Trial Use Guide For Assessing Voltages At Publicly and Privately Accessible Locations (P1695) Section 6 Contact Voltage Scott Kruse Power Survey Company.

Slides:



Advertisements
Similar presentations
Subcontractor Electrical Safety & NFPA 70E
Advertisements

As a stand-alone overview of test tools.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Electrical Hazards for Fire and Rescue Departments Part III: Fires Near High Tension Power Lines Captain I Gary C. Dize Health and Safety Division Fairfax.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 RXQ Customer Drop Submitted by Supplier Process Flow Diagram Customer Supplier Distribution Company Supplier sends Drop Request to Distribution.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
CHARGING SYSTEMS Induced Voltage AC Charging Systems
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
FIGURE 10.1 Typical physical appearance of a controller.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 2 Q 3 Q 4 Q 5 Q 6Q 16Q 11Q 21 Q 7Q 12Q 17Q 22 Q 8 Q 13 Q 18 Q 23 Q 9 Q 14 Q 19Q 24 Q 10 Q 15 Q 20Q 25 MagnetismTermsElectricityPioneersCircuits.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
GOALS FOR TODAY Understand how to write a HACCP Plan
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Electricity and Magnetism
Making the System Operational
CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
ZMQS ZMQS
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Using Family Connection Online Resource for Planning & Advising.

OSHA Office of Training and Education - Revised by TEEX 12/05/07
LED:NMSO Workshop 11/02/ SHOCK VALUE NM State Science Olympiad 2013.
Beckett Energy Systems
ABC Technology Project
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
CS105 Introduction to Computer Concepts GATES and CIRCUITS
©2004 Brooks/Cole FIGURES FOR CHAPTER 7 MULTI-LEVEL GATE CIRCUITS NAND AND NOR GATES Click the mouse to move to the next page. Use the ESC key to exit.
NIMS Communications and Information Management IS-700.A – January 2009 Visual 4.1 NIMS Resource Management Unit 4.
Squares and Square Root WALK. Solve each problem REVIEW:
2014 BP Team Alaska ALASKA SAFETY HANDBOOK
R Ch 34 Electric Current pg 1
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
1 Troubleshooting. 2 Introduction This section provides you with the necessary skills to effectively troubleshoot the DIRECTV System.
Week 1.
We will resume in: 25 Minutes.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
1 Unit 1 Kinematics Chapter 1 Day
NANC Report Numbering Oversight Working Group (NOWG) March 9, 2011 Tri-Chairs: Laura Dalton, Verizon Communications Natalie McNamer, T-Mobile USA Gwen.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
©2004 Brooks/Cole FIGURES FOR CHAPTER 14 DERIVATION OF STATE GRAPHS AND TABLES Click the mouse to move to the next page. Use the ESC key to exit this chapter.
Chapter 30 Induction and Inductance In this chapter we will study the following topics: -Faraday’s law of induction -Lenz’s rule -Electric field induced.
Complete Quiz You have 10 minutes to complete the quiz The Quiz is Open-Book (use it) Get help from your neighbor.
Chapter 4 Ohm’s Law, Power, and Energy. 2 Ohm’s Law The current in a resistive circuit is directly proportional to its applied voltage and inversely proportional.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Contact Voltage in the Urban Landscape: A Public Safety Hazard Presentation to NASUCA November 15, 2010 Atlanta, GA Connie O. Hughes Former NJBPU President.
Contact Voltage in the Urban Landscape: A Public Safety Hazard Presentation to NARUC November 15, 2010 Atlanta, GA Connie O. Hughes Former NJBPU President.
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Grounding.
Circuits and components Unit 45 Dr. Hatem Elaydi Engineering Technical English Islamic University of Gaza April 6, 2016.
Technical English Unit 45: Circuits and components Dr. Basil Hamed Technical English Islamic University of Gaza April, 2016.
Grounding.
Unit 45: Circuits and components Dr
Circuits and components Chapter 45
Unit 45: Circuits and components Dr
Unit 45: Circuits and components Dr
Presentation transcript:

Trial Use Guide For Assessing Voltages At Publicly and Privately Accessible Locations (P1695) Section 6 Contact Voltage Scott Kruse Power Survey Company January 12, 2009 David Kalokitis Power Survey Company

2 Presentation Overview Objectives Objectives Time Frame Time Frame Description of effort to date Description of effort to date Outline of draft text Outline of draft text Feedback Feedback Discussion Discussion

3 Objectives Distribution of Section 6 Contact Voltage to all group members through . Distribution of Section 6 Contact Voltage to all group members through . Post on Working Group website Post on Working Group website All interested parties to read and provide feedback by sending word doc. with tracked changes and / or comments. All interested parties to read and provide feedback by sending word doc. with tracked changes and / or comments. Submit feedback to: Submit feedback to: Dave Kalokitis: Scott Kruse: Chuck DeNardo:

4 Time Frame Submit any edited text or comments by the end of April for inclusion into the next revision of the document. Submit any edited text or comments by the end of April for inclusion into the next revision of the document. Effort to date A small number of contributors have generated and mutually reviewed draft A small number of contributors have generated and mutually reviewed draft 22 pages 22 pages Many openings for needed contributions Many openings for needed contributions

5 6.1 Contact Voltage Definition Definition General Concerns General Concerns Shock Hazard Shock Hazard Shock Triangle Shock Triangle

Contact Voltage Discovery Incident Shock Report from Public / Other Inspection Scheduled inspection and test of assets Detection Manual Survey of Assets Mobile Detection of Energized Surfaces Energized Surfaces are often discovered by:

Contact Voltage Root Causes Insulation Degradation Insulation Degradation Failure of insulating materials Failure of insulating materials Neutral Corrosion / Burn Out Neutral Corrosion / Burn Out Current may return through ground Current may return through ground Neutral to earth voltage (NEV) due to resistance Neutral to earth voltage (NEV) due to resistance Workmanship Workmanship Reversed polarity Reversed polarity Improper insulation of connections Improper insulation of connections Construction Damage Construction Damage Excavation, Road work, Improper Repair of Damage Excavation, Road work, Improper Repair of Damage

Energized Structures Manhole Covers Manhole Covers Hand Hole Covers Hand Hole Covers Street Lights Street Lights Traffic Signals Traffic Signals Sidewalk / Roadways Sidewalk / Roadways Gates / Fences Gates / Fences

Test and Measurement Equipment Hand Held Detector Hand Held Detector Mobile E-field Detector Mobile E-field Detector Hand Held E-field Detector Hand Held E-field Detector Voltmeter Voltmeter Ground Lead Ground Lead Switchable Shunt Resistor Switchable Shunt Resistor Ground Rod Ground Rod Safety Equipment Safety Equipment

Locating, Measuring and Mitigating Contact Voltage Discovery Methods Discovery Methods Incident Incident Record Keeping, Communication Record Keeping, Communication Inspection Inspection Prescribed cyclic inspection of assets Prescribed cyclic inspection of assets Record Keeping Record Keeping Detection – Underground/Overhead Detection – Underground/Overhead Manual Survey Manual Survey Mobile Detection Mobile Detection

Measurements What is the voltage level on the energized surface? What is the voltage level on the energized surface? Is the voltage supplied through low or high impedance? Is the voltage supplied through low or high impedance? How much current can be sourced? How much current can be sourced? Is the voltage related to a fault, neutral resistance, or other condition? Is the voltage related to a fault, neutral resistance, or other condition? Is the voltage likely to change? Is the voltage likely to change?

Measurement Circuit Voltage Measurements Open circuit voltage measurements Open circuit voltage measurements Reference must not be energized Reference must not be energized ~ AC Source R source R shunt Reference Ground Voltmeter

Current Measurements Closed circuit (shunt voltage) measurements Closed circuit (shunt voltage) measurements Reference must not be energized Reference must not be energized Reference and contact impedance must be low Reference and contact impedance must be low AC Source ~ R source R shunt Reference Ground R ground R contact Voltmeter

Current Measurements Use Pushbutton Shunt Use Pushbutton Shunt Compare open and closed circuit voltages Compare open and closed circuit voltages Try alternate ground (earth) points Try alternate ground (earth) points Interpret results, know when to conclude measurements Interpret results, know when to conclude measurements ~ AC Source R source R shunt Reference Ground R ground R contact Voltmete r Key Concepts Key Concepts Determine R source Determine R source Minimize R ground R contact Minimize R ground R contact

15 Interpret Results Assume ground and contact resistances low Assume ground and contact resistances low High V oc (50 Volts) Low V cc (0.9 Volts) High V oc (50 Volts) Low V cc (0.9 Volts) Safe? Safe? Low V oc (3 Volts) Low V cc (2 Volts) Low V oc (3 Volts) Low V cc (2 Volts) Safe? Safe?

16 Interpretation only possible when: Steps are taken to confirm low ground and contact resistance and ground is not energized Steps are taken to confirm low ground and contact resistance and ground is not energized V oc Open Circuit Voltage measured V oc Open Circuit Voltage measured V cc Closed Circuit Voltage measured V cc Closed Circuit Voltage measured

17 Shunts & Grounds Shunt should eliminate phantom voltage Shunt should eliminate phantom voltage 500 ohms – low impedance 500 ohms – low impedance Important to find low impedance ground Important to find low impedance ground 3000 ohms – eliminates phantom voltage 3000 ohms – eliminates phantom voltage If: Ground impedance = 50 ohms If: Ground impedance = 50 ohms Then: Measurement error – Then: Measurement error – 10 % with 500 ohm shunt 10 % with 500 ohm shunt 1.6% with 3000 ohm shunt 1.6% with 3000 ohm shunt Understand importance of ground impedance Understand importance of ground impedance

18 Next Steps (for this section) Additional measurement scenarios Additional measurement scenarios Analysis of data Analysis of data Specific examples Specific examples Additional measurements and their utility Additional measurements and their utility NEV treatment NEV treatment Structure specific information Structure specific information INPUT WELCOME INPUT WELCOME

Safety Standards The New York State Electric Safety Standards currently state the following: Structures with voltage that measures 1 volt or greater with a 500 ohm shunt should be barricaded and guarded until properly mitigated. Any temporary repair should be periodically monitored until permanent repair is made.

Mitigation Typical repairs by structure type Typical repairs by structure type Unusual findings Unusual findings Trends Trends INPUT WELCOME INPUT WELCOME 6.5 Case Studies INPUT WELCOME INPUT WELCOME

21 Solicitation Need Text Need Diagrams Need Figures Need Case Studies Send word doc. with tracked changes and / or comments