1 Femto Cell System Overview S.P0139-0 Status Update to CDG and Femto Forum Fukuoka, Japan, September 2010.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0647r1 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Advertisements

Doc.: IEEE /0647r0 Submission May 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
Fostering worldwide interoperabilityGeneva, July 2009 Use of cdma2000 ® Femto Cells for Home Network Applications Home Networking Global Standards.
Ref: Exploiting the digital dividend – a European approach: overview of the study for the European Commission Amit Nagpal, Lee Sanders, Richard.
Page 1 Norikazu - Nick Yamasaki KDDI Corporation Chair, TSG-S Upcoming Services and Systems Aspects for 3GPP2: 3GPP2 Future Directions and IMT-Advanced.
1 3GPP2 IP Based Emergency Calls IETF/3GPP Hosted SDO Emergency Services Coordination Workshop Columbia University, New York 5-6 October, 2006 Deb Barclay.
GSC-13 Presentation TR-45.5 Spread Spectrum Digital Technology -- Mobile and Personal Communications Standards.
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
Fostering worldwide interoperabilityGeneva, July 2009 Global Standards Collaboration (GSC) 14 DOCUMENT #:GSC14-GTSC7-005R1 FOR:Presentation SOURCE:TIA.
Femtocell Activities in 3GPP2 TSG-C Edward G. Tiedemann Chair TSG-C 31 March 2009 New Orleans, LA.
15-16 October 2007, 3GPP2 TSG-S Femto Cell Workshop Femto Cell Service Requirements and Issues Norikazu ( Nick ) Yamasaki Ryuhei Munakata KDDI Corporation.
Overview.  UMTS (Universal Mobile Telecommunication System) the third generation mobile communication systems.
Orientation to the Physical Education K to 7 Integrated Resource Package 2006.
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 TR#2 “Second Edition” Long Beach Meeting April 28, 2004.
SOURCE:Chair, Editor CONTACT: Alex Gogic – TSG-S WG1 Mike Dolan – ABSTRACT: This contribution.
DOCUMENT #:GSC15-PLEN-48 FOR:Presentation SOURCE: ATIS AGENDA ITEM: PLEN 6.10 CONTACT(S): James McEachern
SUMMARY TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 Planning for TR#2 Second Edition Long Beach Meeting April 28, 2004.
Progress report of Working Group activities 1 David Pennington, EC (JRC) - WG1 Co-chair Food SCP RT Plenary meeting – 20 th November 2013.
Fostering worldwide interoperabilityGeneva, July 2009 cdma2000 ® Femto Activities Wireless access including RLANs and ad-hoc Networking Global Standards.
Sam Samra-CDG CDMA Development Group. CDGOperators Subscriber Equipment Network Infrastructure Network Enhancement/ Optimization Revenue Management/ Enhancement.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
SUMMARY TSG-S Hosted 3GPP2 Femto Cell Workshop OCTOBER 2007 Hyatt Harborside Boston 101 Harborside Drive, Boston, Massachusetts, USA Sponsored.
1 An Analysis of 3GPP and 3GPP2 Requirements for Common IMS January 2008 Source:Aleksandar M. Gogic, Chair TSG-S WG-1.
1 Title:Using group of artificial pilots to identify target femtocell during active hand-in Source:Peerapol Tinnakornsrisuphap, Ravindra Patwardhan QUALCOMM.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
1 Summary of TSG-S Femto Related Activities Nick Yamasaki (KDDI) - Chair New Orleans, LA, USA March 31, 2009.
1 17 February 2009 Subject:Draft Presentation for Femto Conference, March 2009 Date: 17 February 2009 Source: Airvana Contact: Doug Knisely
Targets for project progress 2015: graduation review – clear documentation and PoC implementation specify general framework and API requirements gap analysis.
Review of Q.3/13 work TTC February Q.3/13 results in 01/2008 (Part 1) TD460(wp2) is the meeting report. Approved document - Emergency Telecommunications.
3GPP2 Organization Structure and Roles in Femtocell-Related Work
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
Cdma2000 Femto Standardization Activities in 3GPP2 Presenter: Douglas Knisely Airvana, Inc. Femtocell World Congress June 2009 Heathrow, UK.
Jackie Voss Manager, Global Standards Development ATIS All-IP Transition Initiatives September 30, 2015.
Femto Network Dr. Monir Hossen ECE, KUET Department of Electronics and Communication Engineering, KUET.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
Jun Wang Anand Palanigounder Peerapol Tinnakornsrisuphap
Cdma2000 Femto Standardization Activities in 3GPP2 … Femtocell World Summit June 21 st -23 rd, 2011 London, UK.
3GPP2 Femto Cell Workshop: System Selection, Interference Management, Handoffs and Mobility Ed Tiedemann 15 October 2007.
Cdma2000 Femto Standardization Activities in 3GPP2 Presenter: Peerapol Tinnakornsrisuphap Qualcomm Femtocell Americas November 16 th -17 th, 2009 San Diego,
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
September 28, 2006 Page 1 3GPP2 MMD Status for IMS Workshop Jack Nasielski
MEF Liaison ad-hoc session - Session #70 Potential Response to the MEF IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0122r1.
10/27/2008X xx-0021 Femto Initialization Aspects: Femto AP Auto- configuration procedures Source: QUALCOMM Inc Chandru Sundarrman
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the.
Doc.: IEEE /0730r0 Submission July 2005 Stefano M. Faccin, NokiaSlide 1 3gpp2-liaison-report-july-2005 Notice: This document has been prepared.
Mobility Support in Femtocell Document Number: IEEE C802.16m-08/1431r1 Date Submitted: Source: Kaibin Zhang, Gang Shen, Jimin LiuVoice:
Support for Femtocell Document Number: IEEE C802.16m-08/1089 Date Submitted: Source: Guang Han, Hua XuVoice: ,
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
1 Title: A Proposal for Identifying Hand-In Femto Cell Sources: ZTE Contact: Yonggang Fang Xiaowu Zhao
Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA
SADC WRC-15 Preparatory Meeting
Overview of TSG-X Femto Standardization Activities
20th CJK UNIOT-WG (Standardization of Mobile IPTV in ITU-T)
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
Wireless Access including RLANS & ad-hoc Networking
Source: [Liang Li, Chenyang Yang] Company: [ Vinno Technologies Inc. ]
Mark Epstein Senior Vice President Qualcomm
Next Steps Advisory group debrief call Circulate meeting summary
IMT-Advanced Technical Requirements
An Introduction to CDMA Air Interface: IS-95A
Activities of ARIB on IMT Standards
WG 03 IoT Identifier Task Force Status 11/2017
Month Year doc.: IEEE yy/xxxxr0 August 2019
Presentation transcript:

1 Femto Cell System Overview S.P Status Update to CDG and Femto Forum Fukuoka, Japan, September 2010

2 Introduction 3GPP2 TSG-S is developing Femto Cell System Overview –Technical Report S.R0139 under development in WG1 –Femto Phase I specs complete; experts can focus on S.P0139 –First part (Section 4) is femto specification inventory, similar to System Release Guide –More in-depth contents (Section 5) can be co-published with CDG, Femto Forum, or both (an open question) Main purpose of the document: –Provide guidance to operators and others on femto cell deployment issues –Pull together in one place relevant information regarding femto cell specifications, with minimum restatement of specs –Describe not just what is specified in standards, but what is feasible with cdma2000 femto cells –A vehicle to promote 3GPP2 femto cells to broader community

3 Status Outline Started contributing in December ’09 – some topics: –Deployment phases »Legacy and femto-aware mobile support »Macro network evolution steps, etc. –Spectrum allocation scenarios – dedicated and reuse –Macro system configuration, e.g.: »Neighbor lists »Macro and femto pilot phase planning »Transition issues from legacy to femto-aware mobile support Femto Forum expressed desire to participate/review CDG is encouraged to do likewise Progressed the development slowly while awaiting completion of Technical Specifications in TSGs It is now time to accelerate completion & initial publication Latest Draft: S.P v0.5 attached

4 Contents and Structure (1 of 5) 1.SCOPE 2.INTRODUCTION 3.DEFINITIONS AND ABBREVIATIONS 4.FEMTO CELL SYSTEMS OVERVIEW 4.1Architecture and Interfaces 4.2Features and Specifications 4.2.1Femto Cell Subscriber Features and Services 4.2.2Test Specifications Legend Completed draft text (refinements still possible) Partially completed – needs further development No substantive text available Note: Status as of beginning of September 2010 meeting

5 Contents and Structure (2 of 5) 5.FEMTO CELL SYSTEM GUIDELINES 5.1Deployment Phases 5.2Radio Frequency Planning 5.2.1Dedicated Frequency and Reuse Scenarios 5.2.2Narrow-band and Broad-band Signal Sampling 5.2.3Beacon Based Femto Cell RF Design

6 Contents and Structure (3 of 5) 5.3Provisioning and Configuration 5.3.1Macro Cell Configuration in Support of Femto Cells Neighbor List Configuration for Legacy Mobiles Neighbor List Configuration for Femto-Aware Mobiles Transition Issues from Legacy to FAM Support 5.3.2Femto Cell Configuration and Provisioning Timing and Synchronization Location Femto Cell PN Offset Planning Femto Cell Transmit Power Configuration of Other Radio Parameters in a Femto Cell 5.3.3MS Provisioning in Support of Femto Cells 5.3.4Network Level Provisioning

7 Contents and Structure (4 of 5) 5.5Interference Management 5.6Access Control 5.7Broadband Access Considerations 5.8Femto System Security Aspects 5.8.1FAP Device Authentication 5.8.2FAP Device Identity 5.8.3FAP Secure Environment 5.8.4FMS Security 5.9Mobility in Femto Cell Systems 5.9.1Idle Handoff Procedures 5.9.2Active State Handoff Procedures Hand-Out Hand-In

8 Contents and Structure (5 of 5) 5.10Services Aspects of Femto Cell Systems Local IP Access (Local Breakout) Emergency Call Services Supplementary service support 5.11Minimum Performance Standards (MPS)

9 Way Forward Contents is open for additional input –Now or in subsequent version updates (sooner is better) –CDG has been briefed during Sept meeting in Fukuoka –Femto Forum is likewise informed of status via correspondence –Both are kindly asked to evaluate contents, comment on general direction –Goal is to retain market focus and real deployment needs/wants Schedule Outline (target assuming 3GPP2 publication proc.) –Additional input received in Sept. ‘10 meeting, and expected in Oct. ‘10 meeting –October ‘10: Complete draft text and start TSG Review »Minor additional input may be allowed, otherwise future version update –January ‘11: Complete TSG Review, start V&V –March ‘11: Complete V&V and Publish After Phase I version is published, start work on Rev. A for Phase II features, as well as filling any gaps in Rev. 0

10 Open Discussion Development and Publication –3GPP2 expertise is essential in document development, but deployment and recommended practices are typically outside the scope of 3GPP2 –Femto Forum expressed keen interest in assisting (April 2009) and possibly jointly publishing –CDG is likewise interested in publication plans, contents –3GPP2 should retain overall control Carious publication options still on the table –Leave with 3GPP2 –Femto Forum –CDG –Any combination of above Document changes/additions based on publication plan –Need to further discuss division of labor for joint or collaborated 3GPP2/CDG/Femto Forum publication(s)