© 2007 Pearson Education Financial Analysis Supplement J.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Chapter 03: Mortgage Loan Foundations: The Time Value of Money
Analysis of Financial Statements
Time Value of Money Concepts
EuroCondens SGB E.
Worksheets.
Chapter 16: Depreciation
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
STATEMENT OF CASH FLOWS
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
CALENDAR.
1 1  1 =.
Questions and Problems
Chapter 11 Cash Flow Estimation
Capital Budgeting Problems
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
PP Test Review Sections 6-1 to 6-6
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Look at This PowerPoint for help on you times tables
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Chapter 4: Time Value of Money
The Time Value of Money.
1 Chapter 2 Time Value of Money. 2 Time Value Topics Future value Present value Rates of return Amortization.
Capacity and Constraint Management
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
Time Value of Money Concepts
Capital Budgeting : Part I Investment Criteria
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Sprayer Economics Gary Schnitkey University of Illinois.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
1..
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Present value, annuity, perpetuity
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
CHAPTER 12 Cash Flows and Other Topics in Capital Budgeting.
The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin CHAPTER 10 Planning for Capital Investments.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
: 3 00.
5 minutes.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Time Value of Money Chapter 5  Future Value  Present Value  Annuities  Rates of Return  Amortization 5-1.
Chapter 2, Problem 1. Find the correct numerical value for the following factors from the interest tables. 1. (F/P,8%,25) 2. (P/A,3%,8) 3. (P/G,9%,20)
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
F – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Financial Analysis F For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Financial.
Financial Analysis Supplement F Copyright ©2013 Pearson Education, Inc. publishing as Prentice HallF- 01.
Presentation transcript:

© 2007 Pearson Education Financial Analysis Supplement J

© 2007 Pearson Education Future Value of an Investment F = P(1 + r) n where F=future value of the investment at the end of n periods P=amount invested at the beginning, called the principal r=periodic interest rate r=number of time periods for which the interest compounds The value of an investment at the end of the period over which interest is compounded.

© 2007 Pearson Education Application J.1 Future Value of a $500 Investment in 5 Years 500(1 +.06) 5 = 500(1.338) = $669.11

© 2007 Pearson Education Present Value of a Future Amountwhere F=future value of the investment at the end of n periods P=amount invested at the beginning, called the principal r=periodic interest rate (discount rate) r=number of time periods for which the interest compounds P = F (1 + r) n The amount that must be invested now to accumulate to a certain amount in the future at a specific interest rate.

© 2007 Pearson Education Application J.2 Present Value of $500 Received in Five Years 500 / = $373.63

© 2007 Pearson Education Present Value Factors P = = F F (1 + r) n 1 1 = present value factor (or pf)

© 2007 Pearson Education Present Value Factors (pf) Present Value Factors for a Single Payment Number of Interest Rate (r) Periods (n)

© 2007 Pearson Education Present Value Factor (pf) for Application J.2

© 2007 Pearson Education Application J.2 using the pf Factor

© 2007 Pearson Education Annuities P = + + … F (1 + r) n F (1 + r) n+1 or P = A (af) where P = present value of an investment A = amount of the annuity received each year af = present value factor for an annuity A = amount of the annuity received each year af = present value factor for an annuity A series of payments on a fixed amount for a specified number of years.

© 2007 Pearson Education Present Value Factors (af) Present Value Factors of an Annuity Present Value Factors of an Annuity Number of Interest Rate (r) Periods (n)

© 2007 Pearson Education Present Value Factor (af) for Application J.3 Interest Rate (r) (n)

© 2007 Pearson Education Application J.3 P = A (af) A = $500 for 5 years at 6% af = (from table) P = 500(4.2124) = $2, Present Value of a $500 Annuity for 5 Years

© 2007 Pearson Education Straight-Line Depreciation D = I – S n where D= annual depreciation I= amount of investment S= salvage value n= number of years of project’s life

© 2007 Pearson Education Modified Accelerated Cost Recovery System (MACRS) 3-year class:tools and equipment used in research 5-year class:autos, copiers, and computers 7-year class:industrial equipment and office furniture 10-year class:longer-life equipment

© 2007 Pearson Education Modified Accelerated Cost Recovery System (MACRS) 3-year class:tools and equipment used in research 5-year class:autos, copiers, and computers 7-year class:industrial equipment and office furniture 10-year class:longer-life equipment Class of Investment Year3-Year5-Year7-Year10-Year %100.0%100.0%100.0% Modified ACRS Depreciation Allowances Modified ACRS Depreciation Allowances

© 2007 Pearson Education Example J.1 Calculating After-Tax Cash FlowsYEAR ITEM Initial Information Annual demand (salads)11,00011,00011,00011,00011,000 Investment$16,000 Interest (discount) rate0.14 Cash Flows Revenue$38,500$38,500$38,500$38,500$38,500 Expenses: Variable costs22,00022,00022,00022,00022,000 Expenses: Fixed costs8,0008,0008,0008,0008,000 Depreciation (D)3,2005,1203,0721,8431, Pretax income$5,300$3,380$5,428$6,657$6,657– $922 Taxes (40%)2,1201,3522,1712,6632,663– 369 Net operating income (NOI)$3,180$2,208$3,257$3,994$3,994– $533 Total cash flow (NOI + D)$6,380$7,148$6,329$5,837$5,837$369 Local restaurant considering the addition of a salad bar:

© 2007 Pearson Education Example J.2 Calculating NPV 2009:$6,380(0.8772)=$5, :$7,148(0.7695)=$5, :$6,329(0.6750)=$4, :$5,837(0.5921)=$3, :$5,837(0.5194)=$3, :$369(0.4556)=$168 NPV = ($5,597 + $5,500 + $4,272 + $3,456 + $3,032 + $168) – $16,000 NPV = $6,024

© 2007 Pearson Education Example J.2 Calculating IRR 2009:$6,380(0.8772)=$5, :$7,148(0.7695)=$5, :$6,329(0.6750)=$4, :$5,837(0.5921)=$3, :$5,837(0.5194)=$3, :$369(0.4556)=$168 NPV = ($5,597 + $5,500 + $4,272 + $3,456 + $3,032 + $168) – $16,000 NPV = $6,024 IRR by Trial and Error Discount RateNPV 14%$6,025 18%$4,092 22%$2,425 26%$977 30%– $199 28%$322

© 2007 Pearson Education Example J.2 Calculating Payback PeriodYEAR ITEM Initial Information Annual demand (salads)11,00011,00011,00011,00011,000 Investment$16,000 Interest (discount) rate0.14 Cash Flows Revenue$38,500$38,500$38,500$38,500$38,500 Expenses: Variable costs22,00022,00022,00022,00022,000 Expenses: Fixed costs8,0008,0008,0008,0008,000 Depreciation (D)3,2005,1203,0721,8431, Pretax income$5,300$3,380$5,428$6,657$6,657– $922 Taxes (40%)2,1201,3522,1712,6632,663– 369 Net operating income (NOI)$3,180$2,208$3,257$3,994$3,994– $533 Total cash flow (NOI + D)$6,380$7,148$6,329$5,837$5,837$369 Payback Period Add after-tax cash flows to get as close as possible to without exceeding the initial investment ($16,000) $6,380 + $7,148 = $13,528(2009 and 2010) $16,000 – $13,528 = $2,472(remainder for 2010) $2,472/$6,329 = 0.39(portion of 2010 required) Payback Period = 2.39 years

© 2007 Pearson Education OM Explorer Financial Analysis Solver Salad Bar example:

© 2007 Pearson Education NPV for Project Application J.4 Year 1: $500 Year 2: $650 Year 3: $900 The discount rate is 12%, and the initial investment is $1,550, so the project’s NPV is: Present value of investment (Year 0): ($1,550.00) Present value of Year 1 cash flow: Present value of Year 2 cash flow: Present value of Year 3 cash flow: Project NPV: $ 55.20

© 2007 Pearson Education IRR for Project Application J.5

© 2007 Pearson Education Payback Period for Project Application J.6