© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-1.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Planning Reports and Proposals
Chapter 9: Probabilistic Scheduling Models
Chapter 16: Managing Risk in an Organization
© 2005 by Prentice Hall Chapter 13 Finalizing Design Specifications Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F. George.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Standard Costs: Direct Labor and Materials Chapter Twelve.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 14-1 Chapter Fourteen Auditing Financing Process: Prepaid Expenses.
Operations Scheduling
SHOW ME THE MONEY BUDGETING 101.
INTERNAL CONTROLS.
ASTM International Officers Training Workshop September 2012 Pat Picariello, Director, Developmental Operations 1 Strategic Planning & New Activity Development.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop Strategic Planning & New Activity Development September 2013.
Designing and Building a Results-Based Monitoring and Evaluation System: A Tool for Public Sector Management.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Project Management Concepts
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 2 Business Processes and Accounting Information.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Modern Systems Analyst and as a Project Manager
APS Teacher Evaluation
EMS Checklist (ISO model)
Management Plans: A Roadmap to Successful Implementation
Change Management Overview. 2 Objectives Overview of the change management approach Clarity on how the tools support the change approach Apply the change.
1 Dr. Ashraf El-Farghly SECC. 2 Level 3 focus on the organization - Best practices are gathered across the organization. - Processes are tailored depending.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
A Roadmap to Successful Implementation Management Plans.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
1)List and briefly describe the three project quality management processes. Quality Planning: Identify which quality standards are relevant to project.
Achieving Success as President Club Leadership Training Session.
© The McGraw-Hill Companies, Inc., All Rights Reserved. Irwin/McGraw-Hill Chapter 3 Money Management Strategy: Financial Statements and Budgeting.
2-1. McGraw-Hill/Irwin Copyright © 2006 The McGraw-Hill Companies, Inc. All rights reserved. 2 Money Management Skills.
Management Information Systems [MOIS470]
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Guest Charges, Payment, and Check-out
Checking & Corrective Action
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
How to commence the IT Modernization Process?
1 Leading Change through Strategic Planning Ralph J. Jasparro, Ph.D.
Addition 1’s to 20.
25 seconds left…...
Monitoring and Controlling the Project
1 Budgets and Budgetary Control Prepared and Presented By Gladstone K. Hlalakuhle.
©Ian Sommerville 1995/2000 (Modified by Spiros Mancoridis 1999) Software Engineering, 6th edition. Chapters 1,3 Slide 1 Software Engineering Software Engineering.
Controlling as a Management Function
Week 1.
We will resume in: 25 Minutes.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Command and Management Unit 5.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project monitoring and Control
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Pre-Project Components
Project Management and Risk. Definitions Project Management: a system of procedures, practices, technologies, skills, and experience needed to manage.
Chapter 16 Control Evidence-Based Decision Making Copyright © 2016 Pearson Canada Inc.16-1.
Module 5 Session 5.2 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.2 Reviewing the PAR and refining key project.
Chapter 11: Project Control and Assessment
Read to Learn Describe the overall purpose of management. Discuss the four functions of management.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Copyright 2009 John Wiley & Sons, Inc. Chapter 11 Project Control.
Chapter 11 Project Management.
Reaching Goals and Objectives
Project Management and Risk
Project - Execution stage
Project Management Chapter 11.
Chapter 11 Project Control.
Presentation transcript:

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-1

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-2 Chapter 11: Project Control keep project on target as close to plan as feasible adapt to new circumstances

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-3 Planning vs. Control Planning set goals & directions allocate resources anticipate problems motivate Control guide work toward goals ensure effective use of resources correct problems reward achievement

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-4 IS Control Problems Lin & Hsieh (1995) Corporate Culture can be closed to new ideas Organizational Stability if changing, too busy Developer Experience with IT Developer Task Proficiency Project Size bigger projects, greater risks System Structure changing requirements cause problems

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-5 Managerial Actions to Maintain Project Control Ahituv et al. [1999] 1.Early user involvement 2.Senior non-technical management in charge for time and budget performance 3.Milestones for accurate project progress measurement 4.Hold suppliers & vendors legally responsible for deadlines 5.Dont change project requirements

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-6 Risk Management Boehm (1989)top risk items Personnel shortfalls Dynamic requirements Externally provided components Real-time performance benchmark Development incremental development, requirements scrubbing Unrealistic estimates multiple sources

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-7 the Control Process assess actual vs planned technical accomplishment verify validity of technical objectives confirm need for project time progress to match operational requirements oversee resource usage monitor costs

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-8 Control Process Phases performance standards - technical specifications, budgeted costs, schedules, resource requirements –from user specifications, project plan compare performance with plan - forecast anticipated date and cost at completion corrective action taken when severe variance encountered

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson 11-9 Control Devices Responsibility Assignment –Chart activities with personnel identify what each is responsible for Budget –variance analysis –Earned Value

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Earned Value Work PackageBudgeted% doneEarnedActual A B C D Total earned value5154 Efficiency = earned/actual A= 20/25 = 0.80B = 10/8 = 1.25 total project= 51/54 = 0.94

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Traditional Cost Control variance analysis in project management, deficient - doesnt track how much work completed, no projections of future costs –so show quantities –progress may be nonlinear

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Project Cost Monitoring tie to work packages –work descriptions –time-phased budgets –work plans & schedules –responsibility assignments –resource requirements keep up with change orders

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Work Authorization upper management authorizes project project manager authorizes department work via work orders functional managers authorize work orders to sections

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Data Collection upper management continues or cans project manager adjusts to solve problems work sections report progress

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Data Collection & Tally periodically collect data about actual costs and work progress project control accounting system tallies and summarizes –by work package –by department –project overall manager intimately familiar with budget, actual

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Project Review Meetings where things are going wrong –emergencies –time bombs –opportunities should be periodical participants should have information prior give assignments to present in advance –broaden participation

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson When to Hold Review Meetings periodic –regularity leads to more thorough preparation –can have in central meeting place with network schedule on wall key data available special event –at critical milestones

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Corrective Action identify WHEN ACTION NECESSARY –how much variance is acceptable? –rather than preset limits, ought to be constant projection to completion –is change worse than current?

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Reasons for Changes change in project scope & specification changes in design - errors, omissions, afterthoughts, revised needs changes to improve rate of return changes to adopt improvements

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Impact of Changes cause grief the more the project completed, the more difficult to change impact on project scope, cost, schedule are major sources of conflict may reduce changes & impact by change review process

© McGraw-Hill/Irwin 2004 Information Systems Project ManagementDavid Olson Summary project control guides work toward goals assess actual versus planned need data collection, information dissemination focus on work package & cost account use authorization process constantly update projected performance