Presentation is loading. Please wait.

Presentation is loading. Please wait.

<month year> doc.: IEEE < e> <Mar 2016>

Similar presentations


Presentation on theme: "<month year> doc.: IEEE < e> <Mar 2016>"— Presentation transcript:

1 doc.: IEEE 802.15-<15-09-0758-00-004e>
<month year> doc.: IEEE < e> <Mar 2016> Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SC Report for Mar 2016 Session] Date Submitted: [13 Mar 2016] Source: [Patrick Kinney] Company [Kinney Consulting LLC] Address [Chicago area, IL, USA] Voice:[ ], Re: [SC Report for Mar 2016 Session.] Abstract: [Report for the Mar 2016 Session] Purpose: [] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P <Pat Kinney>, <Kinney Consulting LLC>

2 doc.: IEEE 802.15-<15-09-0758-00-004e>
September 18 <month year> doc.: IEEE < e> <Mar 2016> Accomplishments Standards issues: 6 questions from Koorosh Akhavan were addressed Question 1: When will the standard be released? Very soon, perhaps April Question 2: Is the PAN-ID table in e correct? No, refer to for correct text Question 3: should the FCS be included in the Wake-up frame? Yes, refer to for correct text Question 4: should the wakeup frame have a 2-octet Frame Control? Yes, refer to for correct text Question 5: Does the wakeup frame have security? Yes, it can be authenticated Question 6: Should the wakeup frame have a 2-octet Frame Control? Yes, refer to for correct text Operations Manual Discussed future changes to the ANA section permitting additional behaviors Slide 16 <Pat Kinney>, <Kinney Consulting LLC> Page 16

3 <Mar 2016> WG Motion Move that the WG approve document as the response to the from Koorosh Akhavan. Move: Pat Kinney Seconded by <Pat Kinney>, <Kinney Consulting LLC>

4 <Mar 2016> SC WNG Presentation: Proposal for an adaptive throughput link budget mode in ( ) by W Mulder (Dialog Semiconductor) There were no responses from individuals willing to participate in an IG on this concept. No IG was formed <Pat Kinney>, <Kinney Consulting LLC>


Download ppt "<month year> doc.: IEEE < e> <Mar 2016>"

Similar presentations


Ads by Google