Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Objectives Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact and.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Italian Good Practice Projects Michela Arnaboldi and Giovanni Azzone
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Electricity and Magnetism
Year 6 mental test 5 second questions
ZMQS ZMQS
1 Heinrich Müller Maschinenfabrik GmbH HMP Umformtechnik GmbH 1 Heinrich Müller Maschinenfabrik GmbH HMP Umformtechnik GmbH Incremental forming Radial.
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Electric Bus Management System
ABC Technology Project
© S Haughton more than 3?
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
Settlement Program Logic Model
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Week 1.
We will resume in: 25 Minutes.
ISO 9001:2008 Co. Manufacturers & Exporters of Hydraulic Tank Jacking Equipments, Power Packs & Vacuum Boxes.
1 Unit 1 Kinematics Chapter 1 Day
TASK: Skill Development A proportional relationship is a set of equivalent ratios. Equivalent ratios have equal values using different numbers. Creating.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Institut für Verbundwerkstoffe GmbH Erwin-Schrödinger-Str Kaiserslautern Germany 1© Institut für Verbundwerkstoffe GmbH, N.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
The integration of 420 m detectors into the LHC
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
News and Introduction from CERN June 15th, 2005
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Update of cryogenic activities
From Design to Installation courtesy R. Folch S. Atieh TS / MME
The 11T cryo-assembly: summary of design and integration aspects
UK RFD Pre-Series cryomodule
Design of Distribution Feedbox at LHC P7
Magnetic shielding and thermal shielding
Status of QQXF cryostat
Presentation transcript:

Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN TS/MME

2 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 CONTENT Mechanical design & construction Key capabilities of CERN TS/MME 2. CONSTRUCTION1. DESIGN 3. CONCLUSION FP420 versus DFB ATM Pre-design Version #1 Pre-design Version #2 Mechanical analysis Pre-design Version #3 Open issues Advantages with CERN TS/MME Required framework conditions Main processes involved Schedule and possible lead times Cost drivers DFB ATM assembly experience

3 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 FP420 versus DFB ATM Continuity of the X and C lines Higher contraction of the busbar lines Fixed point to be relocated Longer interconnection bellow length Detector constraints (accessibility, precision) Radiation shielding Arc Termination Module Distribution Feed Box FP420 Cryostat

4 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Pre-design Version #1 Dipole cold foot to replace compensation system Couple two DFB ATM Allow contraction of the BB line

5 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Pre-design Version #2 Redesigned supporting beam Double cold feet to free space for line X

6 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Version #2 – Displacement analysis VACUUM CONDITION

7 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Version #2 – Displacement analysis VACUUM CONDITION + INTERCONNECTION at cold (operation conditions)

8 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Version #2 – Reaction analysis Bellow force - 10’000 N Reaction z - 32’500 N Reaction y 55’000 N Reaction z 70’000 N Cold condition (vacuum, bellow force)

9 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Pre-design Version #3 Two lowered supporting beams One single piece

10 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Version #3 – Open issues & next steps Detector supported by the cryostat: need to deal with movements during cooling down and operation Need of additional central fixed point and supporting jack Use the transport buggies and the lifting beams of the DFBAs Pre-design v#3 approval awaited

11 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Construction – Processes involved Machining (both heavy and accurate) Sheet metal forming (vacuum tanks, piping) MIG/TIG welding Thermal treatments / Surface treatments Mechanical fitting (Beam screen integration) Metrology / Alignment Vacuum test / x-Ray inspection Thermal super-insulation Electrical insulation assembly and test

12 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Schedule projection attempt Green light needed on time to allow the design work to start The production cannot start before the design is fully approved

13 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Cost drivers – What helps cutting them Re-use existent designed parts (cold feet, jacks, dished heads, etc) Experienced and multi-skilled workforce Avoid specific tooling Optimize the logistics between operations

14 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 CERN TS/MME experience on DFB ATM Design and mechanical analysis Full production and assembly of 16 ATM Budget and time constraints sealed in a interdepartmental workpackage agreement  Results: Early deliveries and costs below expectations after the 3 first units  Results: Early deliveries and costs below expectations after the 3 first units Arc Termination Module Distribution Feed Box

15 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Shuffling Box assembly

16 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Welding of the dished heads

17 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Cryostating of the Shuffling Module

18 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Thermal Super-insulation

19 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Final assembly

20 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 DFBA (ATM & HCM) Transport

21 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Conclusions Advantages with CERN/TS/MME – Design and construction synergy benefits – Shortened learning curve (skilled resources and appropriate equipment available) – Highly responsive multi-technological environment – Reduction of the logistics time and cost – Design and construction traceability (CDD/ EDMS / MTF) Required framework conditions – Obtain the formal approval of the pre-design – Obtain the final version of the technical specification – Adopt a workpackage oriented approach combining the mechanical design and the construction

22 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 The CERN TS/MME Mechanical and Materials Engineering group received the Golden Hadron Award (LHC best suppliers) Fair and efficient partnership with CERN Member States (here: Bulgaria)

23 / 23 FP420 Connection Cryostat FP420 Manchester Workshop - December 2006 Thanks for their contribution … Utilisation des ATM pour le projet FP420 - EDMS – Thierry Renaglia Use of the ATM for the FP420 Project EDMS – Thierry Colombet General information from the TS/MME ATM assembly team (Said Atieh, Laurent Préver-Loiri, Didier Lombard, and al.) …and thanks for your attention.