1 Ching-Hui Wu Department of Nuclear Regulation Atomic Energy Council, Taiwan September 23, 2013 An Overview of PRA Activities in Taiwan.

Slides:



Advertisements
Similar presentations
A 2030 framework for climate and energy policies Marten Westrup
Advertisements

LOGO Environmental Planning & Assessment Centre, Yonsei University Prof. Dr. Mu Choon Lee Sep EA master programs in Korea.
International Technology Roadmap for Semiconductors 2001
ESTAT/C/1 08/02/ :37 Slide: 1 Commission Européenne - Eurostat Revision of ESA 95 Planning and Process OECD Working Party on National Accounts October.
Office of the Inspector General April OIG Reporting General Standards - Article 118: Activity Plan. General Standards - Article 121: Audit Reports.
I-95/Route 630 Interchange, Alternative E FUNDING (Cumulative) SCHEDULE JULY 2007 JULY 2008 JULY 2009 JULY 2010 JULY 2011 JULY 2012 JULY 2013 JULY 2007.
Replacement of the Queens Approach Bronx-Whitestone Bridge
Toulouse, May 2011, Slide 1 20 x 20. Toulouse, May 2011, Slide 2 20 x 20.
UAS: Regulatory developments in EASA Michael Smethers Chairman of EASA Management Board 13 September 2011.
Water Management Policy context
EASA and the EU Regulatory Framework
Czech approach to Regulatory Impact Assessment Prof. Michal Mejstřík Chairman of Regulatory Impact Assessment Board (RIAB) of the Czech Government Legislative.
The Implementation Structure DG AGRI, October 2005
Knowledge Platform for assessing the costs and benefits of flood prevention FLOOD CBA Presentation: Ms Vasiliki Papadopoulou, SIGMA CONSULTANTS Ltd Kick-Off.
ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Project Natural and Technological Hazards in Europe Philipp Schmidt-Thomé
ISO/TS WHO Informal Consultation on Nomenclatures for Medical Devices March 23-24, 2011 Leighton Hansel Convener ISO/TC210 WG3 Symbols and Nomenclature.
XV-RA V/Doc. 5.2(2) Expected Result: 11 EFFECTIVE AND EFFICIENT MANAGEMENT PERFORMANCE AND OVERSIGHT OF THE ORGANIZATION Strategic Plan for the Enhancement.
FOREST EUROPE Preparing the Sixth Ministerial Conference, including a possible legal instrument on forests EFI Annual Conference 15 September 2010, Dresden,
The Basel Convention and its application to ship recycling
Presenter Name(s) Issue date National Student.
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
Alaska Accountability Adequate Yearly Progress February 2007, Updated.
Country Statement to the Regional Platform for Disaster Risk Reduction in the Americas II Session – The Virgin Islands Presented by Simone Lettsome-Nibbs.
GHS Implementation in Vietnam
Overview of the Green Infrastructure Section of PWSAs Feasibility Study Presentation Charrette No. 3: April 19, 2013 Presenter: Ross Gordon, PE, CFM, LEED.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
10/04/20081 TWG of ESF Committee 10 April 2008 Franck Sébert Head of unit DG EMPL/I/1 Relations with Control Authorities Action plan to strengthen the.
Green Building Ordinance Transportation and Environment Committee
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
Feeder Line Replacement Refresher Questar Gas Company Meeting with Utah PSC March 27, Questar Gas Company Docket No QGC Exhibit 1.10.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Title : KNCAP Current Activities and Future Roadmap Name :
A ten-year monitoring record of the western prairie fringed orchid at Pipestone National Monument Gary D. Willson, Craig C. Young, and F. Adnan Akyuz.
D:\data\PowerPoint\Raynal\NCP-EURATOM Meeting - CCAB ppt Slide 1 National Contact Points for EURATOM- Information Exchange Meeting October 16,
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Animal Welfare Strategy in North Africa
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
COMPUTER B Y : L K. WINDOWS INFORMATION B Y : L K.
1 $3.5M UI Claims Modernization Project Close Presented to PCC, July 27, 2011.
INSPIRE and flood directive reporting: important issues to raise Manuela Pfeiffer WISE GIS/IT-Workshop 7.5./ Copenhagen.
WGOE Meeting – 29/31 May 2006 Sub-directorate for power reactors DGSNR – SD2 - 1 Organisation of the operating experience and incident.
Non Road Mobile Machinery Engines Global Technical Regulation for Approval by GRPE Draft NRMM gtr 2009/16 Final Report 2009/17 Informal document No. GRPE
INPO Update Configuration Management CMBG Meeting
1 Developing EPA’s Peer Review Program Joint JIFSAN/SRA/RAC Symposium Dorothy E. Patton, Ph.D., J.D. September 30, 2003.
HIGH LEVEL PERSPECTIVE ASSESSING CEIOPS’ PROGRESS SO FAR AND IDENTIFYING FUTURE CHALLENGES IN CONJUNCTION WITH THE ASSESSMENT OF THE LAMFALUSSY MODEL Carlos.
Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
Teacher Evaluation System LSKD Site Administrator Training August 6, 2014.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Regulatory Approach to the Lifetime Management of the Nuclear Power Plants in Korea June 30, 2004 Choi, Kyung Woo Korea Institute of Nuclear Safety International.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
Jyh-Tzong Hwang Section Chief Department of Nuclear Regulation Atomic Energy Council Follow Up Measures for Maanshan Unit 1 Station Blackout Incident.
1 Ching-Hui Wu Department of Nuclear Regulation Atomic Energy Council, Taiwan September 23, 2013 An Overview of the Recommendations from NEA peer review.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
Internal Flooding PRA For APR 1400
RCF Plenary Session 21 September 2018
Presentation transcript:

1 Ching-Hui Wu Department of Nuclear Regulation Atomic Energy Council, Taiwan September 23, 2013 An Overview of PRA Activities in Taiwan

2 A Brief History of PRA in Taiwan Major PRA Projects (Main Sponsor) Periods Scope* Application Task Force Man- year L1- P L1- SM L1- TY L1- FR L1- FL L1- SD L2 Kuosheng (AEC) 1983  1985  Base PRA model development 37 (4.5) # Maanshan (AEC) 1985  1987   (1992) Base PRA model development 27.5 (2.0) # Chinshan (AEC) 1988  1990  Base PRA model development 34.5 (1.0 ) # 1st-3 (Taipower) 1994  1997  Few cases of justification of continued operation 52 2nd-3 (Taipower) 1997  2000 DCR & experience updates (~1999)  CSET CPET  TIRM (risk monitor)  Fire models upgrade  PRAM (PRA Maintenance)  OLM 66 3rd-3 (Taipower) 2000  2003 DCR & experience updates (~2002)LERF  TIRM-2  FT Engine developed  NEI peer review  Chinshan RIFA (Risk-informed Fire Wrapping Alternatives Analysis)  RI-ISI pilot 66 4th-3 (Taipower) 2004  2007 DCR & experience updates (~2005)  Lungmen base PRA model  SDP tool (PRiSE) developed  Follow-on NEI Peer Review  Maintenance Rule Implementation 66 5th-3 (Taipower) 2008  now PRA model upgrade  Upgrade to meet ASME/ANS PRA standards and peer review  NFPA 805 transition (potential)  Typhoon model enhancement 24 *P: Internal at-power; SM: Seismic; TY: Typhoon; FR: Internal Fire; FL: Internal Flood; SD: Shutdown; L1: Level-1; L2: Level-2 #:from US Consultant

3 Improvement by the Suggestions from AEC Project Generic items:  A.C. power reliability improvement (5th DG, G/T building)  Emergency operating procedure improvement  Prevention of ATWS and operator training after ATWS  Fire protection Improvement  Enhance seismic design Control room, SRV´s accumulator (CS) Sluice gates, EChW/NChW hold down bolts (KS) D.C. battery racks (MS) CS:  Improve instrument air system  Prevention of miscalibration of low-pr injection permission KS:  Change 69KV switchyard to GIS  HPCS/RCIC suction changeover  Add H2 control system inside containment  Replacing instrument junction boxes with in-line crimping MS:  NSCW system and pump vibration  CCW system and heat exchanger improvement  EChW system and heat exchanger improvement  Turbine driven AFW pump room cooling improvement  4.16KV switchgear room flooding protection improvement

4 On-going PRA Applications  RI-ISI program plans development for all three operating NPPs  Kuosheng had made the first submittal in early 2012  Maanshan’s submittal in last July is under reviewed  Base PRA models enhancement, including the Lungmen NPP, to meet ASME internal events standard (ASME/ANS 2009)  Objective: Capability Category II in general  Development of Internal events and internal floods PRA models for Chinshan, Kuosheng, Maanshan  Fire PRA for Chinshan NPP  Fire PRA for Kuosheng and Maanshan NPPs  Draft of the Fire Protection Guidelines for NPPs  Supporting potential future NFPA-805 transition activities

5 On-going PRA Applications (Con’d)  SDP tool (i.e. PRiSE) kernel update and enhancement  internal at-power, SD, seismic and typhoon  Supporting Maintenance Rule implementation  Tools for MR process and Integrated scheduling and risk monitoring  ASME/ANS PRA standards introduction  L-1 Internal events at-power, Seismic events, Internal fires  Screening of other external hazards

6 ASME/ANS PRA standards PartRequirementsTimetableNPPs 2 Internal events at power PRA CS, KS, MS 3 Internal flood at power PRA CS, KS, MS 4 Fires at power PRA CS KS, MS 5 Seismic events at power PRA CS, KS, MS 6 Screening and conservative analysis of other external hazards at power CS, KS, MS 7 High wind events at power PRA 8 External flood events at power PRA 9 Others external hazards at power PRA 10 Seismic margin assessment at power CS, KS, MS TPC will update the LP&SD, L2 and L3 models based on the dedicated ASME PRA standards.

7 Summary of PRA Applications in Progress  Stress test supporting evaluation  Fukushima follow-on  Update of the Seismic PRA models  New earthquake evidences and faults re- classification  Development of other external events PRA models  e.x. external floods including tsunami event  Supporting self management of On-line Maintenance  OLM program plans of the 3 operating NPPs had all been approved docketed by AEC in 2011  Risk assessment supporting (a)(4) activities

8 Thanks for Your Attention