New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program Pre-Bid Conference Round 2.

Slides:



Advertisements
Similar presentations
Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Repetitive Flood Claims (RFC) Severe Repetitive Loss (SRL) D. Casey Levy State Hazard.
Advertisements

NIMS ICS All-Hazard Position Specific Training – A Way Forward A Special Presentation for the All Hazards IMT Conference Houston, Texas November 4.
June 27, 2005 Preparing your Implementation Plan.
1. 2 Partners in Procurement Steve Hagar Deputy Director Central Purchasing Division Department of Central Services August 24th, 2009.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
The Managing Authority –Keystone of the Control System
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
The Texas Department of Housing and Community Affairs HOME Program Environmental Review Procedures OCC – Chapter 6.
Threshold System Presented by Jan Stanley, State Title I Director Office of Assessment and Accountability Fall Title I Directors Conference October 23-25,
Some slides in this presentation were excerpted from US Eds February 2009 PowerPoint presentation titled: Help! Im a New Title I Director. What Do I Need.
Request for Proposals (RFP) Vendor Conference Date:September 18, 2002 Time:1:00 P.M. Location: Agency Training Room Illinois EPA 1021 North Grand Avenue.
1 Child Care Resource and Referral (CCR&R): FY 13 Contract Renewal Proposal Summary Presentation January 2012.
1 Solicitations/Advertisements Solicitations/Advertisements
2 HOME DELIVERED MEALS Waiver Workshop Presented by: Regional and Local Services (RLS) Access and Intake /Area Agency on Aging (A&I/AAA) May 27-28, 2009.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Affordable Care Act Health Center Planning Grants FY 2011 HRSA Xanthia James, OPPD Health Resources and Services Administration Department of Health.
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) Reading Solicitations.
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
CHILD DEVELOPMENT GRANT PROGRAM California Student Aid Commission Presenter: Jan Burrise, Child Development Grant Coordinator (916)
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Promotion and Tenure Workshop 1. Evaluation Procedure There is only one evaluation procedure leading to recommendations regarding promotion, tenure and.
Time Management F OR A S MALL B USINESS. TIMEMANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
EMS Checklist (ISO model)
Management Plans: A Roadmap to Successful Implementation
A Roadmap to Successful Implementation Management Plans.
Greater Minnesota Transit Investment Plan PAC December 14, 2010.
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Program design overview Pre-contract to post-program year Office on Volunteerism and Community Service.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
Individual and Family Support Program
LAWA Living Wage Q & A Session OFFICE OF CONTRACT COMPLIANCE.
Subchapter M-Indian Self- Determination and Education Assistance Act Program Part 273-Education Contracts under Johnson-OMalley Act.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
Other than full and open competition, Simplified Acquisition Procedures (SAP), and Federal Supply Schedules Brendan Miller OD/OALM/OLAO/AO Operations Branch.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
Grant Management Seminar 1 District 5930 Grant Management Seminar.
25 seconds left…...
MDA Disaster Recovery Division Section 3 Program Training on Section 3 Requirements Section 3 Requirements Sponsored by the Mississippi Development Authority.
Oregon Project Independence Rule and Fee Schedule update September 26, 2013.
Offsite Storage RAF/2013/00023 Compulsory Briefing Session 16 August 2013 The Road Accident Fund.
Apprenticeship Grant for Employers of 16 to 24 year olds (AGE 16 to 24) Employer Update Presented by Insert presenters name and title Insert date of presentation.
December 10, 2014 The Legislature Should Reauthorize the UW Medical Construction Contractor Alternative Process Because Timeliness and Quality Have Improved.
5th Annual Innovation Challenge Kick-Off and Overview Info Sessions 1 & 2 Fall 2014 September 9 & 22
 Created by City Council in October Original purpose of the fund: To support housing opportunities for workforce families. $600,000 fund.  On.
MyFloridaMarketPlace Roundtable July 1, 2003 MyFloridaMarketPlace.
Local Housing Assistance Plan Amendment State Fiscal Years Board of County Commissioners August 5, 2014.
City of Eagle Pass, Texas TxCDBG Contract HOUSING REHABILIATION.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program Pre-Bid Conference.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
License Examination Services for the Indiana Professional Licensing Agency Pre-Proposal Information Session August 15, :30AM Frank Poole, Indiana.
2014 CDBG Applicants' Workshop Section 3 Overview (see also DCA Policy– Appendix R)
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
Neighborhood Stabilization Program (NSP) Orange County, Florida.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
Michigan Minority Contractors Association October 2, 2015.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
1 Section 3 Certification City of St. Louis Community Development Administration NOFA Presentation January 29, 2016.
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
TRAVEL SERVICES Request for Proposal
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program Pre-Bid Conference Round 2

Agenda Welcome and Introductions –Rehabilitation, Reconstruction, Elevation, and Mitigation (RREM) Program Managers RREM Program Description –Counties Affected –Contractor’s Role General Contractor Prequalification Pool Development Program Implementation New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 2

RREM Program Description HUD Grant and NJ Allocation to RREM –Initial allocation for RREM Program is $600,000,000 and an estimated 4,000 homes to be served –RREM Program Includes: Single-Family, Owner-Occupied properties Maximum Program benefit is $150,000 per applicant Program allows for homeowners to add their own funds and/or insurance proceeds on top of the $150,000 maximum Program Benefit New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 3

RREM Program Description –Counties Affected Bergen Essex Hudson Union Middlesex Monmouth Ocean Atlantic Cape May New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 4

RREM Program Description General Contractor’s Role in RREM Primary goal is to assist with the recovery of New Jersey residents negatively impacted by Superstorm Sandy –Accomplished through: »Customer service with applicants »Quality construction performance »Efficient and timely construction timeframes Coordinate with RREM Program Managers on scope of work (SOW) development –General Contractors are not to take direction from homeowners on SOW questions/changes –Change orders only through written approval from RREM Program Managers –Once SOW signed off by RREM Program Managers, no add-ons permitted New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 5

General Contractor Prequalification Pool Development Updates to this solicitation can be found at: –New Jersey Department of Community Affairs website –New Jersey Builders Associate website –reNEWJERSEYstronger website New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 6

General Contractor Prequalification Pool Development General Contractor Prequalification Requirements –All required registrations in place to conduct residential construction/repairs in New Jersey –Minimum bonding capacity of $1,000,000 –Financially solvent and adequately capitalized –Minimum of 5 years experience as a General Contractor building residential homes (unless modular builder with commercial experience) –Demonstrated ability to properly address LBP and ACM in residential construction –Demonstrated ability to complete homes in 90 days or less –Compliance with HUD Section 3 Requirements –Management Processes and Procedures in place to ensure General Contractor’s success in Program –General Contractors must clearly indicate their interest in rehabilitation and/or reconstruction projects –General Contractors must clearly indicate in which of the nine impacted counties they would like to participate (any or all) New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 7

General Contractor Prequalification Pool Development New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 8 EVENTDATE/TIME Posting of Request for Qualifications Second PoolJuly 17, 2013 Mandatory Conferences for Round 2 (must attend one) Cape May (Flanders Hotel, 719 East 11 th Street, Ocean City New Jersey 08226) Ocean County (Toms River Holiday Inn, 631 Clifton Avenue, Toms River, New Jersey 08753) Union City, Monmouth County (650 Toole Avenue Municipal Building, Union Beach, New Jersey 07735) Bergen County (Renaissance Meadowlands, 801 Rutherford Avenue, Rutherford, New Jersey 07070) July 18, 2013/10:00 a.m. July 18, 2013/3:00 p.m. July 19, 2013/9:00 July 19, 2013/2:00 p.m. Deadline for written questions for Second Qualified Contractor Pool July 22, :00 p.m. Answered July 24, 2013 Deadline for submission of Request for Qualifications to be considered in Second Pool July 31, 2013 / 3:00 p.m. (EDT) Evaluation Period/Second Qualified Contractor Pool Announced July 31, 2013, through August 9, 2013 Third Deadline for Request for Qualifications for Third Pool of Qualified Contractors August 19, 2013 Final Planned Deadline for Request for Qualifications for Fourth Pool of Qualified Contractors September 17, 2013

Prequalification Response Responses required to be 25 pages or less (not including appendices or attachments) Technical/narrative proposal to be a separate volume from cost volume – 2 distinct parts to be delivered Questions/clarifications sought due no later than July 22, 2013 General contractors and all subcontractors must not be listed on the Excluded Parties Listing Service (Federal debarment list) or on the State of New Jersey debarment list New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 9

General Contractor Prequalification Pool Development Pricing Exercise in Solicitation –Pricing conducted to determine contractor’s cost estimating capabilities only –Pricing is not performed on a floor plan that will be constructed in the New Jersey RREM Program New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 10

General Contractor Prequalification Pool Development HUD Section 3 –What is Section 3? “Under Section 3 of the HUD Act of 1968, wherever HUD financial assistance is expended for housing or community development, to the greatest extent feasible, economic opportunities will be given to Section 3 residents and businesses in that area.” –The State of New Jersey will publish their Section 3 plan and requirements at a later date, but contractors will be expected to comply with the State’s policy. –Includes Section 3 new hires and Section 3 businesses New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 11

General Contractor Prequalification Pool Development Additional Selection Intervals for more GCs –If General Contractors are not able to respond to this solicitation in the timeframe allotted, additional opportunities will be available. Tentatively, the solicitation will be re- opened on the following dates: August 19, 2013 September 17, 2013 –Contractor workshops will be conducted following each additional selection interval. New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 12

General Contractor Prequalification Pool Development Solicitation Responses shall be consistently evaluated and scored in accordance with the following criteria: –Cost (20 percent); –Qualifications and Experience (55 percent); –References (15 percent); and –Overall clarity and completeness of Solicitation Response (10 percent). TO BE CONSIDERED FOR THE QUALIFED CONTRACTOR POOL A RESPONDENT MUST SCORE AT LEAST A 65% ON PUBLISHED CRITERIA. New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 13

Program Implementation Schedule for awards –Anticipate first NTP in late Summer/early Fall 2013 Performance and payment bonds required for each property assigned. Original bonds required prior to issuance of any NTP to General Contractors. 90 day completion deadlines for Reconstruction –Substantial progress deadlines along the way to ensure contractors are making satisfactory progress on homes prior to 90 day deadline. –Passed 33% inspection within first 30 days of NTP –Passed 66% inspection within first 60 days of NTP –Passed Final inspection within 90 days of NTP New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 14

Program Implementation Rehab and Modular construction: 90 day completion deadlines Substantial progress deadlines along the way to ensure contractors are making satisfactory progress on homes prior to 90 day deadline. Passed 50% inspection within first 45 days of NTP (For modular house on the ground) Passed Final inspection within 90 days of NTP New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 15

Program Implementation Contractor Workshop to be conducted following identification of Prequalified Contractor Pool –Additional Program requirements regarding implementation to be presented to contractors during this workshop. New Jersey Reconstruction, Rehabilitation, Elevation, and Mitigation (RREM) Program 16