Rajasthan State Road Development & Construction Corporation Ltd.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
PDAs Accept Context-Free Languages
RSRDC UNIT-IV, JAIPUR. ORGANISATION CHART OF RSRDC UNIT –IV, JAIPUR R.E. Sh.S.S. Vijay ARE Sh. R.K. Vijay ARE Sh.M.K. Saini ARE Sh. Rajiv Sethi ARE Sh.
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 26-CO, p.795. Slide 2Fig 26-1, p.796 Slide 3Fig 26-2, p.797.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Sequential Logic Design
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
2.11.
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Regression with Panel Data
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
LN-251 SimINERTIAL Performance
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Subtraction: Adding UP
: 3 00.
5 minutes.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
2.4 Bases de Dados Estudo de Caso. Caso: Caixa Eletrônico Caixa Eletrônico com acesso à Base de Dados; Cada cliente possui:  Um número de cliente  Uma.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
& dding ubtracting ractions.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
RSRDC UNIT - KOTA. ORGANISATION CHART OF RSRDC - UNIT KOTA.
Presentation transcript:

Rajasthan State Road Development & Construction Corporation Ltd. Unit-II, Bikaner C-72, Sadul Ganj, Bikaner

ORGANISATIONAL CHART OF RSRDCC UNIT-II BIKANER Resident Engineer Sh. R. K.Mathur A. A. O. Sh. B. L. Darak ARE Sh. S. M. Swami ARE Sh. Sunil Gahlot ARE Sh. Sanjay Golwal ARE Sh. S. P. Mathur ARE Sh. M.G. Shrimali

Financial Work Load in Unit-II, Bikaner S. No. Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work ARE – I Sh. S. M. Swami 1 Laying Sewer Line for Police Qtrs. Police Dept. 38.16 Lacs 4.02 Lacs 34.14 Lacs 2 Water Supply arrangement for Police Qtrs. 53.18 Lacs 24.74 Lacs 28.44 Lacs 3 Const. of LSQ-II Police Line, Bikaner 142.72 Lacs 103.13 Lacs 18.87 Lacs 4 Const of LSQ-IV Police Line, Bikaner 220.24 Lacs 138.87 Lacs 48.33 Lacs 5 Const. of 40 Nos. LSQ X RAC, Bikaner 124.24 Lacs 91.91 Lacs 13.69 Lacs ARE – II Sh Sunil Gahlot Const. of LSQ & USQ at X RAC, Bikaner 469.22 Lacs 353.18 Lacs 45.66 Lacs ARE – III Sh. Sanjay Golwal Const. of LSQ III Police Line, Bikaner 191.94 Lacs 137.58 Lacs 25.56 Lacs Protection work on New Bikaner Bye Pass BOT Project 45.69 Lacs 24.81 Lacs 20.88 Lacs Const. of retaining wall on New Bikaner Bye Pass 34.65 Lacs ARE – III Sh. S. P. Mathur Const. of LSQ & USQ at PMDS & JNV Bikaner 123.10 Lacs 103.10 Lacs 7.00 Lacs Const. of 2 Nos. LSQ at JNV & 8 Nos. LSQ at PMDS 29.48 Lacs 23.16 Lacs 6.32 Lacs Const. of Bye Pass Zone I km 0/0 to 13/0 496.83 Lacs 477.08 Lacs 19.75 ARE – V Sh. M.G. Shrimali Const. Bikaner Bye Pass km 13/0 to 26/0 Zone II 496.92 Lacs 460.38 Lacs 36.54 Lacs Supply of Grit to Hot Mix Plant for Bye Pass 186.00 Lacs 164.00 Lacs 22.00 Lacs Transportation of Bitumen of Bikaner Bye Pass 52.00 Lacs 48.00 Lacs 4.00 Lacs 4. Road Furniture work 86.00 Lacs 00.00

Proposed new works RSRDCC Unit-II, bikaner S. No. Name of work Client Department Mode Actual/Tender Estimated Cost Remarks 1. Construction of Library Block, Academic Block (Science) & Compound Wall in University of Bikaner Maharaja Gangasingh University, Actual Plus 467.00 Lacs MOU Signed Drawings Submitted for Approval 2. Building of Kendriya Shakari Bank at Hanumangarh, Junction Co-operative Bank 325.00 Client department has principally agreed & further negotiations are in process.

Important Works Completed by RSRDCC Unit-II, Bikaner During last 5 Year’s 1 Construction of Married accommodation Project For OR’s & JCO’s at Sriganganagar & Suratgarh. [Tendered work.] Completion Cost Rs. 2814.00 Lacs. 2 Stregthening & improvement of Hanumangarh Pillibanga Suratgarh road including ROB at LC 71 A at Hanumangarh Junction. Completion Cost Rs. 2736.43 Lacs. 3 Construction of V.C. Secretariat, Examination Block, Administrative Block and Guest Housing Buildings in University of Bikaner. Completion Cost Rs. 564.00 Lacs. 4 Construction of Internal road, Entrance Plaza, Compound Wall, Water Supply arrangements and External Electrification Work in the premises of University of Bikaner. Completion Cost Rs. 179.00 Lacs. 5 Construction of 5000 MT Godown, Office building, Compound Wall, Internal road for RAJFED at Sriganganagar. Completion Cost Rs. 121.00 Lacs. 6 Widening and Strengthening of Sriganganagar Hanumangarh road km 0/500 to 56/0 [BOT Project ] Tendered Work. Completion Cost Rs. 1594.50 Lacs.

198 OR’s MAP Package III At Sri-Ganganagar Completion Cost Rs. 1081.79 Lacs.

ROB at LC 71A at Hanumangarh Junction Completion Cost Rs. 475.00 Lacs Foundation Stone laid by Hon’ble PWM on 27.5.2005 Inaugurated by Hon’le Ex-Minister on 20.9.2008

V.C. Secreterait & Guest House, UOB, Bikaner Completion Cost Rs. 195.93 Lacs Foundation Stone laid by Hon’ble Governor on 24.4.2005 Inaugurated by Hon’ble Chief Minister on 14.8.2008

Entrance Plaza & Devlopment Works in the premises of University of Bikaner Completion Cost Rs. 179.00 Lacs

Godown 5000 MT Capacity for RAJFED at RIICO Sriganganagar. Completion Cost Rs. 121.00 Lacs

POLICE HOUSING SCHEME No. of Quarter : LSQ 156 nos., USQ 3 nos. Total Cost : 737.76 Lacs Location : Xth RAC, Bikaner Date of Start : 3.3.2008 Stipulated Date of Completion : 2.2.2009 Expenditure till Date : 611.19 Lacs Likely Completion Date : December, 2009

POLICE HOUSING SCHEME No. of Quarter : 40 nos. LSQ Total Cost : 185.60 Lacs Location : Xth RAC, Bikaner Date of Start : 13.05.2008 Stipulated Date of Completion : 12.04.2009 Expenditure till Date : 156.68 Lacs Likely Completion Date : December, 2009

POLICE HOUSING SCHEME No. of Quarter : 34nos. LSQ & 6nos. USQ Total Cost : 185.60 Lacs Location : PMDS and JNV Police Station Date of Start : 03.03.2008 Stipulated Date of Completion : 02.02.2009 Expenditure till Date : 172.77 Lacs Likely Completion Date : December, 2009

POLICE HOUSING SCHEME No. of Quarter : 10 Nos. LSQ Total Cost : 46.40 Lacs Location : PMDS and JNV Police Station Date of Start : 11.10.2008 Stipulated Date of Completion : 10.07.2009 Expenditure till Date : 39.38 Lacs Likely Completion Date : December, 2009

POLICE HOUSING SCHEME No. of Quarter : 48 Nos. LSQ Total Cost : 222.72 Lacs Location : Police Line, Bikaner Date of Start : 19.04.2008 Stipulated Date of Completion : 18.03.2009 Expenditure till Date : 179.68 Lacs Likely Completion Date : December, 2009

POLICE HOUSING SCHEME No. of Quarter : 60 Nos. LSQ Total Cost : 278.40 Lacs Location : Police Line, Bikaner Date of Start : 11.10.2008 Stipulated Date of Completion : 10.07.2009 Expenditure till Date : 234.70 Lacs Likely Completion Date : Jan., 2009

POLICE HOUSING SCHEME No. of Quarter : 72 Nos. LSQ Total Cost : 334.08 Lacs Location : Police Line, Bikaner Date of Start : 13.05.2008 Stipulated Date of Completion : 12.04.2009 Expenditure till Date : 251.05 Lacs Likely Completion Date : Jan., 2009

POLICE HOUSING SCHEME No. of Quarter : P&L&J of Sewer Line for Police Housing Project Total Cost : 38.17 Lacs Location : Police Housing Premises, Bikaner Date of Start : 07.06.2009 Stipulated Date of Completion : 06.10.2009 Expenditure till Date : 4.39 Lacs Likely Completion Date : Dec., 2009 Bottlenecks if Any : Permission to Lay Line and connect with the existing sewer system of Karni Nagar Colony was accorded in Sept. 2009 by Nagar Nigam after great pursuance.

POLICE HOUSING SCHEME No. of Quarter : Const. of OHSR, CWR & P&L&J of Distribution System Total Cost : 53.19 Lacs Location : Police Housing Premises, Bikaner Date of Start : 07.06.2009 Stipulated Date of Completion : 06.12.2009 Expenditure till Date : 26.98 Lacs Likely Completion Date : Dec., 2009 Bottlenecks if Any : PHED department has not yet approved the scheme of Rs.81.55 Lacs for providing water supply to the Police Housing Premises.

Const. of New Bikaner Bye Pass BOT Project Name of Work : Const. of New Bikaner Bye-Pass connecting NH-15 Bikaner-Jaisalmer Road to NH-15 Bikaner- Sriganganagar road Km 0/0 to 26/0. Total Cost : 4169.93 Lacs. Off Take Point : Km 0/0 of Bye Pass is at NH-15 Bikaner- Jaisalmer road in km 17/500 End Point : Km 26/0 of Bye Pass meets NH-15 Bikaner- Sri –Ganganagar road in km 14/600 Date of Start : 28.7.2009 Stipulated Date of Completion : 31.3.2010 Expenditure till Date : Rs.2211.61 Lacs. Likely Completion date : 15.1.2009

Bituminous Concrete work in Progress in km 0/0 to 1/0 of Bye Pass

Rotary at SH-03 Chhattargarh Road Km 10/775 of Bye Pass

Bikaner Bye Pass Km 1/0

Toll Plaza in Km 0/0 to 1/0 of Bikaner Bye Pass

THANK YOU