WMO SPICE Weissfluhjoch Site Configuration Update Oct 10 th, 2012 Information from Yves-Alain Roulet Prepared by Rodica Nitu.

Slides:



Advertisements
Similar presentations
ConcepTest 1 Series Resistors I
Advertisements

IBM Industry Security Electric Sector Security Awareness Rising
© 2007 Pearson Prentice Hall This work is protected by United States copyright laws and is provided solely for the use of instructors in teaching their.
Updated China's 5GHz Spectrum Regulation
© Crown Copyright Source: Met Office Dale Barker, Tomas Landelius, Eric Bazile, Francesco Isotta, Phil Jones 17 April 2013 EURO4M – WP2: Regional.
The WMO Vision for Global Observing Systems in 2025 John Eyre, ET-EGOS Chair GCOS-WMO Workshop, Geneva, January 2011.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Barbara J. Ryan Director, WMO Space Programme.
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
Ground-based FTIR Update CAVIAR Meeting NPL, 29 th September 2010 Tom Gardiner, Marc Coleman.
TECO-2006, 4 dec 2006, Geneva Abteilung Messnetze und Daten Building and Operating a Station Network for Climatology and Hydrology K. Klapheck, S. Alsen,
Boulder,March 11 st 2010 Proposal for a site assessment IEC standard IEC/TC88 Boulder meeting Millán Esteban - SC88 Spanish mirror committee.
WELCOME! Meridian Township Data Review Jan 25,
Problem # Problem #
Regional Preparatory Workshop for the ITU WRC-2015
Drive Right Chapter 3 Basic Vehicle Control
The North American Monsoon System: Recent Evolution and Current Status Update prepared by Climate Prediction Center / NCEP 11 June 2012.
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
ET-ABO 1 st Session th September 2013, WMO, Geneva Commission for Instruments and Methods of Observation (CIMO) Task Team – Aircraft-based Observations.
WMO SPICE Bratt’s Lake (Canada) Site Configuration Update Oct 10 th, 2012 Information from Craig Smith Prepared by Rodica Nitu.
WMO SPICE Volga (Russia) Site Configuration Update Oct 10 th, 2012 Information from Arkadi Koldaev Prepared by Rodica Nitu.
WMO SPICE Haukeliseter (Norway) Site Configuration Update Oct 11 th, 2012 Information Provided by Mareile Wolff Prepared by Rodica Nitu, updated by Mareile.
WMO SPICE Sodankyla (Finland) Site Configuration Update Oct 10 th, 2012 Information from Osmo Aulamo and Timo Laine Prepared by Rodica Nitu.
WMO SPICE Marshall (USA) Site Configuration Update Oct 10 th, 2012 Information from Scott Landolt Prepared by Rodica Nitu.
RMDCN status & plan,February Agenda  RMDCN Configuration  RMDCN Next Generation  Migration.
WMO SPICE Tapado (Chile) Site Configuration Update Oct 10 th, 2012 Information from Shelley MacDonell Prepared by Rodica Nitu.
WMO SPICE Guthega Dam (Australia) Site Configuration Update Oct 10 th, 2012 Information from Shane Bilish Prepared by Rodica Nitu.
IOC SPICE - 3 Chair Report Rodica Nitu Brussels Oct 15, 2012.
WMO SPICE: CARE (Canada) - Site Configuration Update - Oct 10, 2012 Prepared by Rodica Nitu.
WMO SPICE Hala Gąsienicowa(Poland) Site Configuration Update Oct 10 th, 2012 Information from Maciej Karzyński Prepared by Maciej Karzyński.
WMO SPICE Caribou Creek (Canada) Site Configuration Update Oct 10, 2012 Information from Craig Smith Prepared by Rodica Nitu.
Craig Morris Petite Planète Ukraine’s Energy Future Sep 13, 2012 “Energiewende” The German energy transition – what can other countries.
NS3040 U.S. China GDP Comparisons Summer Term, 2014.
8th EIONET Workshop AQ,Oslo 1 06 Nov ‘03 EoI 2003 EoI Report Upload process DEMv7.
Antarctic automatic weather station field plans Jonathan Thom, Matthew Lazzara, George Weidner, Linda Keller, John Cassano.
Church Finances July Financial Update financial year summary for general account Building fund income and expenditure to date Projection.
World Meteorological Organization Working together in weather, climate and water Snowfall Measurement Challenges WMO SPICE Solid Precipitation Intercomparison.
Field experiment on the effects of a nearby asphalt road on temperature measurement Mariko Kumamoto 1, Michiko Otsuka 2, Takeshi Sakai 1 and Toshinori.
WMO Intercomparison of Instruments and methods for the Measurement of Solid Precipitation and Snow on the Ground, WMO-SPICE: Pre-SPICE Studies R. Rasmussen(1)
Monitoring the hydrologic cycle in the Sierra Nevada mountains.
1 QUALITY MANAGEMENT, CALIBRATION, TESTING AND COMPARISON OF INSTRUMENTS AND OBSERVING SYSTEMS WMO TECHNICAL CONFERENCE ON METEOROLOGICAL AND ENVIRONMENTAL.
Instrumentation: ground and noise Temperature Measurement.
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
Solar Panels: Our Challenge
A Monitoring Program for Ny-Ålesund Christina A. Pedersen Norwegian Polar Institute.
WMO I NTERCOMPARISON OF I NSTRUMENTS AND M ETHODS FOR THE M EASUREMENT OF S OLID P RECIPITATION AND S NOW ON THE G ROUND (WMO SPICE) O RGANIZATION OF THE.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
1. Sensor Classification System Canadian Version: Siting Classification Rodica Nitu.
Documentation of surface observation. Classification for siting and performance characteristics Michel Leroy, Météo-France.
The NOAA/FAA/NCAR Winter Precipitation Test Bed: How Well Are We Measuring Snow? t Roy Rasmussen 1, Bruce Baker 2, John Kochendorfer 2, Tilden Myers 2,
The NOAA/FAA/NCAR Winter Precipitation Test Bed: How Well Are We Measuring Snow? t Roy Rasmussen 1, Bruce Baker 2, John Kochendorfer 2, Tilden Myers 2,
CIMO Survey National Summaries of Methods and Instruments Related to Solid Precipitation Measurement at Automatic Weather Stations - Very Preliminary results.
Russian proposals to Scientific program of Hydrometeorological observatory in framework of meteorological and radiation measurements (prepared by A. Makshtas)
Alaska, My Thoughts. Alaska Improvements Wind Power to be added at Selawik and one other site, either Deadhorse or King Salmon LVD modified.
Flying Wire Update Feb 4, TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.
Computer Engineering and Networks Technische Informatik und Kommunikationsnetze PermaSense Technology L1 D-GPS Sensors Jan Beutel with Stephan Gruber,
Cassini Archive Tracking System (CATS) Report Engineering Node November 30, 2006
Introduction to Sensors and Calibration Factors. Choosing a suitable recording range on a data logger Logger will have several range options: e.g. -10.
WMO CIMO Survey National Summaries of Methods and Instruments for Solid Precipitation Measurement - Preliminary results - R Nitu Meteorological Service.
H U N T S V I L L E, A L A B A M A COOP Modernization Efforts Jason Elliott NWS Huntsville October 24, 2006.
Quantifying Uncertainty and Biases in Automated Precipitation Measurements John Kochendorfer, Bruce Baker, Tilden Meyers and Mark Hall NOAA/ATDD Roy Rasmussen,
World Meteorological Organization Working together in weather, climate and water Site Classification C. Bruce Baker, NOAA Vice President of CIMO WMO; Name.
 Renewable energy is energy which comes from natural resources such as sunlight, wind, water, and geothermal heat, which are renewable within a REASONABLE.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
Adjustment of Global Gridded Precipitation for Systematic Bias Jennifer Adam Department of Civil and Environmental Engineering University of Washington.
Mini SCADA System for Monitoring PV and Wind-Installation in Meteorology stations Prepared By: Ahmad Khalil Mohammad Sayeh Supervisor: Dr. Imad Ibir
Malwarebytes Configuration Support Number
Chapter 10, Lesson 3 Atmosphere and Air Temperature
On the accuracy of precipitation measurements in the Arctic
Environment, Natural Resources Conservation and Tourism
Presentation transcript:

WMO SPICE Weissfluhjoch Site Configuration Update Oct 10 th, 2012 Information from Yves-Alain Roulet Prepared by Rodica Nitu

Site Commissioning Anticipated date of commissioning: Expected status on commissioning: References (where applicable): –R2:Pluvio2 in DFIR with Alter Shield at 3.50 m above ground –R3:Pluvio2 outside DFIR with Alter Shield at 3.50 m above ground –R3:Pluvio2 outside DFIR without Alter Shield at 3.50 m above ground Instruments under test: –Provided by the host: –From Instrument Providers: Belfort at 3.50 m above ground, Geonor at 3.50 m above ground, Thies Precipitation Monitor at 2 m above ground Instruments for Ancillary Measurements: Wind at several heights, temperature at 2 m above ground, solar radiation, webcam

Site Update Gaps for the winter 2012/2013: –intended SPICE test/activities which may not take place, as anticipated during the 2012/13 season; Installation of the instruments under test –reasons: Lack of resources and time before winter starts –activities postponed for 2013: Hopefully none, if any then installation of some instrument under test Data archive; –Data will be stored in MeteoSwiss database, and transferred to NCAR as well –Frequency of data transmission, site to archive: 10 min Additional Information: –The DFIR should be mounted until Oct 25. Installation of the sensors, incl. wiring will take place in parallel. Production of metal mast and Alter Shield are still ongoing.

Weissfluhjoch Oct 2012 (courtesy B. Goodison)