Innovative Approaches to Wildlife/Highway Interactions The “Seven Dwarfs”

Slides:



Advertisements
Similar presentations
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Advertisements

Environmental Project Commitments The Alberta Experience
MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING, MONITORING, AND RECLAIMING OPERATIONS MINING OPERATIONS ON NATIONAL FOREST SYSTEM LAND APPROVING,
The Georgia Initiative GDOT/GUCC Clear Roadside Program.
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Earth Disturbance Programs  Chapter 102 –Erosion Control & NPDES Permits  Chapter 105-General Permits  Dirt & Gravel Roads Program.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Wetland Assessment Methods FHWA Needs. Laws and Regulations National Environmental Policy Act Section 404 CWA Regulatory Program Executive Order 11990,
Environmental Legislation and Agencies Review. Sets a time table for phasing out ozone- depleting substances.
Regulatory Body MODIFIED Day 8 – Lecture 3.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Oregon Jobs and Transportation Act Section 18 External Stakeholder Meetings.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Name that Legislatio n! Review. Sets a time table for phasing out ozone- depleting substances.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
INYO NATIONAL FOREST - TRAVEL ANALYSIS PROCESS Public Meeting – April 21, 2015.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Section 4(f)/6(f) Categorical Exclusion Training Class.
Environmental Commitments/Tracking. Environmental Commitments Federal Agencies Shall –Use all practicable means consistent with the requirements of.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Tunnelling underground space MSc Tunnelling & Underground Space Environmental management on site part 1.
Federal Lands Highway Commitment to Excellence Environmental Concerns with Estimating TEA/TUG Conference Portland, Maine October 2006 Jack Van Dop Eastern.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
Report On The Status Of The Remediation Of The Sonoma County Waste Tire Sites Board Meeting Agenda Item 4 February 18, 2004.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
LPA Program Federal-aid Issues for Local Agencies Mike Morrow – December 10, 2010.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
GOOD NEIGHBOR AGREEMENTS (AUTHORITY) MARCH 31, 2016.
Section 4(f) Categorical Exclusion Training Class.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Wetlands Focus Group. Responsibilities and Goals   Growth Managements Act (Chapter 163, FS) of 1985   Included the adoption of the State Comprehensive.
U.S. Fish and Wildlife Service Migratory Bird Program Conserving America’s Birds Addressing Migratory Birds in NEPA Migratory Bird Conservation for Federal.
Ferguson Slide Permanent Restoration Project
Draft Transportation Element September 6, 2017
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
National Environmental Policy Act of 1969 (NEPA)
Section 4(f) Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
INDOT Storm Water Management
Latin America and Caribbean Region
Presentation transcript:

Innovative Approaches to Wildlife/Highway Interactions The “Seven Dwarfs”

 Often overlooked highway project planning elements  May be outside ROW, so may be missed in NEPA  Elements require analysis, clearance, documentation, permits  Don’t delay consideration

The “Seven Dwarfs” 1.Borrow and Waste Sites/Material Balance 2.Contractor’s Staging Areas 3.Water for Construction 4.Access for Construction or Geotechnical Investigation

The “Seven Dwarfs” 5.Utility Placement or Replacement 6.Mitigation Projects 7.Impact of Outside Agencies and Direction

1. Borrow and Waste Sites  Material balance to handle large volumes of moved earth  Requires temporary or permanent storage location  NEPA analysis needs to include impacts to sites

2. Contractor’s Staging Areas- Issues  Large equipment needed for construction  May be large numbers of vehicles  Supplies may include trailers, culverts, gravel, construction materials  Need large areas of flat ground

2. Contractor’s Staging Areas- Things to Remember  Carefully choose and analyze staging area  Avoid placing adjacent to important wildlife areas  Have appropriate clearances  Include restoration plan

3. Water for Construction- Issues  Construction requires huge volumes of water  Up to 6 million gallons/day  Surface water can be readily depleted  Aquatic resources impacted

3. Water for Construction- Things to Remember  Carefully analyze withdrawal sites  Define and enforce maximum daily and seasonal withdrawal limits  Consider seasons of use and any seasonal impact on fish and wildlife  Place limited operating season on withdrawal site if necessary

4. Access for Construction or Geotechnical Investigation  May need to access future highway location with a temporary road  May be far different from future alignment  May be outside ROW  Detours may affect many acres if speed is retained

4. Access for Construction or Geotechnical Investigation  Don’t leave access roads out of NEPA investigation  Early consideration avoids construction delays  Determine mitigation for access roads when no longer needed (gates, removal)  Install barriers when open to restrict public access  Remember seasonal timing restrictions for sensitive wildlife areas

5. Utilities-Issues  Frequently co-located with highway  New placement may require different routings for each utility  Often located outside ROW  Clearances often needed for pole placement  Several companies may be involved

5. Utilities-- Things to Remember  Realignment offers chance to reassess  Consider underground utility placement  Determine responsibility and level of maintenance for any closed roads  Don’t forget to include all utilities in decisions

6. Mitigation Projects- Issues  Mitigation also requires NEPA analysis and clearances  May be far outside ROW  Usually interagency, long-term agreements  May not be completely funded from highway project  Monitoring is strongly recommended

6. Mitigation-Things to Remember  Determine who is responsible for planning, funding and implementation  Document in MOU (this helps in case of changes in personnel too)  Develop monitoring plan prior to issuance of Letter of Consent

7. Impact of Outside Agencies Issues  Failure to plan for and obtain necessary permits causes project delays  Consider all regulations, permits needed, FWS consultation requirements  State DOT and FHWA interpret NEPA differently, particularly on timing  Rapid pace can allow details to ‘fall through the cracks’

7. Impact of Outside Agencies Things to Remember  It is Forest Service’s responsibility to ensure all applicable laws, regulation and policy are followed  Involve necessary specialists by informing them of projects early and often  Do not issue Letter of Consent without ensuring MOU enforcement of applicable environmental laws is followed