1 SMERA Accomplishment Report as of June 15, 2014 Number of Runs -Target based on proposals submitted -Accomplished based on post activity reports.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Números.
1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
/ /17 32/ / /
AP STUDY SESSION 2.
Reflection nurulquran.com.
1
EuroCondens SGB E.
Worksheets.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Job Order Costing Chapter 4.
Master Budget and Responsibility Accounting
Addition and Subtraction Equations
Ph.D. Completion and Attrition CGS Board of Directors December 4, 2007.
OPTN Modifications to Heart Allocation Policy Implemented July 12, 2006 Changed the allocation order for medically urgent (Status 1A and 1B) patients Policy.
David Burdett May 11, 2004 Package Binding for WS CDL.
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Prime and Composite Numbers. These are numbers that have only two factors – themselves and one. These are numbers that have only two factors – themselves.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Summative Math Test Algebra (28%) Geometry (29%)
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
The 5S numbers game..
1 Credit Cards Avoid the Minimum Payments Trap! 3% examples Revised November 2012.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Media-Monitoring Final Report April - May 2010 News.
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Progressive Aerobic Cardiovascular Endurance Run
Biology 2 Plant Kingdom Identification Test Review.
1..
Adding Up In Chunks.
FAFSA on the Web Preview Presentation December 2013.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
: 3 00.
5 minutes.
Numeracy Resources for KS2
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Let’s take a 15 minute break Please be back on time.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Numerical Analysis 1 EE, NCKU Tien-Hao Chang (Darby Chang)
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Doubling and Halving. CATEGORY 1 Doubling and Halving with basic facts.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

1 SMERA Accomplishment Report as of June 15, 2014 Number of Runs -Target based on proposals submitted -Accomplished based on post activity reports

1 Regions Total # of runs JanuaryFebruaryMarchAprilMayJuneTotal Target Accom plished Target Accomp lished Target Accomp lished Target Accomp lished Target Accomp lished Target Accomp lished Target Jan-June* Accomplished Jan-June ** NCR CAR Region Region Region Region 4A Region 4B Region Region Region Region Region Region Region Region CARAGA TOTAL * Based on proposal submitted **Based on the submitted Post Activity Reports. SMERA Accomplishment Report as of June 15, 2014

Status of MSMEDC Fund As of 15 June 2014 Amount

Status of MSMEDC Fund As of 15 June 2014 RegionBudget Allocation per region Funds Transferred May15 JuneTotal CAR 439,375130,62559,375190, ,375106,87547,500154, ,075101, ,204,695684,8500 4A 1,543,750510,6250 4B 481, , ,125106, ,242, , ,87583, ,516190, ,125308, ,602139,48088,760228,240 CARAGA 684, NCR 1,179,325012,000 TOTAL 11, , ,6352,570,480

Senator Legarda’s Fund Amount

Senator Legarda’s Fund Monthly Disbursement Region Target number of runs Fund Allocation Funds Transferred May* Funds to be transferred by July * Funds to be transferred by August * CAR7 833, ,000714,0000 4A7 834, , ,530140, , , TOTAL 425,000,0001,786,0003,073,530140,470 * Based on submitted proposals

SMERA Disbursement Schedule (June to December)

Region Budget Allocation per Region Monthly Disbursement Schedule* June 16-30JulyAugustSeptOctNovDec NCR 1,179,325290,960152,160139, ,160126,80063,400 CAR 439, ,985 10,040 REGION 1 534, ,87571,250106,87547,500 REGION 2 672,075101,440469,195 REGION 3 1,204,695202,880164,840126,80050,72076,08025,360 REGION 4A 1,543,750178,125166,250154,375118,750130,62559,375 REGION 4B** 481, REGION 5 595,925215,560198,64325,360 REGION 6 558,12559,37583,12559, ,50035,625 REGION 7 1,242,710418,440304,320139,480126,800101,440 50,720 REGION 8** 798, REGION 9 296,87559,37571,25023,75035,62523,750 REGION ,51651,600164,84063,40025,36038,040 REGION ,12547,500178,12559,37535,625 REGION ,602 83,125 59,375 CARAGA** 684, TOTAL 11,875,0001,625,2552,382,733945,770783,345781,510396,100114,120 SMERA Disbursement Schedule (June to December) * Based on submitted proposals ** No proposals submitted yet

SMERA 2014 Target Number of Runs (July-December) Number of Runs

RegionsTotal # of runsJulyAugustSeptemberOctoberNovemberDecemberTotal* NCR CAR Region Region 253 ** Region Region 4A Region 4B38 ** Region Region Region Region 863 ** Region Region Region Region CARAGA54 ** TOTAL SMERA 2014 Target Number of Runs (July-December)

SMERA 2014 Target versus Accomplishment

Regions 2014 Target # of MSME's Assisted Number of Runs TargetAccomplished% Accomplishment NCR 9, % CAR 4, % Region 1 5, % Region 2 5, % Region 3 9, % Region 4A 13, % Region 4B 3, % Region 5 4, % Region 6 5, % Region 7 9, % Region 8 6, Region 9 3, Region 10 3, % Region 11 6, % Region 12 4, % CARAGA 5, TOTAL96,5041, % SMERA 2014 Target versus Accomplishment

Thank You! BUREAU OF SMALL AND MEDIUM ENTERPRISE DEVELOPMENT 5/F, Trade and Industry Building, 361 Sen. Gil J. Puyat Avenue 1200 Makati City, Philippines Trunkline (632) Fax (632)