus? Ca.45 min gruppearbejde Opsamling in plenum

Spørgsmål