Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon.

Slides:



Advertisements
Similar presentations
Experience and problems encountered in first year of LULUCF reporting under Kyoto Protocol in Slovakia Tibor Priwitzer
Advertisements

SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Motoharu Yamazaki, Programme Officer, Process Management Unit REVISION OF VALIDATION AND.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
EMMER INTERNATIONAAL A/R CDM projects : modalities, implementation and progress Igino M. Emmer EUSTAFOR workshop Forestry & EU ETS Brussels, 26 June 2008.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Verification of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
VERTIC/REC Workshop Fulfilling the monitoring and reporting requirements under the UNFCCC and Kyoto Protocol QA/QC Procedures in National GHG Inventory.
Baseline and Additionality in the CDM Dr. Oscar Coto II National CDM Workshop Belize August 2011.
Carbon Benefits Project: Measurement of Carbon in Woody Biomass Mike Smalligan, Research Forester Global Observatory for Ecosystem Services Department.
Presentation title Overview of measurement, reporting and verification (MRV) for developing country Parties under the Climate Change Convention Asia Pacific.
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP IPCC Good Practice Guidance Simon Eggleston Technical.
1 M anaging the National GHG Inventory Process M anaging the National GHG Inventory Process UNDP NCSU Handbook Katarina Mareckova, UNDP UNFCCC regional.
The UNFCCC guidelines on national GHG inventories (Decision 17/CP.8) Panama City, Panama 25 – 29 October 2004 Dominique Revet (UNFCCC)
An introduction to the monitoring of forestry carbon sequestration projects Developing Forestry and Bioenergy Projects within CDM Ecuador March, 2004 Igino.
Baseline Methodology ARNMB0010 Xiaoquan Zhang and Bernhard Schlamadinger.
FAO NAMA learning tool to support NAMA preparation in agriculture
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Project Cycle and Project Design Document Project Cycle and Project Design Document.
Perspectives on Validation in LULUCF projects. Established on July, 1, 2004 JACO CDM Japanese Major Companies of Which business fields are finance, construction,
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
Guidance on Measurement Elaboration and Examples.
CDM A/R Investors' and Developers' Workshop, Beijing 2010 CDM Afforestation/Reforestation Projects: International workshop for developers and investors.
Basics of GHG inventory preparation and Introduction to the IPCC Guidelines and Good Practice Guidelines UNFCCC Workshop on the use of the guidelines.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Methodologies for Moldova Soil Conservation project ARNM0007 Rama Chandra Reddy July 12, 2005.
Good Practice for monitoring plans Viewpoint of a DOE Marco van der Linden, SGS Climate Change Programme
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
AIT Case Study 2: Afforestation & Reforestation Project Sudhir Sharma, AIT.
National Forest Monitoring Systems: M & MRV in the context of REDD+ Activities MJ Sanz, FAO REDD MRV Workshop for developing a roadmap to establish an.
Francisco Arango UNFCCC secretariat Draft JI LULUCF PDD form (incl. guidelines for users) Fourth meeting of the.
EMMER INTERNATIONAAL ARWG tools and consolidation of methodologies Igino Emmer.
UNFCCC secretariat Ruta Bubniene, Programme officer, Reporting and Review unit, Mitigation and Data Analysis programme Overview of the synthesis report.
1 National Greenhouse Gas Inventories Dominique REVET Programme Officer UNFCCC secretariat Reporting.
A Grand Plan for FIA’s role in a FS National Carbon Accounting System Linda S. Heath USDA Forest Service Northern Research Station, FIA Forest Carbon Accounting.
Issue Management Group on Sustainable Management, Geneva, February 2010 The UN GHG Inventory Shoa Ehsani SUN Geneva, Palais de Nation, February 2010.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Comments on Monitoring Methodologies Winrock International Training Seminar for BioCarbon Fund Projects.
Verification from PPs perspective Round table on A/R CDM projects Carbon Finance Unit – World Bank August 24&25, 2009 Walter Oyhantçabal A/R WG.
EMMER INTERNATIONAAL LULUCF and insights into the ARWG Igino Emmer.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Review of CDM methodology development process Annual Meeting of the Host Country Committee on Carbon Finance Washington DC, 15 February 2005 Lasse Ringius.
1 Developed by U.S. Environmental Protection Agency (U.S. EPA) January 2014 Setting up a Sustainable National GHG Inventory Management System.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
CD-REDD2 Forest National GHG Inventories Kick off meeting Sandro Federici, Gea Galluzzi Bonn 27 th May, 2010.
IPCC National Greenhouse Gas Inventories Programme (IPCC-NGGIP) Inventory Task Force Co-chairs: Thelma Krug (Brazil) Taka Hiraishi IPCC National Greenhouse.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Tool for ex-ante estimation of forestry CERs – "TARAM"
Air Quality Governance in the ENPI East Countries Training on emission inventories Systems for calculating emissions December, 2013, Tbilisi, Georgia.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
Implementation Subprogramme
Validation of Forest-based Carbon Projects
The International Small Group and Tree Planting Program (TIST)
Baseline setting and monitoring under JI compared to the CDM approach
Item 4.2 – Implementation of the Adult Education Survey
DEVELOPMENT OF MRV-SYSTEM & REL/RL IN TANZANIA
Reference Manual update Item 6.2 of the agenda
CDM Activity Cycle under the Marrakech Accords
Development of determination and verification manual (DVM)
Presentation transcript:

Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon Finance Unit, ENVCF, World Bank, Washington DC August 24 & 25, 2009

Overview Monitoring requirements of methodologies UNFCCC Tools Items for monitoring Preparation of monitoring guidance Monitoring and Reporting Tool Training and capacity building Outstanding issues Steps for improvement

Monitoring Requirements

UNFCCC Tools The UNFCCC tools related to monitoring: Tool for calculation of the number of sample plots for measurements in A/R project (ver. 02). Tool for testing significance of GHG emissions in A/R CDM project activities (ver. 01) Estimation of GHG emissions related to displacement of grazing activities in A/R CDM project activity (ver. 02)

SMART – Simplified Monitoring AR Tool SMART is the monitoring system developed by the Bio-CF to monitor AR projects. It comprises: Documentation: – Monitoring Manual (SMART Manual) – Printed data collection formats – Reporting formats – Monitoring Report templates Excel spreadsheet formats Calculation modules Internet-based monitoring system (i-SMART)

SMART Documentation The SMART Manual comprises: HOW TOs – Task-wise, how to guidance – 24 HOW TOs planned Forms for field data collection – Project boundary, strata, implementation – Carbon pools – Emissions and leakage – Quality control Reporting formats Monitoring Report templates Index of variables names in all methodologies. Tables of default values (IPCC and other sources used in methodologies). Ancillary documentation References

SMART Monitoring HOW TOs

SMART Monitoring Formats All available in printed and Excel spreadsheets Modified to suit methodologies used in Bio-CF portfolio

i-SMART Monitoring and Reporting Internet based tool covers: – Monitoring provisions of methodologies-- Project database – Measurement data-- Calculation modules – Quality Assurance/Quality Control -- Monitoring Reports

i-SMART Sample Plot Data

i-SMART - GHG Removals by Sinks Calculation Modules

i-SMART Quality Assurance/Quality Control

Training and Capacity Building Audio and videoconferences with project entities In-country workshops on monitoring – Capacity building for field monitoring – Sample plots layout and measurement Support on data transfer and upload – Database and Excel reports to i-SMART Organization of database and reporting formats Preparation of monitoring reports

Outstanding Issues – Project Level Capacity constraints – Limited trained personnel available for sample plot lay out and inventory – Long term tasks to be implemented over several decades – Requires excellent documentation and training of new staff Growth data – Lack of allometric equations for most species – Limited basis for adopting biomass expansion factors used in ex ante estimation – Potential of increasing certified credits by developing local factors and equations

Outstanding Issues – Portfolio level Encourage project developers to collect field data and organize it centrally Make monitoring relevant and supportive to forest management activities Keep monitoring simple Obtain timely and accurate carbon deliveries Need to validate SMART tool

Outstanding Issues- Regulatory Methodology revisions – Revisions of methodologies have not reduced the monitoring burden. Several elements removed, but increased complexity because of versioning – Inconsistencies and omissions in monitoring methodologies Procedures on deviation/revision of monitoring plan unclear Limited DOE experience on monitoring aspects

Expectations from AR WG Simplification of methodologies and guidance Channel to discuss and clarify unclear methodological and monitoring aspects Request for inputs from project participants before revisions to methodologies and consolidated methodologies are approved Timely publication of updated methodologies

Thanks for your attention!