1 Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008.

Slides:



Advertisements
Similar presentations
Understanding Student Learning Objectives (S.L.O.s)
Advertisements

1 CDM Study October 19, 2011 Stan But Manager, Economics & Load Forecasting.
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Timeline and Product Development Aug-Oct 2007Recovery Plan completed and adopted Recovery Plan Adaptive Management Framework developed and adopted.
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Science Subject Leader Training
1 of 20 Information Dissemination Audiences and Markets IMARK Investing in Information for Development Information Dissemination Audiences and Markets.
1 In-depth Evaluation of R&D Programs – how could it be accountable? Seung Jun Yoo, Ph.D. R&D Evaluation Center KISTEP, KOREA Symposium on International.
Medium-term strategic plan: planned financial estimates for the period E/ICEF/2009/AB/L.5.
TFI recommendation for communication Polio/EPI Results from the follow-up consultation on Polio/EPI indicators Paryss Kouta, UNICEF WCARO Dakar - Senegal,
The Africa Action Plan An IEG Evaluation CSO Forum April 15, 2011.
The Regulatory Impact Analysis Statement (RIAS) in Canada
European Union Cohesion Policy
The ADQ Adventures of LFV by Roger Li, Group Manager AIM 28th of May, Brussels.
Human Performance Improvement Process
1 Establishing Performance Indicators in Support of The Illinois Commitment Presented to the Illinois Board of Higher Education December 11, 2001.
Air Permitting : Process Improvement Kaizen Event June 4 – 8, 2007 Transforming Government- the challenge and opportunity of the 21st century.
August 6, 2008CLF / VPIRG 1 Energy Efficiency Budget Justification for Significant Increase in Energy Efficiency Utility Budget.
1 Comments for Workshop on EEU Budget for August 6, 2008.
1 Child Care Resource and Referral (CCR&R): FY 13 Contract Renewal Proposal Summary Presentation January 2012.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Cross-National Survey of School Principal Daniel Pop Education Support Program Open Society Institute.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
Part 1 Marketing Dynamics
IBM Corporate Environmental Affairs and Product Safety
EMS Checklist (ISO model)
Draft Change Management Strategy Framework and Toolkit An Overview TAU Workshop: Vulindlela Academy (DBSA) 12 April 2012 Presenter: Dr Patrick Sokhela.
2009 Strategic Planning playbook
1 Looking at the TPBs Draft Participation Plan Presentation to the Transportation Planning Board July 18, 2007 Sarah Crawford Transportation Planner Department.
Information Technology Project Management – Third Edition
August 2012 EEO Workshop Series 2012 BlueScope Steel – Second Cycle Strategy and Case Studies Paul Wright Environment Manager Resource Efficiency & Climate.
1)List and briefly describe the three project quality management processes. Quality Planning: Identify which quality standards are relevant to project.
MARKETING INFORMATION AND RESEARCH
IHPA and the National Efficient Price (NEP) Independent Hospital Pricing Authority.
© WRI & WBCSD, 2010 Metropolitan Washington Council of Governments (COG) Recycling Committee Meeting March 18, 2010 Greenhouse Gas Protocol Product/Supply.
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
Chapter 1: What is Economics? Section 1
SAI Performance Measurement Framework
School District U-46 Elementary Language Arts Literacy Framework Survey Results Created and distributed by the District Teacher Leader Curriculum Liaisons.
How to commence the IT Modernization Process?
1 Functional Strategy – IS & IT Geoff Leese November 2006, revised July 2007, September 2008, August 2009.
1 Civil Service Reform Martin Donnelly Permanent Secretary.
The Rubric Reality Cobb Keys Classroom Teacher Evaluation System.
1 PAB PRESENTATION TO CG 16 th October 2003 Organizational issues Organizational issues  PAB: Role & Function Membership & Rotation Membership & Rotation.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Week 1.
1 Phase III: Planning Action Developing Improvement Plans.
Relevant Costs for Decision Making
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE
Charting a Sustainable Future: Marshall University Vision 20/20 Campus Conversation October 6, 2014 Service Portfolio Review.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Richard Forrest Alterant Strategies Group Paul P. Travalini CPT ASTD Inland Empire Chapter April 21, 2008 “Hey, Why Doesn’t It Do That?”
Measuring Value: Using Program Evaluation to Understand What’s Working -- Or Isn’t Juliana M. Blome, Ph.D. , MPH Office of Program Analysis and Evaluation.
Evaluating Educator Impact on Student Learning M.A.S.S. Midwinter Meeting March 17, 2015 DRAFT FOR DISCUSSION PURPOSES.
Oregon State Library Transformation Project Launch
Chapter 6 Measuring Indicators
Network Customer Meeting Access Metric Update November 16, 2006.
Lyndonville Electric Department Feasibility Analysis Review December 2,
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Act 61 Increased Investment and Savings Scenarios Bounding Scenarios December 26, 2005.
Behavior Modification Report with Peak Reduction Component
Presentation transcript:

1 Evaluation Plan for Geotargeted Efficiency Programs November 19, 2008

2 Describe draft plan – EVT/DPS collaboration (as requested) Gather feedback from this group – Reality Check – Ideas for improvement Purpose of this presentation

3 Evaluation Purpose Proof of concept – What level of savings can targeted EE deliver? – How fast? How much does it cost? – Are savings delivered to constrained circuits? How? – Through Process Evaluation – Verification of Savings Claims – Correlation of savings to the constraint in question

4 Not the Purpose! The Evaluation will NOT determine if a particular transmission or distribution investment has been deferred or avoided – (but results can help!)

5 DPS getting help (Phew!) Plan to hire a contractor – EEU Evaluation Budget Contractor to help develop selected areas of evaluation Kick off meeting where work plan is discussed

6 Evaluation Boundaries Four Original Geotargeted Areas – Southern Loop – North Chittenden – St. Albans – Newport/Derby 18 months of program activity – June/July 2007 – December 2008 Leverage DPS ongoing evaluations

7 Five-piece evaluation framework Target area selection, collaboration efforts Program implementation Savings verification Correlation of savings results at constraint Long term evaluation

8 Target Selection Process Eval Goal: Increase confidence that selected areas have undergone robust review Review and make recommendations as to – Broad process including all parties – Development of Target area proposals DPS Contractor/Surveys/Spring 2009

9 Target Selection Process Eval How were the original target areas chosen? How did information barriers and time constraints affect the choices made? What are perspectives of key parties regarding process & communication?

10 Implementation Process Eval Goal: Reflection to help inform decisions – Program design and implementation process – How overall budgets are best utilized DPS Contractor/Surveys/Spring 2009 – Surveys of EVT/Customers & Trade Allies/etc.

11 Implementation Process Eval What were lessons learned? – How were contract goals set and did they affect program design? – Are there opportunities to improve effectiveness? How did GT focus affect statewide delivery of efficiency resources? Were lost opportunities created?

12 Savings Verification Goal: Verify EVT GT Savings in each targeted area Current DPS Contractor June/July 2009 Researchable questions include: – How do GT area savings compare w/ non-GT? MWh and MW savings, cost/kWh, TRB, etc. – Are GT interventions a ‘no regrets’ strategy?

13 System Impact Evaluation Goal: Determine EE savings correlation to particular circuit DPS Contractor - Analysis of Utility & Verification data – What is available? July - October 2009

14 System Impact Evaluation What are trends shown by substation data analysis? – Before/during/after implementation of GT services? – Compared to forecasted load growth? Is it possible to detect GT impacts at substation level? Were there other influences that significantly affected circuits positively or negatively?

15 Long-term evaluation questions Not necessarily answered in the next year or by this process What is correlation between savings at ISO peaks vs. local/VELCO peaks? How do we verify current T&D capacity assumptions and track any deferral decisions? What additional information is necessary to help assess effectiveness of GT programs? Others?

16 The End Thoughts/Ideas/Questions? THANK YOU! TJ Poor Department of Public Service