Presentation is loading. Please wait.

Presentation is loading. Please wait.

The International Small Group and Tree Planting Program (TIST)

Similar presentations


Presentation on theme: "The International Small Group and Tree Planting Program (TIST)"— Presentation transcript:

1 The International Small Group and Tree Planting Program (TIST)
Part 1: TIST Project Background Training Seminar for Projects July, 2005

2 The International Small Group & Tree Planting Program
25,000 smallholder farmers Empowered Small Groups Reforestation, Conservation Farming, Health Education (HIV/AIDS) Tanzania (2000), India (2002), Uganda (2003), Kenya (2004)

3 Living In Desolation

4 TIST Participants: Choosing Change

5 Transforming landscape to forest

6 Small Groups Prepare Nurseries

7 Trees line paths, shade houses, …

8 ... & allow grass to grow.

9 TIST Roles: The Small Group
Registration Training Decision Making Nurseries Tree Planting Reporting Best Practices Bank Account

10 The International Small Group and Tree Planting Program (TIST)
Part 2: TIST Monitoring Systems & CDM Methodologies Training Seminar for Projects July, 2005

11 TIST Monitoring Systems Uses latest technology, methods to best meet needs

12 Keys to TIST Monitoring Systems
Years of hardware, software & methods development Palm computers, GPS, synchronizations, website development, technologies to minimize training & ramp-up time Thousands of site visits to groves = years of hard work Transparency, Accuracy, Business Integrity Transparency: simultaneous & public access to data from site visits Accuracy: data tracked vs. data “reported” for various purposes… Examples of items that change over time: All groups vs. just active Small Groups All groves vs. just CDM-only groves All trees vs. just trees>1.73m Integrity: hold some tons in reserve/won’t sell even up to the “accurate” # of tons… Relevant to more than just CDM buyers: host country, development agencies, public, non-CDM buyers, etc.

13 Results at

14 Project Scenario: Location of Groves

15 Project Scenario: Trees by Age & Species Cohort
Additional Info: Tree Height > 1.37m? Diameter allometric Spacing/GPS Grove size

16 CDM Project Boundary: Groves
Groves, once established by SGs, define TIST project boundary SGs report that they established a grove TIST quantifiers visit grove, note tree counts by age & species cohort, GPS coords Trees existing prior to start are excluded TZ 2000 IN 2002 UG 2003 KE 2004

17 Baseline Methodology for Groves
Project boundary (groves) evolve over time Multiple parts to TIST baseline study: Area deforestation analysis (one-time) From dialogue during initial participant training Backed up by research from authoritative sources Grove-specific site visits (initial + over time) Visits within first 12 months to define boundary & note age & species by cohort Repeat site visits: grove may fail to meet CDM or may expand with additional plantings each year

18 Baseline Scenario Conservatively estimated as 0
No SG formation, no training (on tree-planting, CF, HIV/AIDS, SG BPs), no tree payment incentives, no SG bank accounts… No tree nurseries, no holes dug in preparation, no tree transplanting from nurseries to holes Continued deforestation

19 Leakage Conservatively estimated at 0: Travel emissions
Between groves by quantifiers & project managers Between US & host countries by project managers by US-based personnel C sequestration outside groves Fuelwood obtained from TIST plantings More C sequestered outside TIST

20 The International Small Group and Tree Planting Program (TIST)
Part 3: CDM A/R Working Group Issues Raised Training Seminar for Projects July, 2005

21 Project Boundary A/R WG Issues
Groves, once established by SGs, define TIST project boundary A/R WG: orchards near towns arguably could be part of baseline scenario per A/R WG (suggest extra additionality screen) A/R WG: add land eligibility screen how to ensure no trees after 1989?

22 Baseline Scenario for Groves
Conservative TIST Baseline: 0 carbon no SG formation, no training (on tree-planting, CF, HIV/AIDS, SG BPs), no tree payment incentives, no bank accounts, no tree nurseries, no tree planting, continued deforestation A/R WG: ignored natural regeneration Not explicitly addressed Far outweighed by continued deforestation for fuelwood A/R WG: include gross carbon sequestration in baseline Cannot include carbon from gross tree plantings in project scenario. Must account for fuelwood demand & mortality in project scenario to produce net C.

23 Leakage Leakage conservatively estimated at 0 A/R WG:
Delete benefit of fuelwood from within groves Add impact of displaced agricultural activities

24 Other A/R WG Recommendations
Stratify groves into climo-edaphic zones Count only trees > 1.37m Re-measure diameters of same trees each visit Specify tree sampling across grove breadth Apply allometric equations to each tree; then sum Calculate 95% confidence intervals for C

25 TIST Methodology Outcomes
Recommendations on changes to TIST methodologies A/R WG, WB, CAAC, Others TIST system modifications implemented across four countries (to address A/R WG recommendations) Resubmission of improved/modified CDM methodologies for approval


Download ppt "The International Small Group and Tree Planting Program (TIST)"

Similar presentations


Ads by Google