JMM1 Editing a 3GPP spec - tips for experts Move to next slide.

Slides:



Advertisements
Similar presentations
SEM16-05 Maintenance & withdrawal of documents ETSI Seminar © ETSI All rights reserved.
Advertisements

Michigan Electronic Grants System Plus
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 4 1 All you always wanted to know about.
Create a Table of Contents Microsoft Word Help FAQ. How to create a table of contents in Microsoft Word Microsoft Word Help FAQ. How to create a table.
The MCC Specs database A guided tour. The Specifications panel …
Microsoft Word By: Phuong Nguyen.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 8 1 All you always wanted to know about.
A new generation of practice management software
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 10 1 All you always wanted to know about.
7 Feb 2000JMM1 Editing a GSM spec - tips for experts.
All you always wanted to know about 3GPP … but were too afraid to ask.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
Polycom Quotes on Demand Tool Partner User Guide Version 1.1
Student Manager Catalog Builder An ACEware Webinar.
Lesson 16 Enhancing Documents
Microsoft Office 2007: Introductory Computer Applications 11.
Pasewark & Pasewark 1 Word Lesson 8 Increasing Efficiency Using Word Microsoft Office 2007: Introductory.
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 11 1 Microsoft Office Excel 2003 Tutorial 11 – Importing Data Into Excel.
XP New Perspectives on Microsoft Office Word 2003 Tutorial 1 1 Microsoft Office Word 2003 Tutorial 1 – Creating a Document.
XP 1 Microsoft Office Word 2003 Tutorial 1 – Creating a Document.
Pasewark & Pasewark 1 Word Lesson 8 Increasing Efficiency Using Word Microsoft Office 2007: Introductory.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
CPIT 102 CHAPTER 2 USING INTERMEDIATE FORMATTING TECHNIQUES.
PYP002 Intro.to Computer Science Microsoft Word1 Lab 07 Creating Documents with Efficiency and Consistency.
Completing the Form PLAINTIFF’S CLAIM FORM 07A. On the Plaintiff’s Claim (FORM 07A) change your FORM STATUS by clicking once on the white box. A dropdown.
The change control cycle Or Where little 3GPP specifications come from …
Welcome to the University of Florida Online Employment System Applicant Tutorial.
Preparation and processing of in-session documents.
Power Point EDU 271 Microsoft PowerPoint is a powerful tool to create professional looking presentations and slide shows. PowerPoint allows you to construct.
Welcome to the University of West Florida Online Employment System Applicant Tutorial.
GFP in the IUID Registry – A Basic Look Walt Clark, CPPM Raytheon IIS.
Microsoft Word 2000: Mail Merge Basics Peggy Serfazo Marple Molly Calvello Support Professionals Business Applications - Desktop Microsoft Corporation.
Microsoft Office Word 2003 Tutorial 1 Creating a Document.
Learning Outcomes Assessment in WEAVEonline
Microsoft Office 2007 Word Chapter 1 Creating and Editing a Word Document.
XP New Perspectives on Microsoft PowerPoint 2002 Tutorial 1 1 Microsoft PowerPoint 2002 Tutorial 1 – Creating a PowerPoint Presentation.
WPM What’s behind the icon? Work Programme Management.
Copyright © 2008 Pearson Prentice Hall. All rights reserved Copyright © 2008 Prentice-Hall. All rights reserved. Committed to Shaping the Next.
The life-cycle of a 3GPP Spec Abridged for family viewing.
XP 1 Microsoft Word 2002 Tutorial 1 – Creating a Document.
Chapter 3 – Part 1 Word Processing Writer for Linux CMPF 112 : COMPUTING SKILLS.
Productivity Programs Common Features and Commands.
Working with Templates Lesson 6. Skills Matrix SKILL #MATRIX SKILL 1.1.1Work with templates 1.1.6Insert blank pages or cover pages.
Submission Status December Submission Status: Describes the status of the UDS report while it is being prepared, reviewed, or revised, either originally.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
XP New Perspectives on Integrating Microsoft Office XP Tutorial 1 1 Integrating Microsoft Office XP Tutorial 1 – Integrating Word and Excel.
The change control cycle Or Where little 3GPP specifications come from … Move to next slide.
Chapter 3 Automating Your Work. It is frustrating when you have to type the same passage of text repeatedly. For example your name and address. Word includes.
MCC 3GPP Work program Database Ian Doig, MCC. 3GPP Work program Database Request by Partner Organisations for a common 3G Work program Database. Based.
Page Layout You can quickly and easily format the entire document to give it a professional and modern look by applying a document theme. A document theme.
Word Create a basic TOC. Course contents Overview: table of contents basics Lesson 1: About tables of contents Lesson 2: Format your table of contents.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Extended Learning Module J (Office 2007 Version) Implementing.
Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 WPM What’s behind the icon? Work Programme Management.
CHAPTER 5 Introduction to Word Processing. OBJECTIVES 1.Define common terms related to word processing 2.Create, format, edit, save, and print Microsoft.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
CHAPTER 1 & 2 – MICROSOFT WORD Sravanthi Lakkimsetty April 11, 2016.
Using Templates and Mail Merge
Lesson 16 Enhancing Documents
Lesson 16 Enhancing Documents
Creating a Word Document – Part 1
Word Processing.
Formatting Your Senior Project
The lonely road or How a spec gets from WG Secretary to the server, and how it gets published as an ETSI deliverable 1.
PREPARATION OF DOCUMENTATION FOR CONSTITUENT BODIES MEETINGS
Microsoft Word 2003 Illustrated Complete
The How-to-Guide for Using Word
Microsoft® Office Word 2007 Training
Creating a Word Document – Part 1
Starting from Scratch: MLA Format
Purchase Document Management
Presentation transcript:

JMM1 Editing a 3GPP spec - tips for experts Move to next slide

JMM2 Question: Why am I editing this specification? Answer: To incorporate the modifications presented in one or more Change Requests which have been agreed by the relevant plenary* meeting. * Note: The responsibility for further development of all GSM specifications (except the 13.-series) has been transferred from the original SMG working group to the analogous working group in the appropriate 3GPP TSG. This change of responsibility also extends to maintenance of previous releases of the GSM specs. Move to next slide

JMM3 Open the document. (The examples shown in this and the following slides have been chosen more or less at random.) 3GPP Move to next slide

JMM4 Before editing a 3GPP spec, ensure you have the correct template file* for Word installed in Word’s ‘user templates’ directory**... * 3gpp_70.dot ** e.g. C:\Program Files\Microsoft Office\Templates\ Move to next slide

JMM5 Ensure you have the 3GPP template file in Word’s ‘user templates’ directory... Move to next slide

JMM6 … and that you attach it to the document! Move to next slide

JMM7 If you have any doubt about the previous use of the permitted styles, DO NOT check this box! This will ensure that the previous ‘wrong’ formatting is preserved. Move to next slide

JMM8 Ensure the top line reads 3GPP TS Or 3GPP TR and not simply 3G TS or 3GTR – the new designation was decided on at TSG#9. 3GPP Move to next slide

JMM9 Update the version number. The new version number can be determined from the ‘status list’ which is in turn based on the proposals in the CR database. Note: The version number should appear only once, on the top line. The “release” line at the end of the title should contain only the release identity, as shown here. 3GPP Move to next slide

JMM10 Date: year and month of plenary meeting which approved the CR(s) included in this new version. 3GPP Move to next slide

JMM11 If necessary, update the release number. Permissible values are: Release 1999 Release 4 Release 5 and in addition for GSM specs only, Phase 1 * Phase 2 * Release 1996 Release 1997 Release 1998 *Phase 1 and 2 are closed and only very exceptional changes are anticipated. 3GPP Move to next slide

JMM12 WARNING!! The first line (spec id) and the Release line at the end of the title are in special font styles enabling the text to be reproduced in the headers of subsequent pages. Take care not to corrupt these styles. 3GPP Move to next slide

JMM13 Insert the GSM logo for specifications which are pure GSM (i.e. not UMTS / 3 rd generation), if this is missing. 3GPP TS Move to next slide

JMM14 Ensure the 3GPP logo bears the “trade-mark” symbol. (If not, replace the graphic with that from the TS/TR boilerplate document.) 3GPP TS Move to next slide

JMM15 Check that the title is correct. Move to next slide In this case, the second line is wrong. Technical Specification Group Services and System Aspects; And there is an unnecessary capital letter in the main element of the title. Working methods

JMM16 Move to next slide The last line should not bear the spec number (even correctly rendered!). (Release 1999)

JMM17 Change to “page layout” view. Move to next slide Check that the frames on the first page have not been displaced (e.g. by an exceptionally long title).

JMM18 Ensure that no ETSI work item reference appears on the second page. Early 3GPP documents showed this. If it appears, delete the two offending lines. Move to next slide

JMM19 Change the copyright year if necessary. Move to next slide

JMM20 Ensure the correct names are shown for the Organizational Partners. Move to next slide (ARIB, ATIS, CCSA, ETSI, TTA, TTC)

JMM21 Enter details of the change into the change history annex. The title of this part of the document varies from spec to spec. However, it is always the last annex of the document. Ensure that the date and version are mentioned, together with details of the change and the CR number which caused it. Unfortunately, the layout of this annex varies from spec to spec. Unless you are prepared to update the entire annex, just follow the layout you find already in place. Move to next slide

JMM22 For TSs only, ensure that this annex is shown as ‘informative’. TRs are entirely informative, so do not require this indication. Annexes in TSs are either informative or normative. See TR for further details. Move to next slide

JMM23 Delete any history box and ISBN text which may appear on the last page. Early versions of the template included this box and the ISBN text. These pertain to the ETSI publication only, and should not appear on the ‘raw’ 3GPP spec. Move to next slide

JMM24 Delete any other extraneous text which may appear on the last page. By decision of SA#9, rapporteur names and coordinates are not to appear in the specification itself. (Rapporteurs are identified in the specifications database / status list.) Move to next slide

JMM25 Edit the document as necessary. Use exactly the text given in the approved CRs. If these are mutually contradictory, you may need to contact the rapporteur and the WG chairman for advice. Be guided also by the 3GPP drafting rules (TR ) and the ETSI guide to the use of English.use of English These will help you number inserted figures, guide you as to choice of paragraph style, etc. - information which is not normally contained in CRs. Move to next slide

JMM26 Accept all changes - do not leave revision marks in the finished document. Readers can consult the CRs to determine what the changes from the previous version are. Move to next slide

JMM27 Eliminate all annotations, “editor’s notes” etc. Unless there is a very good reason to leave them in place! Move to next slide

JMM28 In page layout view, scroll through the document to verify that there are no superfluous page breaks, that the headers are correct, etc. Move to next slide

JMM29 Refresh the Table of Contents (F9) and check that the actual pagination matches that claimed by the ToC. Move to next slide

JMM30 You should normally use the special MCC ToC button to accomplish the refresh, since this ensures correct layout as well as page numbering. Move to next slide

JMM31 IMPORTANT! Before closing, run the MCC Evil Eye. This runs a comprehensive error check on the file. Move to next slide

JMM32 When you are satisfied that all is well, save and close the file. Move to next slide

JMM33 Finally, ensure the file is correctly named: doc Corresponds to specification version Note the hyphen in the middle (not underscore). Move to next slide

JMM34 Then zip it to save space. Retain the same file name as the doc file (but with extension.zip). And deliver it by to the Specifications Manager. Move to next slide

JMM35 F I N Move to next spec!