PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.

Slides:



Advertisements
Similar presentations
Building Construction and the Environment BOCAbocai.org BOCAbocai.org Building Officials and Code Administrators International, Inc. HUDhud.gov HUDhud.gov.
Advertisements

WBS-Construction of House (Example) WBS Dictionary
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
OPSM 639, C. Akkan1 Overview Planning Models Project planning determines what happens, when and how they happen. Since planning takes time and consumes.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
NEES Project Management Workshop June 16 June 18 1 Segment 3.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Jeopardy Game! Scope Management Time Management Integration Management.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Elisati Hulu. Definition  “a deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project.
ELC 347 DAY 7. Agenda Questions Assignment 3 Due Assignment #4 posted  Due next week Group Progress report due next week Exam 2 next week  Same format.
Project Management Session 7
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Primary Residential Design Considerations
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
CS 160: Software Engineering October 20 Class Meeting Department of Computer Science San Jose State University Fall 2014 Instructor: Ron Mak
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Project Management Education
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Work breakdown structure
Work Organization Methods and Schemes
Department of Industrial Engineering 1 Project Management Kim LaScola Needy, Ph.D., P.E., CFPIM University of Pittsburgh 1041 Benedum Hall Pittsburgh,
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Module 6 Session 6.1 Visual 1 Module 6 Preparing the Work Breakdown Structure (WBS), Responsibility Matrix, and Master Summary Schedule Session 6.1 Preparing.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Lecture 4 Title: The Scope Management Plan
Chap 4 Defining The Project.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Work Breakdown Structures
Work Breakdown Structure Kathy S. Schwaig. What is a Work Breakdown Structure (WBS)? A WBS is a logical hierarchy of work packages involved in a project.
The process of planning projects
Work Breakdown Structure Use and Demo
Estimating Project Times and Costs
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
1 DOKUZ EYLUL UNIVERSITY DEPARTMENT OF INDUSTRIAL ENGINEERING DEPARTMENT OF INDUSTRIAL ENGINEERING SUNAY CAN
Module 5 Session 5.3 Visual 1 Module 5 Refining Objectives, Scope, and Other Project Parameters Session 5.3 Preparing the Product and Process Structures.
WBS-Construction of House cont. Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept Earlier.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
PROJECT PLANNING AND SCHEDULLING
1 Project Management C13PM Session 5 Introducing Breakdown Structures Russell Taylor Business Department Staff Workroom
Steps to effective Project Planning.  Scope  Goals  Resources  Project Charter  Work Breakdown Structure (WBS)
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Project Management Planning Techniques
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Estimating and Scheduling CEE 492
SOW / Open Workbench By Wilmer Arellano Spring 2008.
WEEK 3 Project Planning.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Creating a Work Breakdown Structure with Microsoft Project.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
By Wilmer Arellano Spring 2010
Major Steps In Building a SFR
Universitas Komputer Indonesia
How Completed Interiors Are Achieved: Designing & Building
Chap 4 Defining The Project.
Universitas Komputer Indonesia
WBS-Construction of House (Example) WBS Dictionary
Minuteman Vocational Technical Regional High School Progress
Progress Report 11/10/11.
INTRODUCTION WORK BREAKDOWN STRUCTURE
GROUP MEMBERS:  Shakeel Ahmad Khalil 16-EC-35  Rehan Shakoor 16-CE-59  Usman Ali Munir 16-CE-103  Najib-ullah 16-CE-143  Faisal Ali 16-CE-163.
SD5953 Successful Project Management Work Breakdown Structure
Presentation transcript:

PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40

The Work Breakdown Structure is a tree structure, which shows a subdivision of effort required to achieve an objective. It could be a project, program or a contract. In WBS is achieved by starting with the end objectives and successively subdividing into manageable contracts in terms of size, duration and responsibility.

Basis for dividing work into definable agreements from which statement of work can be developed and technique, schedule, cost and labour hour reporting can be established. By this method we can easily calculated the costs attached with the planned actions. Helps in cost accounting.

The important rule of the WBS is the 100% rule which states that the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project. in a WBS oriented project it is not required to be action oriented because it does not require too many or too few actions. the best way to adhere to the 100% rule is to define WBS elements in terms of final outcomes or results.

The first is the "80 hour rule" which means that no single activity or group of activities to produce a single deliverable should be more than 80 hours of effort. The second rule of thumb is that no activity or series of activities should be longer than a single reporting period. Thus if the project team is reporting progress monthly, then no single activity or series of activities should be longer than one month long. The last heuristic is the "if it makes sense" rule. Applying this rule of thumb, one can apply "common sense" when creating the duration of a single activity or group

A WBS is neither a project plan, a schedule, nor a chronological listing. A WBS is not an organizational hierarchy. Some practitioners make the mistake of creating a WBS that shadows the organizational chart. WBS updates, other than progressive elaboration of details, require formal change control

The WBS for building masonry wall

WBS for a product outcome – bicycle

ACME Housing Corporation 1.1 New Home Construction Concrete Pour Foundation Install Patio Pour Stairway Framing Frame Exterior Walls Frame Interior Walls Install Roofing Trusses Plumbing

Install Water Lines Install Gas Lines Electrical Install Wiring Install Outlets/Switches Install Fixtures Interior Install Drywall Install Carpets Install Painting Roofing Install Vents