LP Seminar – Madrid – 20 October 2008 EUROPEAN REGIONAL DEVELOPMENT FUND REPORTING & MONITORING PROCEDURES Lead Partner Seminar Madrid, 20 October 2008.

Slides:



Advertisements
Similar presentations
INTERREG IVC Introduction to programme & application process
Advertisements

Chapter 5 Transfer of Training
1 Brussels, 18 October 2007 Erwin Siweris INTERREG IIIC/IVC JTS Lille, France.
> Contents 1 10/12/2007, Lead applicant seminar, Katowice, Poland EUROPEAN REGIONAL DEVELOPMENT FUND Preparing an INTERREG IVC application: Financial and.
1 10/12/ 2007 – Katowice, Poland EUROPEAN REGIONAL DEVELOPMENT FUND Preparing an INTERREG IVC application: Project Activity Benoît DALBERT, Project Officer,
1 Programming period Strategy and Operational programmes DG REGIO – Unit B.3.
Legal Basis for Management and Control Systems in INTERREG III programmes BSR INTERREG III B Joint Secretariat Matthias Heinicke Seminar on Financial Management.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
INTERREG III C: Past experiences and future expectations on Interregional Co-operation Brussels, Thomas Wobben Verbindungsbüro des Landes Sachsen-Anhalt.
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
2 Slovenia Signed Contract of Confidence for the period Compliance assessment for one programme for the new period Experience of a Certifying.
The Implementation Structure DG AGRI, October 2005
THE CERTIFYING AUTHORITY
Final Report Anton Schrag REGIO D1
The Managing Authority –Keystone of the Control System
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
“Train the trainers” seminar
Regional Policy Cohesion Policy Legal Package State of play Porto, 29th April 2013 Vicente RODRIGUEZ SAEZ Deputy Head of Unit DG REGIO.D.1 Transnational.
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 SEVENTEENTH MEETING OF THE EXPERT GROUP ON.
Click to edit Master title style 1 In the run-up to closure Main tasks for managing authorities, paying authorities and winding-up bodies European Commission.
Financial Management and Control Annual Meeting of ISPA PARTNERS 2003 Preparation for post-accession Management of Community Funds : Nicholas Martyn Regional.
European Union Cohesion Policy
WELCOME! Agenda of the workshop
PRESAGE CTE FINANCIAL MANAGEMENT AND REPORTING PROCESURES
Addition Facts
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Subsidy Contract Lead Partner seminar October 2008, Riga Arina Andreičika Managing Authority
Maurizio Angeli Felicioni ANCI Lazio - National Association of the Italian Municipalities Lazio Main rules for the project implementation: A brief overview.
Communication, Exchange and dissemination of good practices.
PIC INTERREG IIIC Sud “Robinwood” Mr. Paolo Forno Financial Manager Subprojects Administrative procedures.
Maritime projects Lead partners seminar 27 th May 2014.
Addition 1’s to 20.
Week 1.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
1 Working meeting Warsaw, :00 – 13:00 – WORKING MEETING Progress of the project: activities, budget changes – LP-Part Project schedule & plan.
Financial Management and Auditing Monitoring by the JTS 3 rd round operations Rostock, Elise Oukka.
Centurio Partner Regions' Meeting 5 May AER CENTURIO CONFERENCE Centurio Partner Regions’ Meeting 5 May 2005 Azores.
Latvia–Lithuania Cross Border Cooperation Programme 2007–2013 WORKSHOP “How to prepare good application?” Joint Technical Secretariat 3rd.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
LP Seminar – Madrid – EUROPEAN REGIONAL DEVELOPMENT FUND FINANCIAL REPORTING Lead Partner Seminar Madrid, 20 October 2008 Petra Geitner Senior.
Part-financed by the European Union European Regional Development Fund and European Neighbourhood and Partnership Instrument Activity reporting Baltic.
INTERREG IIIB PROGRAMME “ALPINE SPACE“ FORALPS kick-off meeting March 10th & 11th, 2005 Trento (I)
Green Partnerships Local Partnerships for Greener Cities and Regions 1st Reporting /Presage Other administrative issues Portugal, 8-10 July 2013.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Project monitoring.
Project implementation, changes, reporting Edmunds Sniķeris Joint Technical Secretariat 16 April 2012, Kuldīga.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
Part-financed by the European Union Project implementation and monitoring: What is good to know when applying? Joint Technical Secretariat Lead Applicant.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Northern Periphery Programme Advice to Lead partners for final reports Lead Partner Seminar 18th September 2013 Scandic Hotel, Skellefteå, Sweden.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
INTERREG IIIB PROGRAMME “ALPINE SPACE“ ALPTER Reporting obligations and Financial control.
Action 12:Internal Monitoring BMW Regional Assembly.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
GROW Conference 20 June 2007 Silke Brocks Project Officer JTS INTERREG IIIC West, Lille (F) Main achievements of the INTERREG IIIC programme Insight into.
3 rd Financial Managers Seminar Brussels 19 May 2010 Financial Reporting Procedure.
INTERREG III B CADSES Neighbourhood Programme Administrative and Financial Aspects of Hydrocare Project Dr. Janka Strakova Project contact.
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
Transnational Working & Reporting Procedures. LP Seminar January 2013 Transnational Cooperation & Reporting Procedures I) Transnational cooperation: Definition.
Sharing solutions for better regional policies European Union | European Regional Development Fund Erika Fulgenzi Policy Officer | Interreg Europe JS
REPORTING THROUGH THE EMS
REPORTING THROUGH THE EMS
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
PROJECT MANUAL Galina Georgieva Project Officer
Advices to project developers
Reporting 25 April 2018.
Presentation transcript:

LP Seminar – Madrid – 20 October 2008 EUROPEAN REGIONAL DEVELOPMENT FUND REPORTING & MONITORING PROCEDURES Lead Partner Seminar Madrid, 20 October 2008 Elena Ferrario & Silke Brocks Project Officers

2 LP Seminar – Madrid – 20 October 2008 Reporting and monitoring procedures SUMMARY 1.Main features of the procedures 2.Monitoring activities

3 LP Seminar – Madrid – 20 October Main features of the procedures Reporting and monitoring procedures

4 LP Seminar – Madrid – 20 October 2008 MAIN FEATURES Monitoring based on: Application Form Reporting and monitoring documents: - Progress Report - Final Report - Request for changes forms Reporting and monitoring procedures

5 LP Seminar – Madrid – 20 October 2008 Reporting and monitoring procedures MAIN FEATURES Standard procedure: - JTS sends a pre-filled Excel file by to Lead Partner. Lead Partner returns the filled-in forms at given deadline by and by post. - Each project has two contact persons within the JTS (one Project Officer and one Finance Officer) which should be recipient of all communication.

6 LP Seminar – Madrid – 20 October 2008 Reporting and monitoring procedures Reporting timing The Progress Report:  has to be submitted for the first time: - on 1 April 2009 (at the latest) covering the reporting period from 19 September 2008 to 31 December 2008  has to be submitted every six-months to the JTS - on 1 October (at the latest) covering the reporting period from January to June - on 1 April (at the latest) covering the reporting period from July to December MAIN FEATURES

7 LP Seminar – Madrid – 20 October 2008 Reporting and monitoring procedures Reporting Timing  The Final Report has to be submitted within two months after the end date of the operation.  The Request for changes has to be submitted electronically within the deadline set by the JTS. MAIN FEATURES Timing for ERDF reimbursement  Depends on the quality of the Progress Reports (i.e. number of clarification requests)  From the JTS approval, payment should be executed within one month

8 LP Seminar – Madrid – 20 October 2008 Timeframe for reporting + monitoring (example) Submission of PR by LP to JTS (confirmed by LP controller) 31/12 End of reporting period 01/04 15/02 Submission of PP input to PR to LP (incl. PP controller’s confirmation) 01/05 Feedback on PR by JTS to LP, clarification request 22/05 Approval of PR + clarificati on by JTS 22/06 Payment by Certifying Authority ~ 4 weeks Reporting and monitoring procedures

9 LP Seminar – Madrid – 20 October 2008  Only in exceptional cases (e.g. partner or budget’s changes)  Request for changes forms includes: - an ‘Explanation’ form Information on the nature of the change and its justification - an Application Form for changes Specific version of the Application Form facilitating the monitoring of changes  Approval process: Mandate of the JTS/ MA from the Monitoring Committee to approve a certain number of changes e.g. withdrawal or replacement of up to 2 partners in a project Reporting and monitoring procedures MAIN FEATURES Request for changes

10 LP Seminar – Madrid – 20 October Monitoring activities Reporting and monitoring procedures

11 LP Seminar – Madrid – 20 October 2008 MONITORING ACTIVITIES Progress Report (PR) structure Two main parts: 1.General information on the project’s implementation - Summary of the activities & summary of the results - Partners’ involvement - Problems encountered / solutions found 2.Detailed reporting per Component including possible deviations This second part directly refers to the information provided in the Application Form (work plan and indicators) Reporting and monitoring procedures

12 LP Seminar – Madrid – 20 October 2008 MONITORING ACTIVITIES Points of attention for filling in the PR  To ensure that the report is self explanatory: annexes are for illustration only  To ensure that the report is understandable - even when the theme tackled is quite specialised, non specialists should be able to understand (‘capitalisation’ programme) - role of the LP to ‘digest’ and summarise information coming from the whole partnership  To pay a particular attention to the indicators (in IIIC, 80% of the clarification requests for the activities were related to indicators) Reporting and monitoring procedures

13 LP Seminar – Madrid – 20 October 2008 MONITORING ACTIVITIES Points of attention for filling in the PR  To be as precise as possible e.g. activities should always be described in detail with dates, location, content, participants, etc.  To provide ‘qualitative’ information Monitoring of outputs is important but not sufficient. Content related information is also crucial for capitalisation. Reporting and monitoring procedures

14 LP Seminar – Madrid – 20 October 2008 Core information to demonstrate the programme’s success  Figures reported should be realistic (better to be over cautious than over ambitious)  Each single indicator should be precisely justified  Meaning of each indicator should be carefully checked (Annex 3 of the Programme Manual) Points of attention concerning the indicators Reporting and monitoring procedures

15 LP Seminar – Madrid – 20 October 2008 MONITORING ACTIVITIES Points of attention concerning the indicators Examples of possible confusion  In principle, N° of interregional events organised to exchange experience does not include the Steering Group meetings  N° of participants in these events (output) ≠ N° of staff members with increased capacity (result)  N° of practices successfully transferred ≠ N° of regional/local policies improved Reporting and monitoring procedures

16 LP Seminar – Madrid – 20 October 2008 Their description should include:  Information on the deviation itself  a justification  a clarification on its consequence on the project’s implementation (e.g. on finances)  the solution proposed to face this deviation and avoid similar issues in the future Reporting and monitoring procedures Points of attention concerning the deviations

17 LP Seminar – Madrid – 20 October 2008 MONITORING ACTIVITIES Final advice TTo be proactive: do not wait for the Progress Report to inform the JTS on important issues Reporting and monitoring procedures

18 LP Seminar – Madrid – 20 October 2008 Thank you for your attention!