Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July.

Slides:



Advertisements
Similar presentations
Measuring a Nation’s Income
Advertisements

Copyright © 2002 Pearson Education, Inc. Slide 1.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
The Midwest ISO from a Transmission Owner Perspective.
Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.
NTTG Report to TEPPC BiennialTransmission Plan.
Northern Tier Transmission Group SPG Report to TEPPC June 17, 2010 Denver To ensure efficient, effective, coordinated use & expansion of the members transmission.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
0 - 0.
Addition Facts
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Slides prepared by JOHN LOUCKS St. Edward’s University.
Effective Rate of Protection
An Introduction to International Economics
AN INTRODUCTION TO THE MIDWEST ISO By Bill Malcolm Manager-State Regulatory Affairs Pierre, South Dakota June 9, 2006.
A Key to Economic Analysis
CHAPTER 4 MEASURES OF LEVERAGE Presenter’s name Presenter’s title dd Month yyyy.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
Congestion Management Settlement Credits December, 2002.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
EE 369 POWER SYSTEM ANALYSIS
Montana Ambassadors Helena, Montana February 25, 2011.
Rocky Mountain Area Transmission Study RMATS Economics Reference Cases Economic Comparisons Distribution of Economic Gains and Losses RMATS Steering Committee.
Rocky Mountain Area Transmission Study Transmission Projects Recommendations to RMATS Steering Committee June 9, 2004.
2013 Alternative Transmission Development Robert H. Easton March 17, 2004 RMATS Stakeholder Meeting.
Rocky Mountain Area Transmission Study Connecting the Region Today for the Energy Needs of the Future Rocky Mountain Area Transmission Study Recommendations.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
RELIABILITY and RENEWABLES: Two Case Studies Using the SuperOPF Tim Mount Department of Applied Economics and Management Cornell University
Production Cost Model Fundamentals
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Network Customer Meeting Access Metric Update November 16, 2006.
ECE 476 Power System Analysis Lecture 6: Power System Operations, Transmission Line Parameters Prof. Tom Overbye Dept. of Electrical and Computer Engineering.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Rocky Mountain Area Transmission Study Steering Committee Meeting January 13, 2003 RAWG proposed Alternatives.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
Rocky Mountain Area Transmission Study Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration.
Rocky Mountain States Sub-Regional Transmission Study December 9, 2003 Generation Additions Strawman.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Base Case Rocky Mountain Area Transmission Study Presentation to Steering Committee February 5, 2004.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
Rocky Mountain Area Transmission Study Overall Economics of Alternatives Steering Committee Meeting April 29, SLC.
NW Loss of Load Probability James Gall Power Supply Analyst
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Houston Import Study Update
4/23/2018 Steering Committee Meeting 2013 Case Alt 1 & 2 - Iteration 2 – Test Transmission Solutions Alt 3 & 4 – Iteration 1 - Define Congestion.
2017 Integrated Resource Plan
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
Western Electricity Coordinating Council
Naughton RAS (Southwest Wyoming Generation Tripping Scheme) – LAPS
PDWG Validation of the 2028 ADS PCM V1.0
Presentation transcript:

Rocky Mountain Area Transmission Study RMATS Economics Economic Comparisons Preliminary: Distribution of Gains and Losses RMATS Steering Committee July 15, 2004

2 RMATS Recommendations Modeling since Steering Committee call  Refined the resource assumptions used in project- specific economics Removed wind resources associated with MT Upgrades and WY/CO Expansion projects when valuing stand-alone projects  Modified interface capacities for Bridger West, West of Naughton, Path C and TOT 4A  Preliminary analysis: Distribution of economic gains and losses  Preliminary analysis: Implications for state tax revenues

3 RMATS Recommendations Comparative Economics

4 RMATS Recommendations Comparative Economics

5 RMATS Recommendations Distribution of gains and losses  A first look at spatial distribution of net savings/costs  Key driver: LMPs. Also loads, generation, and fuel/other VOM  As modeled in ABB MS for 2013 test year  Results: geographic, by load and generator category  Substantially greater net benefits for Rocky Mountain states

6 RMATS Recommendations Background info... Locational Marginal Prices (LMP)  LMP: Represents the cost or savings from supplying the next MW at a given node (bus) on the grid  If there were no transmission losses or constraints (perfect liquidity), all LMP’s would be equal and they would be the same as the cost of the unit on margin  In the case of a low cost generator with no available transmission (bottled up), the LMP would be that generator’s marginal cost  LMPs are transitory, arguably insufficient for predicting where benefits will fall Driven by congestion, loads, generation, gas and other fuel prices

7 RMATS Recommendations Why are Load Savings and Generator Gross Margin so different?  In concept, if there were no losses or congestion (perfect transmission liquidity), then LMPs at any given hour would be the same across the Western Interconnect  Load costs and generator revenues would be the same for the system as a whole, but different by area because load and generation quantities would be different Load costs: the sum of hourly loads X hourly LMP Generator revenues: the sum of hourly generation X hourly LMP Generator gross margin: generator revenues less annual fuel & other VOM  Congestion leads to changes in the type and location of plants that are dispatched Changes generation (MWh) Changes fuel costs  This in turn affects LMPs - the price paid by load and the price received by generators Generation (MW) Load (MW) t q LMP t p For a given area, excludes import/exports: No Constraints Assumes that load is not sensitive to price (LMP), no price elasticity Generation (MW) Load (MW) t q LMP t p For a given area, excludes import/exports: With Constraints

8 RMATS Recommendations Distribution of Economic Gains & Losses Recommendation 1 Reflects the changes in load cost and generator gross margin between the Reference Case and Recommendation 1. This distribution assumes that pricing is on an hourly, LMP basis. Reflects fuel and other VOM modeling, and does not include capital & fixed O&M costs Load Cost is hourly demand (MWh) at each load node x hourly LMP ($), summed for 2013 Generator Gross Margin is hourly generation (MWh) at generation node x hourly LMP, summed for 2013 (generator revenue), less annual fuel & other VOM costs NOTE: Idaho & Montana state totals do no include areas covered in the Northwest Power Pool

9 RMATS Recommendations Distribution of Economic Gains & Losses Recommendation 2 Reflects the changes in load cost and generator gross margin between the Reference Case and Recommendation 2. This distribution assumes that pricing is on an hourly, LMP basis. Reflects fuel and other VOM modeling, and does not include capital & fixed O&M costs Load Cost is hourly demand (MWh) at each load node x hourly LMP ($), summed for 2013 Generator Gross Margin is hourly generation (MWh) at generation node x hourly LMP, summed for 2013, less annual fuel and other VOM costs NOTE: Idaho & Montana state totals do no include areas covered in the Northwest Power Pool

10 RMATS Recommendations Distribution of Economic Gains & Losses State summary NOTE: Idaho & Montana state totals do no include areas covered in the Northwest Power Pool

11 RMATS Recommendations Distribution of Economic Gains & Losses Recommendation 1 & 2

Rocky Mountain Area Transmission Study Appendix

13 RMATS Recommendations Production Cost (VOM) Comparison avg

14 RMATS Recommendations Antelope Mine Dave Johnston LRS Cheyenne Tap Ault Green Valley Miners Jim Bridger Naughton Ben Lomond Midpoint Recommendation 1 Transmission Projects Broadview Colstrip Added Series Compensation Only Taft Montana Upgrades Bridger Expansion New WY- CO lines Treasureton Garrison Townsend Borah West Path C West of Naughton West of Bridger Black Hills to C. Wyoming C Wyoming to LRS TOT 3 TOT 7 TOT 4A West of Colstrip West of Broadview Montana to NW 500 Wind 210 Gas500 Coal 500 Wind 1150 Wind 700 Coal 359 Coal 50 Wind 250 Coal 280 Wind 125 Wind 575 Coal 100 Wind 575 Coal 140 Gas 250 Wind Added 345 kV Line Modified Interface Added Resource Bridger E

15 RMATS Recommendations Antelope Mine Dave Johnston LRS Cheyenne Tap Ault Green Valley Miners Jim Bridger Naughton Ben Lomond Midpoint Recommendation 1 Transmission Projects Montana Upgrades (less gray) Broadview Colstrip Added Series Compensation Only Taft Montana Upgrades Bridger Expansion New WY- CO lines Treasureton Existing Ben Lomond to Borah 345kV is now looped in at Treasureton Amps phase shifter, Flaming Gorge transformer, Midpoint to Boise 230kV are included in all runs Garrison Townsend Borah West Path C West of Naughton West of Bridger Black Hills to C. Wyoming C Wyoming to LRS TOT 3 TOT 7 TOT 4A West of Colstrip West of Broadview Montana to NW 500 Wind 210 Gas500 Coal 500 Wind 1150 Wind 700 Coal 359 Coal 50 Wind 250 Coal 280 Wind 125 Wind 575 Coal 100 Wind 575 Coal 140 Gas 250 Wind Added 345 kV Line Modified Interface Added Resource

16 RMATS Recommendations Antelope Mine Dave Johnston LRS Cheyenne Tap Ault Green Valley Miners Jim Bridger Naughton Ben Lomond Midpoint Broadview Colstrip Added Series Compensation Only Taft Montana Upgrades Bridger Expansion New WY- CO lines Treasureton Existing Ben Lomond to Borah 345kV is now looped in at Treasureton Amps phase shifter, Flaming Gorge transformer, Midpoint to Boise 230kV are included in all runs Garrison Townsend Borah West Path C West of Naughton West of Bridger Black Hills to C. Wyoming C Wyoming to LRS TOT 3 TOT 7 TOT 4A West of Colstrip West of Broadview Montana to NW 500 Wind 210 Gas500 Coal 500 Wind 1150 Wind 700 Coal 359 Coal 50 Wind 250 Coal 280 Wind 125 Wind 575 Coal 100 Wind 575 Coal 140 Gas 250 Wind Added 345 kV Line Modified Interface Added Resource Recommendation 1 Transmission Projects Bridger Expansion (less gray)

17 RMATS Recommendations Antelope Mine Dave Johnston LRS Cheyenne Tap Ault Green Valley Miners Jim Bridger Naughton Ben Lomond Midpoint Broadview Colstrip Added Series Compensation Only Taft Montana Upgrades Bridger Expansion New WY- CO lines Treasureton Existing Ben Lomond to Borah 345kV is now looped in at Treasureton Amps phase shifter, Flaming Gorge transformer, Midpoint to Boise 230kV are included in all runs Garrison Townsend Borah West Path C West of Naughton West of Bridger Black Hills to C. Wyoming C Wyoming to LRS TOT 3 TOT 7 TOT 4A West of Colstrip West of Broadview Montana to NW 500 Wind 210 Gas500 Coal 500 Wind 1150 Wind 700 Coal 359 Coal 50 Wind 250 Coal 280 Wind 125 Wind 575 Coal 100 Wind 575 Coal 140 Gas 250 Wind Added 345 kV Line Modified Interface Added Resource Recommendation 1 Transmission Projects WY-CO Expansion (less gray)

18 RMATS Recommendations Area Production Costs (VOM) Recommendation 1

19 RMATS Recommendations Interface Performance Recommendation 1

20 RMATS Recommendations Capacity Factors Recommendation 1