Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

Madrid, 13 th November th SG Meeting South Gas Regional Initiative.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Paris, 14 th December th IG Meeting South Gas Regional Initiative.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
ENTSOG’s view on next steps for regional co-operation Nigel Sisman Senior Adviser Stakeholder Group, GRI NW, Brussels, 26 Nov 2010.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
New structure of GRI NW following revised road map Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman GRI NW.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
TSO Transparency project Gas Regional Initiative North West Ofgem, Great Britain Regional Co-ordination Committee 18th February 2011.
Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Vision EC on future role Regional Initiatives RCC The Hague, 18 February 2011 Programme Office GRI NW.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Madrid, 27 th October th IG Meeting South Gas Regional Initiative.
Madrid, 17 th February th IG Meeting South Gas Regional Initiative.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Madrid, September 23 rd th SG Meeting South Gas Regional Initiative Open Season for future capacity.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Gas Regional Initiatives Getting to 2014 Steven Gordon Head of the Gas Department, ACER 8 th GRI Co-ordination Meeting Brussels, 27 th February 2012.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
Madrid, April 1 st th SG Meeting South Gas Regional Initiative Working Group 4B : Open Seasons.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
European Developments Transmission Workgroup 1 st December 2011.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
European Developments Transmission Workgroup 3 rd May 2012.
GRI NW European Energy Work Plan 2011 – 2014 Robert Spencer 20th Madrid Forum, 26 September 2011.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Regional Initiative South South-East
19th GRI Coordination Group meeting
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
GRI NW TRANSPARENCY PROJECT
26th February 2015 Teleconference
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan project
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
26th February 2015 Teleconference
Gas Regional Initiative South South-East
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative South South-East
Presentation transcript:

Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -

2 RCC The Hague, 12 May 2011 Work plan of GRI NW for 2011 Work plan Transparency: Ensure full and consistent implementation of information provisions Investment: Assist ENTSO-G in regional plans and monitor open season Lux – Fr Pre-com meetings: Give member states early understanding in FG/ NC’s Preparatory work: Getting the approach right for implementation work 3 4  Three out of four projects are started

Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -

4 RCC The Hague, 12 May 2011 Purpose and Objective  Gas Regulation No 715/2009, effective from 3 rd March 2011 includes a number of enhanced transparency requirements under Article 18 and under amended Chapter 3 of Annex 1 of the Gas regulation  The proposed objectives of this project: 1.Monitor compliance of TSOs against the requirements outlined under Article 18 and amended Chapter 3 of Annex 1 of Gas Regulation No 715/ Assess the quality of the data published.

5 RCC The Hague, 12 May 2011 Steps Project plan was discussed at February RCC and sent to stakeholders for comments Agree project plan and establish project team Agree interpretation of the transparency requirements under Gas Regulation (as part of this initial stage stakeholders such as EFET will be consulted) Agree information/ compliance template Request TSOs to populate information template Assess/ clarify populated template Publish completed template, invite stakeholder comment Publish compliance assessment

6 RCC The Hague, 12 May 2011 Step 1: Stakeh older Respon ses  ENTSO-G: Pan-European rather than regional approach to monitoring compliance preferred  IFIEC: Happy with project plan to monitor compliance and assess quality of data published. Will only comment on final report  EFET: Delay in responding formally Mixed response from stakeholders – do we have sufficient buy-in to continue?

7 RCC The Hague, 12 May 2011 Benefit s of this project  Do you think this project adds value and how important is it? 1.Very important 2.Important 3.Neutral 4.Not Important 5.Very low priority How worthwhile is the project if we lack strong stakeholder support?

8 RCC The Hague, 12 May 2011 Step 2: Com mon inter preta tion of Anne x  Prior to stakeholder comments – step 2: agreeing common interpretation of gas regulation was started  Regulators discussed initial views via teleconference on 3 May – general agreement on most terms  Comments consolidated into draft table outlining regulators views and sent to RCC members Do you have any additional comments on the draft interpretation? We propose to send the draft table to stakeholders for comments – do you agree?

9 RCC The Hague, 12 May 2011 Gas Regional Initiative Region North-West Investment Project Marie-Claire Aoun, CRE

10 RCC The Hague, 12 May 2011 Two objectives: —Help ENTSOG with the regional plan work in 2011 —Monitoring the open season between France and Luxembourg and share lessons for future processes

11 RCC The Hague, 12 May 2011  3rd TYNDP workshop of 17 March 2011 —The publication of the Gas Regional Investment Plans (GRIPs) is an obligation for TSOs —Role of ENTSOG: provide framework and guidance to support the development of the GRIPs  ENTSOG feedback on the Project Plan (18 April 2011)  Several meetings between TSOs are scheduled – ENTSOG will inform PO of progress  Where direct support of GRI NW would be helpful, ENTSOG will ensure that the PO is advised  Welcome an opportunity to present the GRIP at the next SG ENTSOG feedback on the project

12 RCC The Hague, 12 May 2011  Bilateral meeting CEER – ENTSOG (3 May 2011)  6 GRIPs with one TSO responsible for coordination -GRI NW coordinated by Fluxys -South GRI coordinated by ENAGAS (Spain) -France-Germany-Switzerland-Italy coordinated by Snam rete gas (Italy) -BEMIP coordinated by Gas System (Poland) -North-South East coordinated by Net4gas (Czech Republic) -Southern corridor coordinated Desfa (Greece)  TSOs are willing to present an update and if needed support from GRIs but ENTSOG insisted once again that the elaboration of these plans is a task for TSOs.  Other stakeholders: Positive feedback from IFIEC - No reaction from EFET  Next steps?, ENTSOG feedback on the project

13 RCC The Hague, 12 May 2011  Open season to increase firm capacity from France to Luxembourg  Coordinated process between the TSOs (CREOS and GRTgaz) and the regulators (CRE and ILR)  Two possible scenarios: 9 GWh/d or 40 GWh/d available in 2015  Non-binding phase launched at the SG meeting (26 Nov.2010) – ended 31 January 2011  Launch of the binding phase currently under discussion  Aim of the project:  Use the GRI NW as a platform for discussion of the process  Outcome of discussions synthesized in a short paper in order to share the lessons from this process, in terms of coordination, allocation rules (joint allocation office), transparency etc…  Feed the discussions on the European level: revision of the GGPOS  Expected milestones:  October 2011: presentation of the progress of the OS at SG meeting and preliminary lessons learned  November 2011: Final paper on lessons learned to be shared at a European level for the GGPOS revision Monitoring the OS between France and Luxembourg

14 RCC The Hague, 12 May 2011 Thank you for your attention!