Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.

Slides:



Advertisements
Similar presentations
Regulation of Low Level Waste Management
Advertisements

Prepare Strategic Business Cases for NDA Consolidate nuclear materials at Sellafield –Work underway with Sellafield Ltd. –Developing final business case.
LOW LEVEL RADIOACTIVE WASTE MANAGEMENT Implementation issues – the Governments perspective (DECC & NDA) Bruce Cairns & Matthew Clark 22 nd March 2011.
NuLeAF Opportunities for Storage Consolidation of Higher Activity Wastes 4 th November 2011.
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Operating Experience in Spent Fuel Storage Casks T.Aida, T.Hara, Y.Kumano Tokyo Electric Power Company IAEA-CN-178/KN27 3 June 2010.
Lithuanian concept for disposal of
Dr Paul Dorfman Nuclear Consultation Group Helsinki, 8 May 2009 High Burn-up Radioactive Spent Fuel.
International Workshop on High Level Radioactive Waste and Spent Fuel Management - Storage and Disposal Status of U.S. Used Nuclear Fuel Disposition Program.
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Challenges in LLW Management: a Local Government Perspective Fred Barker, Executive Director, NuLeAF SAFESPUR FORUM 29 April 2009.
Dounreay Nuclear and Chemical Land Contamination.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
Legacy Waste Retrieval And Treatment Processing Methods At RSRL Harwell Site Author : Marc Rigby Presented by : Malcolm Adam 28 th May 2009.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
UK Nuclear Policy Andrew Beirne
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
The SKB Spent Fuel Disposal Project – License Application
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
1 RADIOACTIVE WASTE MANAGEMENT (PART 4) A RAHMAN RWE NUKEM Ltd (UK) Name, company and chapter.
UK Cleanup Market Overview A Strategic approach to Cleanup & Hazard Reduction Nov 2010 Marcus Mackay mercury stone.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
The Way Forward in the US: Nuclear Waste Management Allison Macfarlane AAAS San Diego February 19, 2010.
SAFESPUR FORUM - Challenges in reducing the burden on the UK’s national Low Level Waste Repository 29 April 2009, Birchwood.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
IAEA NSF Conference 2010 Nuclear Spent Fuel Management in Spain Pablo Zuloaga.
Handling of Future Human Actions in the safety assessment SR-Site Eva Andersson.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
Nuclear Fuels Storage and Transportation Planning Project
Current and future challenges in disposing of LLW – the LLWR perspective SAFESPUR WORKSHOP 29 April 2009 Presented By: Chuck Conway, Head of Consignor.
Sustainable Cycle Solutions World Nuclear Association London, Sep 12 th, 2013 Caroline Drevon SVP Strategy, Sales & Innovation Back-End Business Group.
May Hazard Classification of the Remote Handled Low-Level Waste Disposal Facility Boyd D. Christensen Battelle Energy Alliance, Idaho National Laboratory.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
Eric M. Davied American Nuclear Society Texas A&M University
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
ILW disposal in the UK Presentation at IAEA TM-45865, September 2013 Cherry Tweed – Chief Scientific Advisor.
The Swiss geological programme and the role of storage Jürg Schneider National Cooperative for the Disposal of Radioactive Waste International Workshop.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Radioactive Waste Management Limited Protective marking UK Geological Disposal Safety Case Early design stage operational safety case structure GEOSAF.
David G Bennett December 2014
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
Integrated Waste Management Strategy – preparing for SIII NuLeAF – 29 th January 2015.
NuLeAF Seminar NDA Integrated Waste Management Strategy Programme update 24 th October 2012.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Nuclear Engineering Division Argonne National Laboratory.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
International Atomic Energy Agency V. Nys Definition and practical application of demonstration of operational and long-term safety for predisposal RWM.
It Is a Moral Issue – Why We Should Say ‘No’ to Nuclear Andrew Blowers Presentation at Thornbury, November 2010.
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
NDA Draft Strategy.
Jiří Slovák, Vítězslav Duda
Radioactive Waste and Spent Fuel Management in Hungary
Radioactive Waste Management Limited
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
Presentation transcript:

Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011

Structure of Presentation Overview of Government Spent Fuel Management “base case” Outline of work carried out with NDA to identify opportunities and feasibility of optimising the “base case” Initial results of preliminary scoping studies with NDA

60 years operation would generate a total of approximately 3,400 assemblies per EPR, including time for planned outages Each Spent Fuel Assembly contains approximately 530kg Uranium A Single EPR will produce approximately 1800tHM over 60 years of operation Spent Fuel Generation

RWMD assumptions related to New Build Spent Fuel Inventory RWMD will publish a Disposal System Safety Case. This will provide safety arguments supported by illustrative disposal concepts for three geological environments. The DSSC considers the MRWS Baseline Inventory and an upper inventory scenario which includes wastes and SF arising from a new nuclear build power programme The upper inventory scenario assumes construction of four AP1000 and four UK EPR corresponding to a generating capacity of 10 GW(e) which leads to an inventory of 13,000tHM of spent fuel (assumed 60 year operating lives) The illustrative disposal concepts assume use of high integrity disposal canisters (each holding four SFA) The DSSC recognises that the disposal concepts will not be chosen until future stages

The Spent Fuel Management Case Base Cooling in reactor fuel pool 2-10 yrs Transfer to on-site Spent Fuel Interim Storage Facility Store for around 100 years post discharge from reactor for temperatures to fall to meet GDF temperature constraints of bentonite buffer material Transfer to an encapsulation facility Encapsulation of long-stored fuel in KBS3 copper containers (maximum 4 fuel assemblies) Transfer to GDF for disposal (new-build emplacement after c.2130) Spent Fuel removed from reactor Assemblies transferred to reactor fuel pool Underwater storage of spent fuel in reactor fuel pool for initial cooling On-site Spent Fuel Interim Storage Facility Off-Site Geological Disposal Facility Spent FuelSpent Fuel Interim Storage Spent Fuel Transfer Spent Fuel EncapsulationFinal Disposal Reactor fuel pool Transfer of spent fuel to Interim Storage Facility Spent fuel encapsulation facility Encapsulation of spent fuel for disposal Initial Spent Fuel Cooling SFA loaded into transport flasks for transfer to encapsulation plant. Spent Fuel stored for period of up to 100years Transport to GDF

Optimisation of Base Case Current strategy safe, practical and deliverable Opportunities to optimise certain aspects –Storage periods –Storage Arrangements –Encapsulation facility/facilities –Optimisation of current reference disposal conceptual design –Consideration of other disposal concepts –ILW Management – Scheduling NDA RWMD was contracted by NIA to identify issues and options that could result in opportunities for optimisation

Working with NDA-RWMD RWMD has undertaken work commissioned and fully funded by the Nuclear Industry Association Scope: –Investigate the feasibility of and issues associated with storage and encapsulation plants for spent fuel –Investigate issues with alternative transport and disposal package types –Identify issues and options that could result in the optimisation of the GDF concept to meet the characteristics of both legacy and new build waste –Investigate the potential benefits of alternative disposal concepts

RWMD Report Published November 2010 NDA website cuments/upload/Geologic al-Disposal-Feasibility- studies-exploring- options-for-spent-fuel- from-new-nuclear-power- stations-November pdfhttp:// cuments/upload/Geologic al-Disposal-Feasibility- studies-exploring- options-for-spent-fuel- from-new-nuclear-power- stations-November pdf

Spent Fuel Interim Storage period RWMD initial disposability assessment indicated cooling period of the order of 100 years required before disposal Based on temperature constraint on bentonite backfill New work indicates above ground storage period could be reduced to around 50 years by judicious mixing of long cooled and short cooled fuel Other feasible options which also permit earlier emplacement include: –Smaller diameter canisters with reduced heat load, or –Undertake research on the temperature limit in the bentonite buffer

Fuel Handling and Centralised Storage (1) Base case assumes one store per site and on- site storage post decommissioning until GDF is available and fuel is sufficiently cooled Advantages that each site manages its own waste Disadvantage in duplication of facilities each of which will require safety and security infrastructure Centralised storage could reduce overall costs and allow complete early clearance of multiple sites

Fuel Handling and Centralised Storage (2)

Encapsulation Encapsulation of spent fuel into form suitable for final disposal Base case assumes: –Use of copper canister concept –Packaging at reactor site with transport to GDF Encapsulation plant is complex and expensive facility Swedish concept assumes single encapsulation plant and centralised storage UK legacy fuel also requires encapsulation Opportunities to share facility between legacy and new build or between new build operators

Alternative Disposal Pakages Use of alternative containers in reference concept GDF Larger casks with more SFA = higher thermal loading Considers viability of a single Multi-Purpose Container (MPC) for storage – transport – disposal Could remove need for repackaging and additional handling of fuel Existing designs of MPC would require significant up rating and redesign of GDF infrastructure and handling systems Conceptually a smaller MPC could be designed for increased compatibility with geological disposal and UK transport infrastructure Further work needed to justify early sealing of SF in the container and ability to make future transport and disposal safety cases

Alternative Disposal Concepts Consideration of alternative disposal concepts In-tunnel Axial Concept – more suitable for larger containers as no rotation of container RWMD has identified practical options for emplacement of MPC type containers (e.g. NUMO (Japan) cavern system) –Suited to MPC package –Potential for earlier emplacement due to delayed buffer backfill

Next Steps NIA working group to consider scope of further research Engagement with Government where implications for Managing Radioactive Waste Safely process Operators to engage with local communities on site specific waste proposals for new nuclear power stations