A challenging program in all respects

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

Enabling Customer Demand Management Kevin Evans President & CEO June 24, 2010.
Mass Rollout in Finland A Service Provider Perspective
QSE Program Managers Meeting - Nov 15th, Topics Context Schedule Review Package status Program Team Statistics.
PG&Es 2009 Participating Load Pilot. 2 Overview Regulatory Context Pilot Characteristics Lessons Next Steps.
GNSO/Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
1 OAS Financial Management Challenges and Program- Budget Implications 1 SECRETARIAT FOR ADMINISTRATION AND FINANCE October 2008.
SEM08-14 SPECIALIST TASK FORCES (STFS) ETSI Seminar SEM08-14.
Replacement of the Queens Approach Bronx-Whitestone Bridge
Final Report Anton Schrag REGIO D1
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
Flexible Airborne Architecture
1 Overview Program Goals Laptops Wireless Networking Desktop Management Support Training Pilot Project Timelines Connecting Classrooms Agenda.
NIHR Leadership Support and Development The Trainee Programme 23 September 2009.
Maroclear in brief Key figures Milestones The new platform : an overview Prospects 2.
Cloud nine or cloud over? A balanced view of our move to hosted services Elena Menéndez-Alonso Information Designer, Plymouth University 7 th IGeLU Conference.
Michael Marcinkevicz Director. IT Mission Provide reliable & secure IT systems for the business units of ASC, Increase operating efficiencies with new.
PG&E Automated Demand Response Program Webinar 2008 Program Summary and Participant Forum October 14, 2008.
Sage Review & Strategic Direction David Pinches Head of Software Group Sage User Network AGM February 2008.
Canadian Sport Policy Renewal Meeting with the Sport Community September 24, 2010.
A-16 Portfolio Management Implementation Plan Update
DT&E Cmte - Walking The Line with Title 10 1 Beth Wilson Industry Co-Chair NDIA System Engineering Division, DT&E Committee Test Architect, Raytheon Company.
THE CORE PROJECT Jose Jimenez (project manager). What is the Core platform?
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Securing Emerging Mobile Technology JOHN G. LEVINE PH.D. D/CHIEF ARCHITECTURE GROUP 13 SEP
MARTAs Road to PCI Compliance 1 Presenter: Yolanda Curtis, PMP AFC Project Manager.
1 RDA and Plans: Australia, Canada, UK, & US Dr. Barbara B. Tillett Chief, Policy and Standards Div. Library of Congress for EURIG August 8, 2010.
Capacity to Customer (C 2 C) Update ENA 2012 Low Carbon Network Fund Conference 26 October 2012.
WECC Reliability Based Control Field Trial
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
What: System wide demonstration of the DMAC capabilities we’ve been working on for ca.10 years. Why: Proof of concept that DMAC can be unifying element.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
RIIO – ED1 timetable Robert Friel Regulatory Strategy and
LeadershipQuality Innovation Department of Human Resources GNWT HR Systems PeopleSoft HRIS Upgrade November 2010.
Navy Medicine Clinical Imaging Archive (NCIA) Symposium Brief Michael Fortier 4-6 June 2012.
Background CP5A0109 NACMA (now NCI Agency) Contract
Science ROCKS! Welcome to the Hamilton County District In-service: August 4, 2011.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
Enagás IT roadmap CAM & CMP 19 July Index CAM IT roadmap CMP IT roadmap.
Madrid, 19 th November 2012 Roadmap implementation CAM 20 th IG meeting.
Unemployment Insurance UI Tax Project Certification Change Request Department of Workforce Solutions Presentation to Project Certification Committee June.
Unemployment Insurance UI Tax Project Certification Department of Workforce Solutions Presentation to Project Certification Committee December 16, 2009.
“Reaching across Arizona to provide comprehensive quality health care for those in need” Our first care is your health care Arizona Health Care Cost Containment.
Weekly Attendance by Class w/e 6 th September 2013.
Highlights From the Survey on the Use of Funds Under Title II, Part A
UN UNCLASSIFIED 1 DOD Participation Challenges in the National Exercise Program Issue : DOD Participation Challenges in the National Exercise Program.
IEG Portfolio (Scenario A and B)
VistA Imaging Modernazation Project December 11, 2007 Project Overview.
ACCS TMD1 is an evolution of ACCS LOC1
Segment Two: Business Requirements Drive the Technical Updates January 26-27, 2012 Idaho ICD-10 Site Visit Training segments to assist the State of Idaho.
November 2009 Network Disaster Recovery October 2014.
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
ANSALDO: BACKGROUND experience in dependable Signalling Automation Systems experience in dependable Management Automation Systems experience in installation,
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Agenda Teams Responsibilities Timeline Homework and next steps.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
EMS User Group Conference – 2008 PHI EMS MIGRATION TO COMMON PLATFORM PROJECT Manley Higgins Project Manager System Operations Pepco Holdings Inc. September.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
DARPA Network Modeling & Simulation (NMS) Integration Presented to Dr. Sri Kumar (DARPA PM) By Georgia Tech, UCLA, and SSC SD 30 MAY 01.
Japan proposal on schedule
HEPiX Fall 2017 CERN project Follow-up
Manley Higgins Project Manager System Operations Pepco Holdings Inc.

Lockheed Martin Canada’s SMB Mentoring Program
PCS Day - Feedback 23th November 2016, Vienna.
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Executive Project Kickoff
Proposed core price & service spec L1 product milestone 31 Dec 2019
Presentation transcript:

A challenging program in all respects Core ACCS LOC1 A challenging program in all respects Test Core System Requirements tested 3700 Verified 200 ~ remaining Over 11300 Software Requirements verified Real Time ~ 7600 Non Real Time ~ 3700 All HWCI and CSCI implemented HW Upgrade, Solaris 10 Secured and redundant environment 12 strings in factory 15 Databases for MTIF and sites System version installed weekly on 12 strings 10000 regression steps in 2010 for 6 system versions (factory + sites) Integration continuous in factory and 6 sites Engineering Over 3900 Core System Requirements Core System Hardware ~1400 Core System Software ~ 2500 About 12600 Software Requirements SW Sizing estimates : 13000 KSLOCs (13+ million lines of software) Real Time 75% Non Real Time 25% System Design broken down in 10 HWCI and 9 CSCI About 150 Software COTS NATO UNCLASSIFIED

ACCS Validation Sites CAOC Uedem ARS Glons & STVF CARS Lyon Mt. Verdun DCAOC Uedem DACC Poggio Renatico CARS Poggio Renatico NATO UNCLASSIFIED

Main events towards fielding Sep 2009 STI-1 1st version Dec 2008 FST Major change integrated in the contract in 2007: Block Upgrade 1 (BU1) (mainly in CAOC functionalities changes) ACCS BU1 was successfully tested in factory in September 2011 and in live environment System Test I-2 at STVF completed in March 2013 (with test under simulated peak load conditions) Following test performed & completed in 2 Validation Nations (BE, GE) and on-going in the two remaining ones (FR & IT) Mar 2013 STI-2 Sep 2011 FST BU1 2nd version (BU1) Jun/Dec 2013 STII June 2014 PSWA STIII Apr 2014 1st version was successfully tested in Factory (Factory System Test) in 2008 and in live environment [System Test I-1 (STI-1) at System Test and Validation Facility (STVF) located in the NPC] in 2009. Final tests performed in multi-site configuration: System Test III Up to Provisional Software Acceptance forecasted mid 2014 NATO UNCLASSIFIED

Main events towards fielding Operational Evolution Sep 2009 STI-1 FB Mar 2013 STI-2 BU1 Jun 14 PSWA Oct 2011 Spiral1 Award Jul 2013 FCSE 1st IOT&E STI-1 in 2009 revealed shortfalls => improvements in Air Mission Control, workflow & HMI grouped in a Spiral 1 enhancement. Spiral 1 awarded in October 2011 successfully tested in factory in Jul 2013 will be merged with BU1 for final test STIII up-front PSWA BU1 In Service Support Work under preparation to introduce JTS interface and JCHAT capability towards ACCS IOC Potentially Shortfalls from future IOT&Es (STI-2, STII & STIII) might also lead to additional Spirals Spiral 2 1. Operational requirements evolve: Operational needs regularly expressed by SHAPE (roadmap towards ACCS IOC) like JTS interface, JCHAT capability Initial Operational Tests & Evaluations (IOT&E) after each live environment System Tests on site bring potential new requests NATO UNCLASSIFIED

Main events towards fielding Technical Evolution Sep 2009 STI-1 FB Mar 2013 STI-2 BU1 Jun 14 PSWA Oct 2011 Spiral1 Award Jul 2013 FCSE BU1 In Service Support Technical evolutions 2. Meanwhile technology is also evolving Communication means: from point to point connectivity to networked connectivity (significant communications expenses savings) => NATO General Segment System (NGCS) NATO secure communication network contracted mid 2012. Communication standard protocol: commercial world evolving towards so-called Everything over the Internet => contracted mid 2012. Radar Network connection (RADNET) contracted by mid 2012. Those technical evolutions will be integrated within the appropriate timeline (before PSWA or during In Service Support through replication contract activities). NATO UNCLASSIFIED

ACCS LOC1 Test Process Test &Evaluation DT&E IOT&E Initial Operational Test & Evaluation (IOT&E) IOT&E evaluates that the system is operationally effective and suitable IOT&E is conducted by AirC2PO&S with Contractor support Developmental Test & Evaluation (DT&E) DT&E verifies that the system performs as required in its intended environment DT&E is conducted by ACSI and its Subcontractors / Partners NATO UNCLASSIFIED

Sequence of Test events ü FST MTIF DryRun Formal Test FST Be FST Ge FST BU1 FST DR FT FST Ita DR FT FST Fra FAT Spiral 1 DR FT DR FT STI-2 STIII STVF STI IOT&E PSA DR FT DR FT IOT&E STI-1 DR FT IOT&E STII STIII Validation Sites PSA ARS Glons - Be Dry-Run FT IOT&E DR FT IOT&E CAOC Uedem - Ge Dry-Run FT IOT&E DR FT IOT&E DCAOC Uedem - Ge Dry-Run FT IOT&E DR FT IOT&E ST II / III CARS LMV - Fr Dry-Run FT IOT&E DR FT IOT&E CARS PR - It Dry-Run FT IOT&E DR FT IOT&E STII-1 STII-2 DARS-1 DR FT DR FT IOT&E PSA STII-2 DARS-QRP DR FT IOT&E NATO UNCLASSIFIED