Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
4. What is the boundary between two drainage basins called?
Well Permitting & Approvals
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
State Waters and Stream Buffers
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
Storm Water Blue Ribbon Panel Recommendations to the California State Water Resources Control Board The Feasibility of Numeric Effluent Limits Applicable.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Buffers and Special Water Quality Protections
1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
To response to litigation, thirty Minnesota Cities were directed to perform antidegradation reviews or Loading Assessments for two time periods: (1) (1)
Antideg and Municipal Stormwater Discussion Sept. 23, 2009.
MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
Watershed Staff Videoconference October 17, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Duluth’s Storm Sewers Chris Kleist. Overview My background About Duluth Storm sewer 101 June flood Flooding issues Considerations.
Stakeholders Meeting – March 5, 2014 Selvin T. Southwell, P.E.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Stormwater Rulemaking Briefing US Environmental Protection Agency.
Feather River Watershed James Wilie CE 296B May 12, 1998.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Big Trout Lake Stormwater Management Design Project By Hannah Rollin.
Low Impact Development Best Management Practices
Env 247 Overview of Stormwater Management March 1, 2011.
FNR 402 – Forest Watershed Management
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
SAINTPAUL SUSTAINABLE BUILDING POLICY Saint Paul Sustainable Building Policy Training Module 7 Stormwater Management.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
GROWING COMMUNITIES ON KARST THURSDAY, SEPTEMBER 13, 2007 LOCAL GOVERNMENT INITIATIVES: JEFFERSON COUNTY, WEST VIRGINIA Tony Redman
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
By: Rick Ayers Yates County Soil & Water Conservation District
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
San Rafael, California November 12, 2015
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
6. Drainage basins and runoff mechanisms Drainage basins Drainage basins The vegetation factor The vegetation factor Sources of runoff Sources of runoff.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Supervisor, RIDEM RIPDES Permitting Program
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Protecting Non-Impaired Resources
Flow chart to determine whether coverage is required
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff? Post-construction stormwater management is in compliance with MCM5 and Anti-deg standards. No further action required. mitigation must be conductede that results in rates and volumes of runoff equal to the projects pre- development hydrology within 1) the stormshed, 2) watershed, 3) the MS4 YES NO MCM 5 – All Construction (DRAFT #1) NO Post const. rates and volume are equal to or less than that of pre-const (existing land use). YES Can mitigation be conducted up-stream and prior to the initiation of the const. project. MCM5 Anti-deg YES NO Incentives for defined re- developed sites (e.g. ???). Must meet a minimum 50%? of pre-developmennt rates and volumes of runoff. Permittee must conduct a Social and Economic Justification. This will involve the proposal of the least degrading alternative. Anit-deg is satisfied. Sites where infiltration should not occur. What standards should they meet? exclusions

MCM 5 – Post-Construction Runoff Control (DRAFT #2) YES NO YES Post-construction stormwater management for that construction activity is in compliance with MCM5 and Anti-deg standards. No further action required. Rates and volume of stormwater runoff from each site where construction activity takes place will be equal to or less than pre-development rates and volume of stormwater runoff. Will the construction activity be conducted on land that is described as any of the following? A.A brownfield site B. High Density (> 7 units per acre) C.Vertical Density, (Floor to Area Ratio (FAR) of 2 or > 18 units per acre) D.Mixed use and Transit Oriented Development (within ½ mile of transit) Will rates and volume of stormwater runoff from each site where construction activity is described as A-D, meet 50% of pre- development rates and volume of stormwater runoff. Post const. rates and volume are equal to or less than that of pre-const (existing land use). Mitigation must be conducted that results in rates and volumes of runoff equal to the projects pre-development hydrology within 1) the stormshed, 2) watershed, 3) the MS4 Can mitigation be conducted up-stream and prior to the initiation of the const. project. Anit-deg is satisfied Permittee must conduct a Social and Economic Justification. This will involve the proposal of the least degrading alternative. YES NO Mitigation must be conducted that results in rates and volumes of runoff being at least 50% of the project’s pre- development hydrology within 1) the stormshed, 2) watershed, 3) the MS4 MCM 5 Limitations Any construction activity resulting in any of the following, is not authorized to use infiltration BMPs to meet the terms and condition of MCM5. NPDES permitted industrial activity prohibited from infiltration, Stormwater discharges from vehicle fuieling and maint. Areas, Discharges from areas 1000ft up-gradient, or 100ft down- gradient of karst features, Discharges from areas with less than 3ft separation distance from bottom of infiltration system to elevation of seasonal high groundwater or top of bedrock, Areas from etc etc etc. "Construction Activity" includes construction activity as defined in 40 C.F.R. pt (b)(14)(x) and small construction activity as defined in 40 C.F.R. pt (b)(15). This includes a disturbance to the land that results in a change in the topography, existing soil cover (both vegetative and non-vegetative), or the existing soil topography that may result in accelerated stormwater runoff, leading to soil erosion and movement of sediment into surface waters or drainage systems. Examples of construction activity may include clearing, grading, filling, and excavating. Construction activity includes the disturbance of less than one acre of total land area that is a part of a larger common plan of development or sale if the larger common plan will ultimately disturb one (1) acre or more. “Pre-Development” means stormwater run-off rates and volume calculated using native soils and vegetation. “Pre-Construction” means land use prior to the beginning of a specific construction activity. “Post-Construction” means land use immediately following a specific construction activity. Draft Definitions Box 1 Box 3 Box 2 Box 4 Box 8 Box 5 Box 6 Box 10 Box 9 Box 7 Box 11 Box 14 Box 13 Box 15 Box 12 YES

"Construction Activity" includes construction activity as defined in 40 C.F.R. pt (b)(14)(x) and small construction activity as defined in 40 C.F.R. pt (b)(15). This includes a disturbance to the land that results in a change in the topography, existing soil cover (both vegetative and non-vegetative), or the existing soil topography that may result in accelerated stormwater runoff, leading to soil erosion and movement of sediment into surface waters or drainage systems. Examples of construction activity may include clearing, grading, filling, and excavating. Construction activity includes the disturbance of less than one acre of total land area that is a part of a larger common plan of development or sale if the larger common plan will ultimately disturb one (1) acre or more. “Pre-Development” means stormwater run-off rates and volume calculated using native soils and vegetation. “Pre-Construction” means land use prior to the beginning of a specific construction activity. “Post-Construction” means land use immediately following a specific construction activity. Draft Definitions MCM 5 – Post-Construction Runoff Control (DRAFT #3) Rates and volume of stormwater runoff from each site where construction activity takes place will be equal to or less than pre-development rates and volume of stormwater runoff. YES Post-construction stormwater management for that construction activity is in compliance with MCM5. No further action required. Will the construction activity be conducted on land that is described as any of the following? A.A brownfield site B. High Density (> 7 units per acre) C.Vertical Density, (Floor to Area Ratio (FAR) of 2 or > 18 units per acre) D.Mixed use and Transit Oriented Development (within ½ mile of transit) NO Will rates and volume of stormwater runoff from each site where construction activity is described as A-D, meet 50% of pre-development rates and volume of stormwater runoff. YES NO YES NO MCM 5 Limitations Any construction activity resulting in any of the following, is not authorized to use infiltration BMPs, on-site, to meet the terms and condition of MCM5. NPDES permitted industrial activity prohibited from infiltration, Stormwater discharges from vehicle fuieling and maint. Areas, Discharges from areas 1000ft up-gradient, or 100ft down-gradient of karst features, Discharges from areas with less than 3ft separation distance from bottom of infiltration system to elevation of seasonal high groundwater or top of bedrock, Areas from etc etc etc. YES NO Off-site mitigation of stormwater must occur within the timeframe specified in the MS4s regulatory mechanism. The off-site mitigation must result in one of the following outcomes. 1.Within the stormshed, a 1:1 decrease in stormwater discharge rates and volumes equivalent to the pre- development hydrology of the site of the construction activity, or 2.Within the watershed, a 2:1 decrease in stormwater discharge rates and volumes equivalent to the pre- development hydrology of the site of the construction activity, or 3.Within the MS4, a 3:1 decrease in stormwater discharge rates and volumes equivalent to the pre-development hydrology of the site of the construction activity. Will any of these outcomes be achieved? Off-site mitigation of stormwater must occur within the timeframe specified in the MS4s regulatory mechanism. The off-site mitigation must result in one of the following outcomes. 1.Within the stormshed, a 1:1 decrease in stormwater discharge rates and volumes that are a minimum of 50% less than the pre- development hydrology of the site of the construction activity, or 2.Within the watershed, a 2:1 decrease in stormwater discharge rates and volumes that are a minimum of 50% less than the pre- development hydrology of the site of the construction activity, or 3.Within the MS4, a 3:1 decrease in stormwater discharge rates and volumes that are a minimum of 50% less than the pre- development hydrology of the site of the construction activity. Will any of these outcomes be achieved? YES The regulatory mechanism developed, implemented and enforced by the MS4 will not allow the construction activity to take place.

"Construction Activity" includes construction activity as defined in 40 C.F.R. pt (b)(14)(x) and small construction activity as defined in 40 C.F.R. pt (b)(15). This includes a disturbance to the land that results in a change in the topography, existing soil cover (both vegetative and non-vegetative), or the existing soil topography that may result in accelerated stormwater runoff, leading to soil erosion and movement of sediment into surface waters or drainage systems. Examples of construction activity may include clearing, grading, filling, and excavating. Construction activity includes the disturbance of less than one acre of total land area that is a part of a larger common plan of development or sale if the larger common plan will ultimately disturb one (1) acre or more. “Pre-Development” means stormwater run-off rates and volume calculated using native soils and vegetation. “Pre-Construction” means land use prior to the beginning of a specific construction activity. “Post-Construction” means land use immediately following a specific construction activity. Draft Definitions Anti-Degradation (DRAFT #3) YES NO YES For any given construction activity within the jurisdiction of the MS4 Post-construction rates and volume of stormwater runoff are equal to or less than that of pre-construction rates and volume of stormwater runoff at the construction site. Anti-Degradation is satisfied. No further action regarding Anti-Deg required. NO Does the construction activity in question have a direct or indirect overland discharge that flows to, and that originates with within one mile of, a prohibited ORVW? YES The regulatory mechanism developed, implemented and enforced by the MS4 will not allow the construction activity to take place. NO Permittee must ensure a Social and Economic Justification (i.e. a justification why the lowering of water quality of the receiving water is necessary and important), and proposal of the least degrading alternative, is submitted to the Agency for approval or disapproval. Social and Economic Justification is approved by the Agency? Off-site mitigation of stormwater must occur within the timeframe specified in the MS4s regulatory mechanism. The off-site mitigation must be conducted up-stream of, and prior to the proposed construction activity, and must result in one of the following outcomes. 1.Within the stormshed, a 1:1 decrease in stormwater discharge rates and volumes equivalent to the pre- development hydrology of the site of the construction activity, or 2.Within the watershed, a 2:1 decrease in stormwater discharge rates and volumes equivalent to the pre- development hydrology of the site of the construction activity, or 3.Within the MS4, a 3:1 decrease in stormwater discharge rates and volumes equivalent to the pre-development hydrology of the site of the construction activity. Can this be achieved for the construction activity in question? YES NO We need to wordsmith #’s 1, 2 and 3. Hope you get the point.