Doc.: Submission, Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for March.

Slides:



Advertisements
Similar presentations
Sangsung Choi(ETRI) tv SG4TV Slide 1 May 2011 Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission.
Advertisements

Doc.: IEEE /464r0 Submission November, 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0200r0 Submission Jan 2008 Rick Roberts, IntelSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE wng0 Submission November, 2013 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE rfid RFID-IG November 2007 Mike McInnis, The Boeing Company Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE sru Submission July 2012 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE sru Submission May 2014 Shoichi Kitazawa(ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Submission doc;IEEE sru July 2014 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Opening/ Report for March.
Doc.: IEEE xxx g Submission March 2011 Kuor Hsin Chang, Bob Mason (Elster Solutions) Project: IEEE P Working Group for Wireless.
Doc.: IEEE sru Submission March 2014 Shoichi Kitazawa(ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for July.
Doc.: IEEE /0395r1 Submission July 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
4/26/2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Response to WG request regarding TC ERM requested.
Doc.: IEEE SCWNGSlide 1 January 2013 Pat Kinney, Kinney Consulting LLC Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0160r0 Submission March 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for Sept2014.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for May.
Doc.: IEEE Submission March, 2014 Pat Kinney, Kinney ConsultingSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
<month year> doc.: IEEE < e> <Mar 2016>
2018/9/ /9/14 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4i May 2011 Closing report Date.
<month year> doc.: IEEE < e> <Nov 2017>
<month year> doc.: IEEE < e> <Nov 2017>
Submission Title: St. Louis e/ Liaison Report.
<month year> doc.: IEEE < e> <March 2018>
<month year> doc.: IEEE < e> <July 2018>
<month year> <Sept 2018>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4h Closing Report for Orlando Mar 2010.
<month year> doc.: IEEE < e> <March 2018>
<month year> doc.: IEEE < e> <November 2018>
Jan 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Jan 2015 closing report Date Submitted: Jan.
<month year> doc.: IEEE < e> <January 2019>
<month year> doc.: IEEE < e> <September 2018>
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4e Closing Report for Waikoloa Sep.
<month year> doc.: IEEE < e> <January 2019>
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
doc.: IEEE <doc#>
<month year> doc.: IEEE ptc November 2012
<month year> doc.: IEEE < e> <November 2018>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4e Closing Report for Waikoloa Sep.
<month year> <Nov 2018>
<month year> doc.: IEEE < e> <Mar 2018>
April 19 July 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: WNG Closing Report for San Diego.
Submission Title: [Proposed project timeline]
<month year> doc.: IEEE < e> <March 2018>
doc.: IEEE <doc#>
<month year> doc.: IEEE < e> <March 2018>
Tero Kivinen, INSIDE Secure
doc.: IEEE <doc#>
Submission Title: [Proposed project timeline]
<month year> doc.: IEEE < e> <November 2018>
January 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [17.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15.
<month year> doc.: IEEE < e> <March 2019>
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
November 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4c Project Plan] Date Submitted: [15.
doc.: IEEE <doc#>
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4h Closing Report for Orlando Mar 2010.
<month year> doc.: IEEE < e> <March 2019>
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
Submission Title: TG9ma Agenda for September Meeting
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Agenda for September 2019 Date.
Jan 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TeraHertz Closing Report Date Submitted: January.
<month year> doc.: IEEE < e> <July 2019>
Submission Title: TG9ma Closing Report for July Meeting
Submission Title: TG9ma Closing Report for September Meeting
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Specialty Networks (WSN) Submission Title: TG4z EIR Agenda for November 2019 Date.
Presentation transcript:

doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for March 2014 Session] Date Submitted: [20 Mar2014] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [Chicago area, IL, USA] Voice:[ ], Re: [SC Closing Report for March 2014 Session.] Abstract:[Closing Report for the Mar Session] Purpose:[] Notice:This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P

doc.: Submission, Slide 2 SC Maintenance Detailed Agenda (Agenda )  Tuesday 18 Mar, AM1:  review timing issues and resolutions  MAC Timing values, background and discussion  Questionable Timing Discussion  Analysis of inter-frame spacing in  review corrigenda  approved amendments: 4e, 4f, 4g, 4j, 4k, 4m, 4p  TG28 changes: slides  Thursday 20 Mar, AM1:  Review PHY clause 8, 9 rollup (including 4m & 4p)  discuss macFrameCounter issue ( , slides )  Thursday 20 Mar, AM2:  Revision drafting: finish issue resolution and project schedule  Operation Manual Changes ( )

doc.: Submission, Slide 3 SC Maintenance Accomplishments  Tuesday 18 Mar, AM1:  review timing issues and resolutions  Consensus: leave SIFS and LIFS alone  Consensus: simplify/clarify ACK timing  review corrigenda  Consensus: add resolutions to revision draft  TG28 changes: slides 9 – 11  Consensus: add resolutions to revision draft  Thursday 20 Mar, AM1:  Operation Manual Changes ( )  Agreed to proposed changes and defined allowable entities that may be allocated IDs  discuss macFrameCounter issue ( , slides )  Consensus: form a Security IG with Tero Kivinen as chair  Revision: J Gilb formed an action list  Thursday 20 Mar, PM1:  Revision drafting: finish issue resolution and project schedule

doc.: Submission Revision Timing Effort 1.Acknowledgement Timing a)Complex, PHY specific definitions, some with mixed units b)Depends on a number of constants and other attributes that have been touched a lot c)Specified in more than one way in the standard d)Reference point for timers unclear e)When/if to use CSMA a)More than 4 different CSMA scenarios need addressing 2.LIFs and SIFs a)Suggestion to replace with single IFS specification b)Ripples a lot (including into Ack timing) c)Backwards compatibility issues? Slide 4,

doc.: Submission, Slide 5 TG28 Changes 1) Frame ID Extension SC-M agreed to recommend defining the last reserved Frame ID value (0b111) to indicate an Extended Frame ID format consisting of 5 additional bits (total 8-bit Frame ID). IEEE will manage the assignment of the extended Frame ID space to IEEE task groups or SDOs. The value 0b was agreed to be assigned to TIA to ratify the TR51 Frame ID, giving TIA effectively 4 Frame IDs. The frame format associated with extended Frame ID values is to be defined with each Frame ID as usual.

doc.: Submission, Slide 6 TG28 Changes 2) ID Management SC-M agreed to recommend that IEEE should manage the allocation of various resource IDs including IE IDs. The re-definition of 'unmanaged' ID ranges to 'Reserved' will be coordinated with vendors who have already used 'unmanaged' range values in their products. Requests for resource values by external SDOs should be via the MOU channel between IEEE and the external SDO. IEEE will review the request and may suggest alternate solutions instead of assigning resource identifiers where appropriate. The timescale for response to a request should cover 2 IEEE meetings (i.e. of the order 2 months). A liaison response to ETSI should be generated to report on progress on discussions of resource allocation management.

doc.: Submission, Slide 7 TG28 Changes 3) IE Descriptor Format SC-M agreed to recommend that the last version number value (0b11) for frame types (Beacon, Data, ACK, MAC Command) should be used to indicate that IEs use TLV descriptor format. Version 0b10 frames (current 15.4e values) use LTV descriptor format. Similarly, Version 0b01 Multipurpose frames use TLV descriptor format. Existing 0b00 Version Multipurpose frames use LTV descriptor format. Any future changes to frames can be accommodated by the large available extended frame ID space. A final note was also agreed that the one remaining reserved bit in frames should be assigned if possible when the new version is defined - otherwise it will not be possible to use the bit as there is no further version number space

doc.: Submission, Slide 8 Deprecation Candidates PSSS/ASK Phy MPSK Phy LLDN MR-OQPSK AMCA 14.5

doc.: Submission, Slide 9 Revision Schedule Comment collection Start23 May End6 June Letter Ballot Start14 June End13 July (San Diego) Recirculations start27 July end 14 Oct Sponsor Ballot Starts 17 Nov ends17 Dec Recirculations Start5 Jan end2 Mar EC submittal Plenary March 2015 RevCom17 June

doc.: Submission, Slide 10 SC WNG IEEE Performance In Heavily Loaded Mixed Protocol Environments by Tim Harrington ( ) Presentation showed that ETSI v1.81 allowed devices to access the medium before devices due to the time required to sample the media. Discussion ensued as to what should be done. One possibility was to use one time for all devices. Another possibility was to develop a new method to coordinate users of the media. Consensus was to pursue this issue within the SRU group until it is determined that it should be moved to another group.

doc.: Submission, Slide 11 Conference Calls Wednesday at 8am PDT 2 April Agenda Status Update Timing proposal