Jeju, 13 – 16 May 2013Standards for Shared ICT GSC-17 Closing Plenary Summary Report KyuJin Wee, Chair Cloe HeeSung Lim, Rapporteur Document No: GSC17-CL-37 Source: GSC-17 Chair, GSC-17 Rapporteur Contact: KyuJin Wee, GSC Session: Closing Plenary Agenda Item: 6.1
GSC17-CL-37 GSC-17, Jeju / Korea 2 GSC-17 Schedule
GSC17-CL-37 GSC-17, Jeju / Korea 3 GSC-17 Attendance (1) GSC-17GSC-16GSC-15 JejuHalifaxBeijing May. 2013Nov. 2011Sep Total Attendees Opening Plenary GRSC GTSC Admin WG IPR WG Closing Plenary 8583 Total of 85 people attended GSC-17 including Members, Observers and Sponsors:
GSC17-CL-37 GSC-17, Jeju / Korea 4 Members (75 Delegates) : –ARIB : 7 –ATIS : 7 –CCSA : 6 –ETSI : 8 –ISACC : 3 –ITU : 2 –TIA : 10 –TTA : 20 –TTC : 9 Task Force Chairs (5, included above) Observers (13 representatives, one of which was also on a PSO delegation) GSC-17 Attendance (2)
GSC17-CL-37 GSC-17, Jeju / Korea 5 GSC-17 Attendance (3)
GSC17-CL-37 GSC-17, Jeju / Korea 6 sc17_document.jsphttp:// sc17_document.jsp Meeting Documents
GSC17-CL-37 GSC-17, Jeju / Korea 7 Quantity of Contributions Opening Plenary ADMIN WG IPR WGGRSC-10GTSC-10Closing Plenary Output Resolutions
GSC17-CL-37 GSC-17, Jeju / Korea 8 GSC-17 Opening Plenary (GSC17-CL-02) –This report was presented and approved at the GSC-17 Closing Plenary GRSC-10(GSC17-CL-03) –This report was presented and approved at the GSC-17 Closing Plenary GTSC-10(GSC17-CL-04) –This report was presented and approved at the GSC-17 Closing Plenary ADMIN WG(GSC17-CL-05r1) –This report was presented and approved at the GSC-17 Closing Plenary IPR WG(GSC17-CL-06) –This report was presented and approved at the GSC-17 Closing Plenary Meeting Reports (1)
GSC17-CL-37 GSC-17, Jeju / Korea 9 HoD meeting –GSC HoD Adhoc was created for the restructuring of GSC –ToR agreed as contained in the ADMIN WG report (GSC17-CL- 05r1) –Chair (Jim MacFie, ISACC), Vice Chair (Steve Barclay, ATIS) were approved –Target date for making recommendation was agreed as 1 st January 2014 Meeting Reports (2)
GSC17-CL-37 GSC-17, Jeju / Korea 10 Output Resolutions (1) Resolution Number SourceTitleStatus GSC-17/01Plenary Continuing Cooperation on IMT Standardization Revised GSC-17/02PlenaryEmergency CommunicationsReaffirmed GSC-17/03PlenaryNetwork Aspects of Identification SystemsReaffirmed GSC-17/04Plenary Identity Management and Identification Systems Reaffirmed GSC-17/06PlenaryIPTV StandardsRevised GSC-17/08PlenaryICT and the EnvironmentRevised GSC-17/10GTSC Future Networks including enhancements of Next Generation Networks (NGN) Revised GSC-17/11PlenaryCybersecurityReaffirmed GSC-17/12PlenaryHome NetworkingReaffirmed GSC-17/13GRSC Global UWB Standardization including UWB radar and Sensor/Imaging Applications Reaffirmed
GSC17-CL-37 GSC-17, Jeju / Korea 11 Output Resolutions (2) Resolution Number SourceTitleStatus GSC-17/14Plenary Intelligent Transport Systems (ITS) task Force Revised GSC-17/15GRSC Reconfigurable Radio Systems Revised GSC-17/17GRSC Mobile Multimedia Broadcast and Multicast Reaffirmed GSC-17/19Plenary Facilitating Liaison in Relation to Measurement Methodologies, associated Measurement Uncertainty and Calibration Reaffirmed GSC-17/20GRSC Radio Microphones and Cordless Audio Standardization Reaffirmed GSC-17/21GRSC Broadband Wireless Access, RLANs and ad-hoc Networking Revised GSC-17/22IPR WG Intellectual Property Rights Policies Reaffirmed GSC-17/23IPR WG Cooperation with Patent Trademark Offices Reaffirmed GSC-17/24IPR WG Open Standards Reaffirmed
GSC17-CL-37 GSC-17, Jeju / Korea 12 Output Resolutions (3) Resolution Number SourceTitleStatus GSC-17/25Plenary Personally Identifiable Information Protection Reaffirmed GSC-17/27Plenary User Needs, Considerations and Involvement Withdrawn GSC-17/27Plenary ICT Accessibility Reaffirmed GSC-17/28Plenary Interoperability Reaffirmed GSC-17/29Plenary Smart Grid Revised GSC-17/30Plenary Machine to Machine Revised GSC-17/31Plenary Service Oriented Networks Reaffirmed GSC-17/32Plenary Cloud Computing Revised GSC-17/33GRSC Radio Aspects of Electronic Article Surveillance Withdrawn GSC-17/34Plenary Wireless Charging System (WCS) Revised
GSC17-CL GSC-17 Communiqué Communiqué published in GSC17-CL-36r1
GSC17-CL-37 GSC-17, Jeju / Korea 14 Sequence of hosts and locations for future GSC meetings –GSC-18, hosted by ETSI, 21 st July 2014, Sophia Antipolis –GSC-19, hosted by ITU –GSC-20, hosted by ATIS/TIA –GSC-21, hosted by CCSA –GSC-22. hosted by ARIB/TTC GSC-17 and Beyond