Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: Submission, Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for Sept2014.

Similar presentations


Presentation on theme: "Doc.: Submission, Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for Sept2014."— Presentation transcript:

1 doc.: Submission, Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for Sept2014 Session] Date Submitted: [18 Sep2014] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [Chicago area, IL, USA] Voice:[+1.847.960.3715], E-Mail:[pat.kinney@ieee.org] Re: [SC Closing Report for Sep 2014 Session.] Abstract:[Closing Report for the Sep Session] Purpose:[] Notice:This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

2 doc.: Submission, Slide 2 Meeting Goals (Agenda 15-14-0510-01)  SC Maintenance  Monday 15 Sep AM2:802.15.4 revision - LB94 comment resolution  Monday 15 Sep PM1:802.15.4 revision - LB94 comment resolution  Tuesday 16 Sep, PM1: 802.15.4 Revision LB94 comment resolution  Tuesday 16 Sep, PM2: 802.15.4 Revision LB94 comment resolution  Wednesday 17 Sep, AM1: 802.15.4 Revision LB94 comment resolution  Thursday 18 Sep, AM1: 802.15.4 Revision LB94 comment resolution  Thursday 18 Sep, AM2: 802.15.4 Revision LB94 comment resolutio  Thursday 18 Sep, PM1: 802.15.4 Revision LB94 comment resolution and BRC approval  SC WNG (Wed, 17 Sep, AM2)  802 EC Privacy SG status and plans by Juan Carlos  A true low power solution for 802.15.4 by J Gilb  Interconnecting 802.15 WPANS with Ethernet Networks by Behcet Sarikaya

3 doc.: Submission, Slide 3 SC Maintenance Detailed Agenda  Monday 15 Sep, AM2:  Review LB94 resolution status, comment resolution  Monday, 15 Sep, PM1  LB94 Comment resolution  Tuesday, 16 Sep, PM1  LB94 Comment resolution  Tuesday 16 Sep, PM2  LB94 Comment resolution  Wednesday 17 Sep, AM1:  LB94 Comment resolution  Thursday 18 Sep, AM1  LB94 Comment resolution  Thursday 18 Sep, AM2  LB94 Comment resolution  Thursday 18 Sep, PM1:  BRC formation, approval of resolutions to date, conf call scheduling

4 doc.: Submission SC WNG Presentations 802 EC Privacy SG status and plans by Juan Carlos –Document privecsg-14-0007-01-ecsg A true low power solution for 802.15.4 by J Gilb –Document 15-14-0448-00 Interconnecting 802.15 WPANS with Ethernet Networks by Behcet Sarikaya –Document 15-14-0524-01 Slide 4,

5 doc.: Submission SC Maintenance Discussions on pervasive comments: CCA Extended frame assignments Fragmentation Bit ordering LB 94 Comment Resolution Effort All comments were collected in document 15-14-0423 Of the 863 LB94 comments, the SCm resolved 843 (98%). 28 of the 39 (72%) rogue comments were resolved. Comment resolution resumes at weekly Tuesday and Thursday BRC/SCm conference calls starting 25 Sept Slide 5,

6 doc.: Submission LB 94 results (non-audited) VOTERS 121 VOTED 83 YES 63 ABSTAIN 3 NO 17 % VOTERS 68.6% % YES 78.8% % ABSTAIN3.6% # Comments863 Slide 6,

7 doc.: Submission, Slide 7 SCm motions BRC: SCm requests that 802.15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the 802.15.4 Revision draft standard with the following membership: Pat Kinney, James Gilb, Jeritt Kent, Benjamin Rolfe, Clint Powell, Billy Verso, Kunal Shah, Phil Beecher, Fumihide Kojima, Tero Kivinen, and Tim Harrington. The 802.15.4 Revision BRC is authorized to approve comment resolutions and to approve the start of balloting the 802.15.4 Revision draft on behalf of the 802.15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences as announced to the reflector at least 30 days in advance. Tim Harrington moved, Ben Rolfe seconded. Upon no opposition the motion carries with unanimous consent.

8 doc.: Submission, Slide 8 SCm motions to WG15 BRC: Move that 802.15 WG approve the formation of a Ballot Resolution Committee (BRC) for the WG balloting of the 802.15.4 Revision draft standard with the following membership: Pat Kinney, James Gilb, Jeritt Kent, Benjamin Rolfe, Clint Powell, Billy Verso, Kunal Shah, Phil Beecher, Fumihide Kojima, Tero Kivinen, and Tim Harrington. The 802.15.4 Revision BRC is authorized to approve comment resolutions and to approve the start of balloting the 802.15.4 Revision draft on behalf of the 802.15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector 30 days in advance. Moved by Pat Kinney Seconded by Ben Rolfe

9 doc.: Submission, Slide 9 BRC Conference Calls Standing Weekly Conference Call: Tuesdays and Thursdays at 15:00 PDT, 17:00 CDT, 23:00 BST, Friday 07:00 JST Continues until November session Mondays and Wednesdays at 15:00 PDT, 17:00 CDT, 23:00 BST, Friday 07:00 JST Starts after November session

10 doc.: Submission, Slide 10 802.15.4 Revision Schedule Comment collection Start23 May End6 June Letter Ballot Start14 June End13 July (San Diego) Recirculations Start17 Oct End 1 Nov (San Antonio) Sponsor Ballot Start March 2015 (Berlin) EndsApril 2015 Recirculations StartMay 2015 EndJune 2015 EC submittal 17 July 2015 (Waikoloa) RevCom 27 August 2015


Download ppt "Doc.: Submission, Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Closing Report for Sept2014."

Similar presentations


Ads by Google