PROJECT MANAGEMENT PROJECT MANAGEMENT. PLANNING - PROGRESS.

Slides:



Advertisements
Similar presentations
Codes & Standards.
Advertisements

EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.
Chapter 4 Welding Symbols
AWS Fundamental Terms and Definitions
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
1 Recognition Assessment Questions Answered. 2 What is Recognition Assessment? It is not an exam or test. It looks at the candidate’s industry skills.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Comments to Manufacturing QA documentation
MODULE CODE IWLD209. I. WHO IS THE WELDING INSPECTOR? A RESPONSIBLE PERSON WHO – a. Determine weld quality to specification. b. maybe an Overseer of others-
Pharmaceutical Water Systems Alain Kupferman Manufacture of sterile medicines – Advanced workshop for SFDA GMP inspectors, Nanjing, November 2009.
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
Company Forms, Records & Administrative Procedures Westwind Air Service.
Tim Haeberle API SC Winter Meeting
Power Plant Construction and QA/QC Chapter 6 – Welding, Procedure and Operator Qualification Engineering Technology Division.
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
November 7, Status * Task group initiated in November * Steering Committee requested a summary report in July * Summary report deemed.
1 API 16 AR Specification for Drill- through Equipment Remanufacturing Summer Standards Meeting Communication Jan van Wijk / Chris Johnson API-16AR chairman.
BVN BVN TM PEV2 – Boilers Head Office – Department Technology Equipment - V0 – November 2009.
Chamdor Plant Tungsten Street Plant Cobalt Street Plant Dedicated Welding And QC Facility Machine Shop THREE FOUNDRIES AND SUPPORTING PLANTS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Types of Jobs.
CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.
Welding Inspection and Metallurgy
By: Colby Ingram.  I am picking this job because I like welding an I am good at it. It also pays great money and the world will always need welders to.
Understanding The Core Curriculum. A national strategy The strategy for literacy and numeracy was launched by the government in Autumn 2000 and included.
Welding Drawings. Why welding drawings? Drawings are needed to share information with others involved in the project. –Owner –Architect and Engineer –
Documentation Traceability and documentation is required.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Developed by the American Welding Society as part of the SENSE Workshop Series Introduction to SENSE and Registration Process.
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
MICE hydrogen review Approval process. Process Working group Document pack PPD Director & ISIS Director Prerequisite testing Completed action list Approval.
Metal Fabrication Quality and conformity of our products 2015.
Name.   About YOU! History   Name  Explain Dream Job.
Supplier Quality Improvement
WELCOM TO EGIQC. EGIQC Engineering Group For Inspection & Quality Control.
Duties and Responsibilities
ProCal-Track Fast, Efficient Goods Inwards With Barcode Scanning Support.
AZ Food Handlers Card. Why do you need it? Jobs in food industry Shows that you already know food safety basics Industry certification.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Assignment 5.5 How Do You Handle Being Asked Something That Is Not In Your Job Description.
Company CATALDI sas Localization:ZA Girouflat MARMANDE – France Created since : 1976 Director :M. CATALDI Mario Tél : +33(0) Mail :
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
MUTIA NISRINA SARI JOB ANALYSIS. DEFINITION OF JOB ANALYSIS Job analysis is the process of collection and examination of work activities.
Auditing CRB Competency
Human Resources - Recruitment
+91 –
GeoMesh Blockchain Networking - Slide Presentation
backup slide presentation
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Welding Certification
ולידציה מול כיול-השונה והדומה
Cards Cards
CERTIFICATION: SBEN MEMBERSHIP ~ ISO CERTIFICATION 9001 & 14001
Job Analysis A systematic procedure for studying jobs to determine their various elements and requirements Job description A list of the elements that.
ПОЛИТИКА ПО КАЧЕСТВОТО НА МУ – ПЛЕВЕН
PARENT PORTAL PLEASE CONTACT GUIDANCE IF YOU NEED HELP ACCESSING OR NAVIGATING THE PORTAL.
SENSE Completion Process
(Credentialing Opportunities On-Line)
(Credentialing Opportunities On-Line) Elements 7-10
WELDING SYMBOLS. Need of welding symbols  The welding symbols used nowadays are considered shorthand for the welder.  Developing a clear means of communication.
Why are some things attracted to magnets and some are not?
C 101 SAMPLE SLIDES PART -2.

This is my sheet And this is my sheet.
ISO 13485:2003 Requirements that overlap with ISO 9001
Career Title Name.
Cell Molecule Atom + H O A cell is the basic unit of life.
Intermittent Fillet Welds
Presentation transcript:

PROJECT MANAGEMENT PROJECT MANAGEMENT

PLANNING - PROGRESS

PROGRESS LIST/line N°

FULL TRACEBILITY 1.ISO drawing 2.Welding log sheet 3.Certificate of the welder 4.Material certificate 5.Welding Procedure Specification 6.NDO Report 1.ISO drawing 2.Welding log sheet 3.Certificate of the welder 4.Material certificate 5.Welding Procedure Specification 6.NDO Report

WELDING LOG SHEET Number of iso & welding seam

ISO DRAWING

WELDING LOG SHEET Certificate of the welder

Welder performence qualification record

WELDING LOG SHEET WPS

Welding Procedure Specification

WELDING LOG SHEET Material certificates

WELDING LOG SHEET NDE report

QUAUITY PLAN

TEST report

JOB DESCRIPTION