1 Ferguson Slide Permanent Restoration Project

2 Where are we today? Limestone Salamander legislation (AB1973)
Forest Service Analysis for Impacts to Wild and Scenic Merced River Alternatives have been dropped from further consideration Draft Environmental Document

3 Limestone Salamander Legislation AB 1973
Signed into Law on July 13, 2012 Allows the California Department of Fish and Wildlife to issue a 2081 (Incidental Take Permit) for the Limestone Salamander. Sunsets on January 1, 2016 which requires us to begin Construction by this date.

4 Forest Service Wild and Scenic River assessment
All Bridge Alternatives would have Temporary and Long Term Impacts to Wild and Scenic River Tunnel (T-3) and Rockshed (R) Alternatives would not have Long Term Impacts to Wild and Scenic River Temporary Bridge permit expires in 2018

5 Alternatives Removed from Consideration
Alternatives were eliminated because of: Adverse Long Term impact to the Wild and Scenic River Adverse Impacts to 4(f) Resources (Incline Road Trail & Recreational Uses of the Merced River). Consensus for this approach was received from all participating Federal, State and Local agencies

6 Alternatives Moving Forward

7 Alternatives T3 and R

8 Photo Simulation Rock Shed
Stays on current alignment

9 Photo Simulation Tunnel

10 Project Schedule Circulate Draft EIR/EIS – Spring 2013
Public Hearing – Late Spring 2013 Final EIR/EIS – Fall 2013 Design Complete – Summer 2015 Begin Construction – Late 2015