“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.

Slides:



Advertisements
Similar presentations
# MEP eBusiness Standards Convergence Forum Mark Palmer National Institute of Standards and Technology October 2004.
Advertisements

Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
SG Systems - Service Definition Team Chair: Gerald Gray, CIMple Integrations Co-Chair: Shawn Hu, Xtensible Solutions
SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
SG-Systems Working Group Charter: The SG-Systems Working Group defines requirements, policies, and services, based on utility industry standards such as.
SG Communications Boot Camp November 19th, Agenda 3:30 – 3:40 – Welcome and Introductions 3:40 – 4:00 – Review scope and charter of SG Communications.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
For OpenSG Discussion: Preliminary SG-Enterprise Charter Greg Robinson, Co-Chair, SG-Enterprise Wayne Longcore, Chair, SG-Enterprise.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
OpenFMB Specification Development Plan
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
1 Connectivity Week 2010 How Can Standards Be Regulated? Thursday May 27 10:30AM-Noon Zahra Makoui.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
1 OpenADR Taskforce Chair – Albert Chiu Co-chair – Ed Koch Technical Editors – Bruce Bartell, Gerald Gray.
OpenADE Knoxville Meeting February 27 – March 1, 2012 David Mollerstuen, OpenADE TF Chair Steve Van Ausdall, OpenADE TF Vice-Chair.
SG Communications Sessions Tuesday, October 20th, 2009.
Standards Analysis Summary vMR – Pros Designed for computability Compact Wire Format Aligned with HeD Efforts – Cons Limited Vendor Adoption thus far Represents.
Copyright © 2004 by The Web Services Interoperability Organization (WS-I). All Rights Reserved 1 Interoperability: Ensuring the Success of Web Services.
OpenSG - SG Communications May 2010 Slide 1 SG Communications DC Meeting AM2 Session Tuesday 5/4/2010 Network Interoperability.
OpenSG Closing Plenary Oct 22 nd, Agenda SG Conformity SG Communications SG Systems SG Security Feedback Next Meeting.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group Overview & Plans For further information, contact Wayne Longcore Chairman of AMI-Ent TF.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Use Cases for TC57 and for other TCs… Eric Lambert EDF R&D CIM User group PRAGUES 2011.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
S&I Standards Organization Engagement & Communication Plan DRAFT Standards Support Team 1 September 2011.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
SG Systems - Service Definition Team Chair: Gerald Gray, Guiding Principle Consulting Co-Chair: Shawn Hu, Xtensible Solutions.
Today’s Agenda Agree on recurring meeting secretary
Service Definitions A Framework For Standard Interface Development.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Boot Camp - Conformity July 19, 2010 Detroit, USA.
IEC TC57 Smart Grid Task Force Ed Dobrowolski for Scott Neumann 16 June 2010.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Slide 1 EIM Charter Identify and articulate common EIM requirements: Use cases System Requirements Specification (SRS) Work with other OpenSG groups, particularly.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
OpenADR Taskforce. OpenADR and NIST Smart Grid Roadmap Conceptual Model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 11/1/2010.
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Vertical Applications TAG
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Meeting Agenda Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
Vertical Applications TAG
IEC TC57 Smart Grid Activities
Wireless Characterization for NIST PAP#2
Vertical Applications TAG
EIM Charter Identify and articulate common EIM requirements:
OpenADR SRS Draft 1 Review
Wireless Characterization for NIST PAP#2
“OpenADR” “Boot Camp” Overview
SG Communications Boot Camp
SG Communications Sessions
Presentation transcript:

“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems

SG-Systems Boot Camp Agenda 3:30Overview of SG-Systems (Greg) 3:45NIST and NAESB Impact/Collaboration (Brent) 4:00System Requirements Overview (Joe) 4:15Use Case Process with example (Ralph) 4:30Service Definitions Process with example (Jerry) 4:45OpenADE (Steve) 5:00OpenADR (Ed or Albert) 5:15General discussion, questions & answers 5:30Adjourn

OpenSG Subcommittee Organization

Focus Of SG-Systems NIST Conceptual Model [Source: NIST Interim Roadmap]

Business Drivers Interoperability requires many standards in a profile stack Work with relevant SDOs per layer of profile stack (e.g., information standards, security standards, transport standards, media standards, etc.) to ensure complete solutions for in- scope interfaces. Need formal industry standards, but the SDO process is relatively slow & needs more user input Work collaboratively with SDOs to ensure common user requirements are appropriately addressed Facilitate standards development by proposing potential solutions for addressing gaps in existing standards. The SDO ultimately determines when and how its standards are updated based on input. For Information Standards, resolve (don’t add to) semantic chaos Avoid having the same information defined with different names, varying definitions, etc. Ensure same information standards can be used across different communication profiles While mapping to other standards will be unavoidable, strive to use, correct and extend one information model standard: The IEC TC57 Common Information Model (CIM) is the default information model for this purpose. There is substantial information overlap among AMI, ADE, HAN and ADR While requirements and services vary significantly, they can be built using the same information model. To ensure consistency of information across all domains, SG-Systems WG is assigned the task of defining requirements and proposing solutions to gaps in existing standards.

SG-Systems WG Scope SG-Systems WG: The SG-Systems Working Group defines requirements, policies, and services, based on utility industry standards such as the Common Information Model (CIM), required for information exchange from and to utility enterprise back office systems and between these back office systems and data acquisition and control servers (e.g., MDMS, AMI Head Ends, SCADA, etc.). Task forces are established on an as needed basis to accomplish these goals for specific functional areas. In addition to work performed by their ‘vertical team,’ Task Force Chairs act as matrix managers to ensure their functional requirements are met through the ‘horizontal teams’ supporting them. ‘Horizontal Teams’ are ongoing, providing consistent artifacts for each increment of functionality that is requested of them by the functional (vertical) teams.

SG-Systems WG Process Overview - “A Well Oiled Machine” Use Case Team System Requirements (SRS) Team Service Definitions Team Use Cases From SCE and others IEC TC57 WG14, OASIS, IEEE Other SDOs NIST HomePlug & ZigBee SE 2.0 Integration Requirements Patterns Sequence Diagram Services WSDL Business-Oriented, Common Format Use Cases Based on SRS Reference Model Recommendations to IEC TC57 WG14: Proposed CIM Extensions Message Schemas Updates Requirements Updates Recommendations to other SDOs EPRI, MultiSpeak Interoperability Testing Team Task Forces

SG-Systems Organization Structure Planning Underway With NAESB Collaboration With SE 2.0 Collaboration With SE 2.0 & OASIS Planning Underway With NAESB Underway Collaboration With SE 2.0 & OASIS Collaboration With SE 2.0 & OASIS Collaboration With SE 2.0 Collaboration With SE 2.0

Key Collaboration Concept for the SG-Systems Working Group Standard building blocks are defined by CIMug and the affiliated IEC working groups along with other relevant industry groups e.g., Open Applications Group (OAG), MultiSpeak, OGC Requirements (use cases) are gathered from helpful sources Utilities Industry initiatives The SG-Systems WG articulates Industry Best Practices (see next slide) that satisfy requirements through the use of standard building blocks. Recommended extensions and changes to standard building blocks are provided back to appropriate standards bodies.

Our Focus: Finding/Developing Best Practices & Making Them into Vetted “Industry Best Practices” Local Utility Projects Consortiums & User Groups like OpenSG (business requirements) & CIMug (optimization & implementation support) Standards Development Organizations (SDOs) like IEC TC57 Working Group 14 for the IEC series of standards Utility’s Projects - Design & Implementations Utility’s Architecture Industry Best Practices Interoperability Testing Industry Best Practices Standards Conformance & Interoperability Testing Industry Standards

Remarks on Working Closely With SDO In recent NIST discussions, there is general agreement that formal standards are needed. While IEC is viewed as necessary, it suffers from two major criticisms: The IEC process is too slow There is not enough user participation in IEC standards development IEC TC57 helped form the UCAIug. OpenSG is a user-driven organization that functions as part of the UCAIug OpenSG is able to work with the IEC to resolve these two criticisms: OpenSG ballots its work products and make them publically available as an “Industry Best Practice” Please note that these are NOT standards as OpenSG is not a standards development organization (SDO). OpenSG work products are intended to become a common best practice based on applicable industry standards. Extensions to standards that were needed to meet OpenSG’s business requirements will be provided to the appropriate SDO (e.g., IEC TC57 WG14). The OpenSG hopes that the SDOs will accept its recommended extensions (and the extension will become part of the next release of the standard(s) In the meantime, the user community has something to leverage that is far better than custom extensions performed differently at each individual utility.