Assembly, May 2014 Oslo STATUS of WP 3 Wilhelm Petersen, Helmholtz-Zentrum Geesthacht

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Squares and Square Root WALK. Solve each problem REVIEW:
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
Project's financial status
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Essential Cell Biology
Weekly Attendance by Class w/e 6 th September 2013.
Energy Generation in Mitochondria and Chlorplasts
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
George PetihakisI HCMRI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 4 HARMONIZING OPERATION AND MAINTENANCE.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.
Presentation transcript:

Assembly, May 2014 Oslo STATUS of WP 3 Wilhelm Petersen, Helmholtz-Zentrum Geesthacht

GA, Oslo, May 2014, WP3 Status WP3: HARMONIZING TECHNOLOGICAL ASPECTS General Objectives: T o provide a common base for the operational use of FerryBoxes, gliders, fixed platforms along European coasts To review the current status of existing systems in operational use in European seas To define the best technical practices for compatible, robust and cost-effective systems To define procedures for harmonizing and merging quality assessed FerryBox and Fixed Platform data at regional (ROOS) level To define procedures and technological solutions for integration and testing of new sensors on these systems

GA, Oslo May 2014, WP3 Status - 3 WP3: CONTRIBUTIONS OF PARTNERS partners in total: 17 budget: ~550 T€ total personal month: 105

GA, Oslo May 2014, WP3 Status - 4 TASK LEADERS : Task 3.1 FerryBox: Syke (Seppo) Task 3.2 Glider:CSIC (Joaquin) Task 3.3. Fixed Platform: CEFAS (Rodney) ´Task 3.x.3 test & application of new sensors: HZG (Willi)

GA, Oslo, May 2014, WP3 Status - 5 WP 3.1 FERRYBOXES TASKS: 3.1.1: Review current status of existing FB systems (flow- through systems, sensors, quality control, data handling) 3.1.2: Best practice of FB systems (flow-through system, sensors, operation procedures, antifouling, control mechanisms, data handling) 3.1.3: Harmonization and merging quality assessed data from FB systems in ROOS regions 3.1.4: Test and integration of new sensors and best practices (tightly linked to WP10).

GA, Oslo May 2014, WP3 Status - 6 WP 3: STATUS TASK 3.1 FERRYBOX (FB) (responsible Seppo Kaitala): Task 3.1 FerryBox: 1 st JERICO FerryBox workshop (30-31 August 2011 at HZG) Report of 1 st JERICO FerryBox workshop (distributed Nov. 2011) Best practice of FB systems (T 3.1.2) (together with WP 4): first discussion in 1 st workshop, continued in joint WS (WP3 & 4) about Best Practice in Oct 2012 in Crete) -> forming of a working group, led by Kai Sorensen (NIVA) 2 nd FerryBox workshop in April 2013 in Helsinki  side meeting in Oslo May 2014 D 3.1. Report on current status of FerryBox (updated February 2014)

GA, Oslo May 2014, WP3 Status - 7 W. Petersen, BSH Treffen Aug WP3: Harmonizing technological aspects Task 3.1. Ferryboxes

GA, Oslo May 2014, WP3 Status - 8 D 3.1 Report on current status of FerryBoxes Content: 1.DOCUMENT DESCRIPTION3 2.EXECUTIVE SUMMARY4 3.INTRODUCTION5 4.MAIN REPORT9 4.1.Current Status of Ferrybox Operations (In European Waters)9 4.2.Advice on the planning and installation of a new FerryBox system Overview of potential advances resulting from the work of the JERICO project Data transfer Quality control29 ANNEXES AND REFERENCES34 References34 Annexe - Weblinks35

GA, Oslo May 2014, WP3 Status - 9 D3. 1 CURRENT STATUS FERRYBOXES

GA, Oslo, May 2014, WP3 Status - 10 WP 3.2 GLIDER TASKS : taskleader Joaquin (CSIC) Tasks: 3.2.1: Review current status of glider operation in Europe 3.2.2: Define the best technical practices for operation a fleet of glider Activities: –Workshop Gliders May 2012 joint meeting with GROOM* and EGO** (done) –JERICO Glider Questionnaire (done) –Questionnaire analysis (done) –Report on current status of glider observatories within Europe Deliverable 3.2 (done) * GROOM: Gliders for Research, Ocean Observation and Management, Start Oct. 2011, Duration 36 months ** EGO: Everyone’s Glider Observatories

GA, Oslo, May 2014, WP3 Status Task accomplished

GA, Oslo, May 2014, WP3 Status - 12 OUTLINE Deliverable 3.2: Current Status of Glider Observatories

GA, Oslo, May 2014, WP3 Status Distribution of European Glider Infrastructures DELIVERABLE 3.2: CURRENT STATUS OF GLIDER OBSERVATORIES

GA, Oslo, May 2014, WP3 Status DELIVERABLE 3.2: CURRENT STATUS OF GLIDER OBSERVATORIES Man-Power available to each European observatory compared to its individual fleet size

GA, Oslo, May 2014, WP3 Status - 15 WP 3.3 FIXED PLATFORM (FP) TASKS: Taskleader Rodney Forster 3.3.1: Review of the current status of all existing fixed observing sites  Deliverable 3.3. (done Aug 2013) 3.3.2: Workshop to identify elements of fixed platform technology which clearly represent best practice (WS in Rome April 2012 and Crete 2012) 3.3.3: Harmonization and merging quality assessed data from fixed platform systems in ROOSes 3.3.4: Comparison of new sensors and assessment of their applicability for fixed stations WP 10  D 3.4

GA, Oslo May 2014, WP3 Status

GA, Oslo May 2014, WP3 Status Deliverable D 3.3.: Current Status of Fixed Stations in Europe

GA, Oslo May 2014, WP3 Status - 18 Deliverable 3.3. Current Status of Fixed Stations in Europe all data are included in a database which will be updated regularly (CEFAS) Over 900 different fixed platform measuring sites mapped by region (NOOS, BOOS, IBI-ROOS and MOON) 463 sea level measuring stations, 446 sea temperature stations and 237 wave measuring stations were recorded in this survey very wide variety of instruments and platform types are in use at these sites. observing systems are predominantly located in the shallow coastal zone where the seabed is less than 50 m deep. 80 identifiable marine observing systems (with on average 11 nodes or measuring stations) 33 of the 80 systems belong to organizations who are partners in the JERICO project (= 39%)

GA, Oslo May 2014, WP3 Status Deliverable D 3.3.: Current Status of Fixed Stations in Europe

GA, Oslo May 2014, WP3 Status - 20 Deliverable D 3.3.: Current Status of Fixed Stations in Europe Jerico Fixed Platforms Sea temperature Jerico Fixed Platforms Nutrient

GA, Oslo May 2014, WP3 Status - 21

GA, Oslo May 2014, WP3 Status - 22 D 3.4. REPORT ON NEW SENSOR DEVELOPMENTS

GA, Oslo May 2014, WP3 Status - 23 Conclusion WP3 Tasks completed: –Most tasks in schedule or already completed Remaining tasks: –Best practise for all three kinds of platforms together with WP 4 (  D 4.4) FB and GL to a large extend already.available FP: very heterogeneous structures, some efforts necessary in task 3.3 (CEFAS), working group, lead: Carlos –3.1.3: Harmonization and merging quality assessed data from FB systems in ROOS regions (already common practice, data delivered to MyOcean) –3.3.3: Harmonization and merging quality assessed data from fixed platform systems in ROOS regions (NOOS, BOOS, MOON, IBI-ROOS): “This activity is cross-cutting through WP3 and will harmonize the outputs of fixed platforms with other systems such as FerryBox/ships of opportunity”. Test sites: North Sea (Cefas, HZG, Ifremer) and Adriatic (CNR). –3.1.4 und 3.3.4: Test and integration of new sensors and best practices (tightly linked to WP10).  D 3.4.

GA, Oslo May 2014, WP3 Status - 24 Conclusion WP3 (cont) Deliverables: completed: D 3.1 (FerryBox) D 3.2 (Glider) D 3.3 (Fixed Platforms) remaining: D 3.4 (Report on new sensor developments and their suitability for different platforms ) postponed to end of May/June 2014 D 3.5: Conclusion report task 3.1 [month 42 = Oct 2014!!] “Report summing up the main conclusions from the 2nd workshop on the best practice, common procedures and agreed standards of FB systems”

GA, Oslo May 2014, WP3 Status - 25 ANNOUNCEMENTS: Next FerryBox workshop (FerryBox Community): Tallin September 2014 ( Side meetings: Best practice: FerryBox: today, lunch break? Fixed Platforms: ??? Gliders: not necessary

GA, Oslo May 2014, WP3 Status - 26 W. Petersen, BSH Treffen Aug

GA, Oslo May 2014, WP3 Status - 27 WP3: PERSONAL MONTH PER PARTNER