SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview

Slides:



Advertisements
Similar presentations
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Advertisements

Overview What is the National ITS Architecture? User Services
NMDOT ITS BUREAUWELCOME THANKS for BEING HERE and HOORAY IT’S FRIDAY.
FDOT District 3 ITS Project Update Chad Williams, P.E. District 3 ITS Engineer.
Los Angeles County Metropolitan Transportation Authority (LACMTA) Caltrans Traffic Signal Management and Surveillance System (CTNET) Presented by Metro.
What is SBCAG? Voluntary council of governments Established in 1966 under a JPA executed by local governments 13 member Board of Directors: – 5 County.
Analysis of Multi-Modal Strategies on Interregional Traffic in the I-580 Corridor in Northern California ITE Western District Annual Meeting June 25, 2012.
Transportation Operations Master Plan John Ward ITS-Pennsylvania Panel Discussion Vision for Achieving Regional Mobility through ITS November 23, 2010.
Sacramento Area Council of Governments Kick-off Workshop March 8, 2005.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
CALTRANS’ TRANSPORTATION SYSTEM MANAGEMENT & OPERATIONS CTP 2040 PAC 1 Kris Kuhl Assistant Division Chief, Division of Traffic Operations 4/15/2014 CREATING.
Default Market Images located at S:\template\presentation\images\banners Alabama Statewide ITS Architecture Stakeholders Meeting November 21, 2013.
Presented by: SAGE KAMIYA, P.E., PTOE
WINTER OPERATIONS COALITION Bill Hoffman, P.E. Nevada Department of Transportation - US Chief Maintenance & Operations Engineer
Caltrans IRIS – T3 Webinar T3 Webinars are brought to you by the ITS Professional Capacity Building Program (ITS PCB) at the U.S. Department of Transportation’s.
Congestion Reduction Using Intelligent Transportation Systems Ben Sperry University of Evansville University of Evansville MESCON March 25, 2006.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Lawrence Regional ITS Architecture Update. Today’s Agenda What is ITS? Review 2007 ITS Plans Review the proposed work plan Define project goals and objectives.
San Jose Traffic Signal Communications and Synchronization Project Presented by Ho Nguyen City of San Jose, Department of Transportation May 12, 2009.
Phoenix International Raceway (PIR) Presented By: Nicolaas Swart Traffic Engineering & ITS Program Manager Maricopa County DOT April 26, 2006 Presented.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
May 22, 2003 ITSA Executive Networking Session #63 Hidden Text.
Together We Ride - Mobility Management Center for Santa Clara County Together We Ride.
Transportation 2030 Plan for the San Francisco Bay Area: Action Plan Update.
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
FDOT District 1 ITS Project Update Katherine Duvall ITS Project Manager.
Definition - CommuterLink CommuterLink is an interagency transportation management system. What does that mean? Put another way, it is the use of computer.
2 Background Lake County –24 x 20 mi area –Population 690,000 –52 municipalities Congestion –No freeways –Limited 4-lane arterials –Transportation controversies.
1 Dixie ITS Architecture Study Section ? Utah ITS History.
Fast Forward Full Speed Ahead Presented at the Joint ITS Georgia / Tennessee Annual Meeting September 25, 2006 by Carla W. Holmes, P.E., PTOE Georgia Department.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
1 California’s Unique Transportation Challenges … and ITS Solutions ITS America Meeting June 4, 2007 Lawrence Jesse Glazer & Frank Cechini FHWA – CA Division.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
I-15 Integrated Corridor Management Project I-15 Integrated Corridor Management Project MICM Workshop December 2007.
1 Regional Integration Across Jurisdictions and Modes: San Diego IMTMS ITS America 2007 Annual Meeting Palm Springs, CA Session 9 - June 4, 2007.
IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California Municipal Finance Conference April 3, 2006 Steve Heminger Executive.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
Think Regionally - Act Locally The Development and Evolution of the I-95 Corridor Coalition: Think Regionally - Act Locally John Baniak Executive Director,
High-Occupancy Toll (HOT) Lanes Recent Developments Planning and Operations Committee September 9, 2005.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Georgia’s Intelligent Transportation System
1 Arterial AMS Deployment Case Study By Joseph Brahm (847)
2010 Regional Intelligent Transportation Systems Plan: 2015 Progress Report on Implementation.
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
SIGNAL OPTIMIZATION STUDY COMMUNITY DEVELOPMENT DEPARTMENT.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Transportation System Management & Intelligent Transportation Systems May 5, 2009 Steve Heminger Metropolitan Transportation Commission.
1 Caltrans District 4 - ABAG Workshop - INFRASTRUCTURE INTERDEPENDENCIES January 31, 2012 California Department of Transportation (Caltrans) www. dot.ca.gov.
Brian Kary – Freeway Operations Engineer Minnesota Department of Transportation.
22th Asia Pacific Economic Cooperation Transportation Working Group ITS Experts Group Meeting ITS DEVELOPMENT IN CHINA September 2, 2003 Qi Tongyan, National.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
The Indiana Local Technical Assistance Program Local Agency Perspective Neal Carboneau, PE Research Manager.
Intelligent and Non-Intelligent Transportation Systems 32 Foundations of Technology Standard 18 Students will develop an understanding of and be able to.
TMCs – The Next Generation ITS Tennessee Annual Meeting / October 8, 2009 Dr. Robert Edelstein, PE, PTOE.
Integrating Corridor Management Through the Gary-Chicago-Milwaukee Corridor Action Teams.
Project Overview – Phase 1
Regional Roads Committee
Intelligent Transportation Systems
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
ITE Midwestern District Conference June 20, 2017
12th World Congress on ITS November 10, 2005
Presentation transcript:

SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview SERIES 2000 User’s Group

“What Is Being Done to Reduce Congestion?” SV-ITS Program Silicon Valley Intelligent Transportation System Program SV-ITS PROGRAM

Why is there traffic congestion? Limited roadway capacity Spill-over Fwy traffic Non-coordinated agency systems Few methods to communicate with drivers Lots of cars! SV-ITS PROGRAM

“What Can Be Done to Reduce Congestion?” Integrate traffic management centers Share data with commuter Deploy devices to monitor and manage traffic SV-ITS PROGRAM

An Example: Silicon Valley Smart Corridor The largest ITS project in Northern California. 35 mile fiber network, including arterials, expressways, and freeway. 15 miles SV-ITS PROGRAM

THE PROJECT PARTNERS DKS Associates City of San Jose IBI Group CCS Planning and Engineering Transcore/SAIC Gardner Systems City of San Jose City of Campbell City of Milpitas City of Santa Clara Town of Los Gatos County of Santa Clara VTA (Valley Transportation Authority MTC (Metropolitan Transportation Comm) Caltrans (California Dept of Transportation) CHP (California Highway Patrol) SV-ITS PROGRAM

WITHOUT CORRIDOR ROAD RAGE Little or no data from field + Non-integrated systems No means to operate multiple systems No method for sharing real-time data with travelers = ROAD RAGE SV- ITS PROGRAM

WITH CORRIDOR Cameras & loops + Data Exchange Network + Communication between multiple control centers + HAR, CMS, EMS, TravInfo for sharing data = Happy Travelers SV- ITS PROGRAM

DATA EXCHANGE NETWORK CMS HAR EMS VIDEO & DETECTOR LOOPS COORDINATED SIGNALS INTERNET SV-ITS PROGRAM

GETTING OVER-FLOW TRAFFIC BACK TO 880 3 ROUTES TO ON-RAMPS northbound traffic only EMS #3 EMS #2 EMS #1 SV- ITS PROGRAM

THE SV-ITS PROGRAM Regional ITS needs SVSC design permits expansion (DEN) Address “Market Package” Concept Benefits of Partnering San Jose - Design Agency County - Construction Agency VTA - Funding Agency Other Agencies - Project specific partners SV-ITS PROGRAM

NEW SV-ITS PROJECTS San Jose International Airport Area Advanced Transportation Management System ($2.0 million) SV-ITS PROGRAM

NEW SV-ITS PROJECTS SVSC - ITS Enhancement ($4.1 million) SV-ITS PROGRAM

NEW SV-ITS PROJECTS SVSC - MILPITAS-FREMONT ATMS ($2.9 million) SV-ITS PROGRAM

NEW SV-ITS PROJECTS SILICON VALLEY – WEST CORRIDOR (pending funding $3.0 million est.) SV-ITS PROGRAM

“What is being done to reduce congestion?” Agencies are working cooperatively on regional solutions SV-ITS projects are multi-jurisdictional to encourage cooperation. The projects improve efficiency by adding ITS technology. SV-ITS PROGRAM