Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Ohio Planning Conference Organizing for Reliability – A State Perspective.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Benchmarks and work plans
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Requirements Engineering Process
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Civics: Government and Economics in Action
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Oklahoma Strategic Highway Safety Plan presented to SHSP Leadership Group SHSP Working Group presented by Susan HerbelSam Lawton, Cambridge Systematics,
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
Gaining Senior Leadership Support for Continuity of Operations
John R. Kasich, GovernorJerry Wray, Director Ohio Department of Transportation Work Zone Speed Zones Dave Holstein/Reynaldo.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
1 Kentuckys Public Safety Awareness Initiative Program Coordination and Partnerships August 23, 2005.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director.
ABC Technology Project
Stronger health systems. Greater health impact. Proximal, Distal and Everything In Between: Measuring Organizational Capacity Presenter: Stephanie Calves,
2010 SACS-COC Annual Meeting December 6, 2010 CS-69 Administrative Program Review Assuring Quality in Administrative and Academic Support Units.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
1 Developing Tests for Departmental Assessment Deborah Moore, Assessment Specialist Institutional Research, Planning, & Effectiveness University of Kentucky.
Identifying Our Own Style Extended DISC ® Personal Analysis.
1 DELAYED LAST STATE AID - BORROWING PROCESS
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
Visual 8.1 Course Summary Unit 8: Course Summary.
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Kansas City 511 Kansas City ITS Symposium May 6, 2009 Presented by: Barb Blue, ATIS/511 Program Manager Kansas Department of Transportation (KDOT)
ARL 1 Library Publishing Services: New Opportunities for Research Libraries Karla Hahn ARL Office of Scholarly Communication ARL May Membership Meeting.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
To Create and Sustain a Career Pathway. CTE Works! Summit November 13, 2014.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
Competency Management Defining McGill’s Competency Directory MANAGEMENT FORUM JUNE 7, 2005.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
1 A CASE STUDY: Organization and Workforce for Operations at Maryland State Highway Administration Glenn McLaughlin, Deputy Director Office of CHART and.
MATOC Trial Phase Dec 2008 to Jun 2009 Presentation to the Transportation Planning Board Richard W. Steeg, PE Chair MATOC Steering Committee VDOT Regional.
TSMO Program Plan Development Roundtable
Regional Operations Forum Setting the Stage
Presentation transcript:

Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Ohio Planning Conference Organizing for Reliability – A State Perspective – Session 2D July 15, 2014 Dave Holstein, Administrator ODOT Office of Traffic Operations

2 TSM&O Strategies Organizing for Reliability - A State Perspective

3 What TSM&O Do We Do Now? TSMO Strategies: Work Zone Management Incident Management Special Event Management Road Weather Management Service Patrols Traveller Info Signal Coordination Organizing for Reliability - A State Perspective

4 TSM&O Strategies: Regional Operations Transit Priority Ramp Management Managed Lanes Connected Vehicles OTHERS??? – This will be a key question in a minute. Organizing for Reliability - A State Perspective What TSM&O Do We Do Now?

5 TSM&O Funding Organizing for Reliability - A State Perspective

6 How is TSM&O Funded? Well….. In Central Office we request $$ for projects that we think needs to be done. In Districts – there are no TSM&O funds. Everything just part of other budget line items. Organizing for Reliability - A State Perspective

7 TSM&O Collaborations Organizing for Reliability - A State Perspective

8 Who Do We Work With on TSM&O?? Well …… Planning – Safety Program quite a bit Construction – Spec committee; APL Engineering – Review some plans; quite a bit on standards, signals and work zones. Districts – Especially w/Highway Management. Locals/MPO’s – As necessary but not that often. Emergency Responders – Via OEMA/TMC Summary – Fair amount of collaboration but it just sort of evolved over time. Organizing for Reliability - A State Perspective

9 Organizational Structure Organizing for Reliability - A State Perspective

10 Organizational Structure Central Office Division of Operations: Office of Traffic Operations; Office of Maintenance Administration; Office of Aviation Districts Organized Around: Engineering (Planning/Design); Construction; Maintenance Organizing for Reliability - A State Perspective

11 TSM&O Plan Organizing for Reliability - A State Perspective

12 Where Do We Want To Be In 5 Years?? This is PRECISELY the point: ITS, signals, field devices, software, information dissemination, maintenance needs, number of programs, data applications, EVERYTHING (except staff size) has grown at a break neck pace. Constant “fire drill” to just do what you have to do. Working in “Real-Time” with not much time left to think about the long term future. Organizing for Reliability - A State Perspective

13 Core functions - just evolved over time; Collaborations - similarly evolved often times based on personal relationships; Funding - requested “in real-time” as we need it. No formal long term plan - wait a minute…………. Organizing for Reliability - A State Perspective Where Do We Want To Be In 5 Years??

14 WE NEED A PLAN!!!! Organizing for Reliability - A State Perspective Where Do We Want To Be In 5 Years??

15 WE NEED A PLAN!!!! Organizing for Reliability - A State Perspective Where Do We Want To Be In 5 Years??

16 The Plan Won SHRP2 “Organizing for Reliability” Grant Completed Facilitated Self Assessment Strengths & Improvement Opp’s Identified Organizing for Reliability - A State Perspective

17 With our improvement opportunities identified ODOT is required to create a plan to make them strengths. General Improvement Areas Are: 1.Developing a Plan; 2.Making the business case for Operations; 3.Systems and Technology; 4.Organization & Staffing. Organizing for Reliability - A State Perspective The Plan

18 Rather than just address some weaknesses of what we are currently doing we decided to do a LOT more. We are going to look at everything…. Organizing for Reliability - A State Perspective The Plan

19 Internal / external stake holder group being formed to BENCHMARK high performing practitioners of Operations. C.O., Districts, County Engineers, Cities, MPO’s, etc. Organizing for Reliability - A State Perspective The Plan

20 Potential core functions will be identified and existing ones will be vetted. Organization, staffing, products and functions will be evaluated against the current best in the country. Organizing for Reliability - A State Perspective The Plan

21 Every facet of ODOT’s Operations (C.O. and Districts) will be compared and contrasted to the best practitioners in the Country. The Stakeholder group will make recommendations to ODOT Executive Management that are unconstrained by our current limitations & practices (budget, collaborations, staffing, core functions, T.O.’s, EVERYTHING) Organizing for Reliability - A State Perspective The End Game

22 Those recommendations accepted by ODOT Executive Management will be memorialized in Ohio’s first long range TSM&O Plan. Goal is to be the premier operations program in the country. Organizing for Reliability - A State Perspective The End Game

23 We will learn from the best and add it to our own strengths in order to become the new standard of excellence in Operations. Very exciting – once in a lifetime/career opportunity. Organizing for Reliability - A State Perspective The End Game

24 Questions? Organizing for Reliability - A State Perspective