Interim Permits - What?  Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units.

Slides:



Advertisements
Similar presentations
Report to TACIR on Underground Utility Damage Prevention in Tennessee
Advertisements

TeamAg, Inc 120 Lake Street Ephrata, PA Planning & Permitting Process for a Proposed CAFO Operation.
Nutrient Management: Planning and Trends
Otherwise known as: Manure Happens
10/8/ The Delegated County Feedlot Program dhauge.
Preparing for and Conducting Compliance Inspections County Feedlot Officer Compliance/Enforcement Training Ed Uhlenkamp, Todd County SWCD/Feedlot Officer.
Feedlot Inspection Site Access Wq-f5-03. General Site Access ID Card – site access language on back* ID Card – site access language on back* MPCA policy.
How to Convert Existing NRCS Comprehensive Nutrient Management Plans (CNMP) to an EPA-Required Nutrient Management Plan (NMP) Glorieta Geoscience, Inc.
NEPA, CWA, THE FARM BILL, THE BAY ACT, ESC, ASA, WQIA Understanding Laws that Shape Virginia’s Soil and Water Conservation Districts defiance-county.com.
Multi-State CNMP Meeting Karl Rockeman P.E. North Dakota Department of Health Jill Helmuth, NRCS.
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
CODE ENFORCEMENT DIVISION.  PURPOSE OF NUISANCE ORDINANCE:  It is the purpose of the nuisance ordinance to establish means whereby the City may remove.
Limited Self-Governance Act Limited Self-Governance Act Act No , “The Alabama Limited Self-Governance Act,” became law on May 26, 2005 Is not.
Ohio Livestock Environmental Assurance Program. KEY REGULATIONS Chapter 6, LEAP Federal State –Ohio EPA –Ohio Dept. of Agriculture –Ohio Dept. of Natural.
1 Indiana Department of Environmental Management Budget Presentation FY
Limited Self-Governance Act
Pesticide Container-Containment Regulations: FIFRA 19(f)(2) Determinations of Adequacy.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
North Carolina Child Care Licensing 2.01 Notes. Critical Questions Journal Question: Why does NC require licensing of child care centers?
Act 38,§5, Nutrient & Odor Management Programs Subchapter G. Facility Odor Management Regulations Discussion.
General Ag. Compliance & Chesapeake Bay Update. PA Clean Streams Law & General AG Compliance Prevent discharge of pollutants & water quality impairment.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
Overview of the Revised CAFO Regulations Ralph Summers EPA Region 7.
Virtual Environmental, Health & Safety Manager Compliance Management System T. Cozzie Consulting, Inc. telephone
Connecticut Department of Energy and Environmental Protection.
Planning Process for CNMPs Vicki S. Anderson Resource Conservationist Natural Resources Conservation Service.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Failing Septic Systems: Problems and Solutions Protect Our Waters 2003 Legislative Session Minnesota Center for Environmental Advocacy Minnesota Environmental.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Overview of the Final EPA Concentrated Animal Feeding Operations (CAFO) Regulations April 1, 2003.
2008 CAFO Roundtable October 16,2008 Thomas W. Easterly, P.E., DEE, QEP Commissioner, Indiana Department of Environmental Management.
IDEM and Agricultural Organizations Meeting February 17, 2011 Thomas W. Easterly, P.E., BCEE, QEP Commissioner IN Department of Environmental Management.
Water Quality Program Financial Assistance Progress and Plans for Meeting RCW Requirements (Joint Legislative Audit and Review Committee)
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Chapter 46 Environmental Law Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Changes at IDEM Since EQSC House Environmental Affairs Committee January 28, 2009 Thomas W. Easterly, P.E., BCEE, QEP Commissioner IN Department of Environmental.
MassDEP Underground Storage Tank Program Program Requirements for Owners and Operators Winter 2015 Workshops 1.
CFO and CAFO Regulatory Issues IN Pork Producers January 30, 2007.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Factory Farming & EPA: Running Up The White Flag On Waste In Our Waterways.
Chapter 39 Environmental Law. 2  Under what common law theories may polluters be held liable?  What is an environmental impact statement? What is the.
Indiana Environmental Management Conference October 16, 2013 Thomas W. Easterly, P.E., BCEE, Commissioner IN Department of Environmental Management 1.
George Schwint Senior Engineer MPCA Feedlot Division.
Enforcement What to Expect From the Water Boards, and What to Look for Locally ENTS Workshop August Mark Bradley Office of Enforcement CA State.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Confined and Concentrated Animal Feeding Permitting Indiana Soybean Alliance December 12, 2006.
1 Revised Suggested Modification 3 CO-12 Prevent the disposal of animal waste, wastewater and other byproducts of human, crop-based-agricultural or equestrian.
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
ISAT 422: Environmental Management Pollution Prevention n Reduction or elimination of the creation of pollution.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
IDEM Update by Commissioner Easterly Indiana Professional Dairy Producers June 4, 2007.
1 Indiana Department of Environmental Management Budget Presentation FY
Water Quality Protection And Improvement 30+ Years of the Clean Water Act Most industries, municipalities, and other dischargers of pollutants were not.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
ANIMAL CONCENTRATION AREAS WORKSHEET Completing a Manure Management Plan Workshop v
Tools for Manure Management Records For: Animal Units For: 300 or more A. U.
New York’s Chesapeake Bay WIP
Storm Water Pollution Prevention Plan Development
EPA Options for the Federal Regulation of Coal Combustion Waste Lisa Evans Earthjustice October 22, 2010.
Dairy Nutrient Management Program
Land Use and Zoning Committee Special Workshop
Single Event Violations
Comprehensive Land Use Planning and Zoning
Overview of US EPA & State Manure Management Regulations
Best Management Practices (BMPs)
Manure Management Implementation by US Farmers
ManPlan Inc is a Technical Service Provider
Presentation transcript:

Interim Permits - What?  Interim Permits are for the correction of pollution hazards at the feedlot facility. Facility is l ess than 1000 animal units Facility does not meet the definition of a large CAFO MPCA Policy - Interim Permit for Feedlots Under 10/50 AU Thresholds ○ * (g) – exempts facilities with less than 10 animal units in shoreland or 50 animal units from feedlot permit requirements

Interim Permits - Also….  Land Application of Manure if: Facility is > 300 animal units; and ○ Applied manure not in a special protection area Soil P Test > 150 ppm Bray P1 or Soil P Test > 120 ppm Olsen ○ Applied manure within a special protection area Soil P Test 76 – 150 ppm Bray or Soil P Test 61 – 120 ppm Olsen and Field slopes exceed 6% ○ Applied manure is within medium or high vulnerable Drinking Water Supply Management Areas (DWSMA)  Not Very Common

Interim Permits - Why?  The Interim Permit provides a mechanism for the agency or delegated county to get the environmental problem addressed in a much shorter period of time than could be achieved through the agency or county attorney pursuing an enforcement action.

Interim Permits - Why?  Fix pollution problem(s)  Establish a Schedule of Compliance  Authorizes Const/Expan while continuing to operate  Allows us to track return to compliance Cost share dollars Legislature (funding) General Public  Alternative is enforcement  Other?

Interim Permits - When?  Facility has a pollution hazard. A feedlot or manure storage area that does not meet the requirements of to

Types of Pollution Hazards  Open Lot Runoff  LMSA Failure  Unpermitted LMSA  Discharge From Barns  Feed Storage Area Runoff  Stockpile Setback Violations  Land Application Setback Violations Over-application

Interim Permits - When?

Interim Permits -  Issued for a maximum of 24 months Time frame defined in the permit May be extended by no more than 90 days  Contain a Schedule of Compliance Final compliance date = expiration date Can include interim submittal dates  Expansion Limitations Requires correction of problem prior to stocking expansion

Interim Permits -  Authorizes continued facility operation while fix is developed and implemented  Requires owner to minimize the pollution hazard until fix is installed and fully operational Depending on the pollution hazard – immediate response is necessary to stop or prevent a discharge to waters of the state

Interim Permits - Difficulties  Producers are reluctant to correct pollution hazards Understanding/accepting there is a problem Costs to return to compliance Can lead to a lack of cooperation  Statutory Spending Limitations MN Statute Subd. 7 (p) Limits the amount of money a regulatory authority can force a producer to spend to correct a pollution hazard

Spending Limitations -  (1) to spend more than $3,000 to upgrade an existing feedlot with less than 300 animal units unless cost-share money is available to the feedlot operator for 75 percent of the cost of the upgrade; or  (2) to spend more than $10,000 to upgrade an existing feedlot with between 300 and 500 animal units, unless cost- share money is available to the feedlot operator for 75 percent of the cost of the upgrade or $50,000, whichever is less.  Spending Limitations do not apply if feedlot is determined to be an immediate public health threat. (145A.04, subd. 8) If a threat to the public health such as a public health nuisance, source of filth, or cause of sickness is found on any property …

Interim Permits - Difficulties  Additional time commitments Make sure project is moving forward Maintaining working relationship Keeping everyone involved ○ Producer, NRCS, SWCD, JPO, Engineers, Zoning Officials, BMP Loans, Etc… Follow-up ○ Project inspections ○ Documentation ○ Closure

Interim Permits -  In the end our goal is to find problems and fix them.

QUESTIONS