Adaptive Re-use of the Former Denmark Hospital. Tom Stevens H+H Architects.

Slides:



Advertisements
Similar presentations
ZPlanned comparisons revealed significant priming effects for Morphologically related (t 10 =3.0, p
Advertisements

Meeting the Secretarys Standards: NPS Guidance on Special Issues Gary Sachau, National Park Service Historic Tax Credit Developers Conference St. Pete.
Challenge 5 T. Trimpe 2008
Old Royal Capital Cetinje Re-vitalization of the old capital trough urban reconstruction of the cultural heritage with energy efficiency considerations.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Industrial Design 7T552 Assignment 1 – Column’s in Building Rick van Veghel BT Joost Klaasen UT Joost van Ravesteijn BT.
Upper Valley Housing Coalition Anne Duncan Cooley Robert White, ASLA.
“POETIC FREEDOM” SPANGEN, ROTTERDAM. THE CITY ROTTERDAM.
Christchurch Town Hall November 27th, Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
Lerman Architects & Town Planners Haifa University Library Expansion of the library and renovation of the existing area.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Presentation International conference on Life cycle Design of Buildings, Systems and Materials 12th of June 2009 Berri de Jonge, MSc Plegt-Vos, New Business.
Kevin de almeida construction & structure srt 259 office showroom/ware house major project.
LISHA A BROWN 1 LIGHTING SCHEMATIC DESIGN PRESENTATION SHEPHERD UNIVERSITY WELLNESS CENTER.
Introduction Air conditioning Adaptive comfort Adaptive design
2009 CAMPUS LIGHTING RETROFIT FORUM Laboratory Lighting Controls Upgrade New Laboratory Building Biological Sciences 3 Beat Title 24 Energy Standard by.
Solar shading - helping to significantly reduce energy consumption in buildings.
Energy – domestic greenhouse gas emissions emissions from the domestic housing sector represent about 30% of the total Space heating 53% Water heating.
Facility: 8 Buildings: Administration, Cargo, NII (2), Export Control, Maintenance Garage, Veterinary Services, POV Secondary Inspection Tenants: CBP,
OPTION 2 - NO ADDITION CONCEPT PLAN ALTERATIONS TO THE HARTLEY DODGE MEMORIAL HOLT  MORGAN  RUSSELL ARCHITECTS FIRST FLOOR PLAN.
PAGE 1 Sustainable Buildings 2030 © 2008 THE WEIDT GROUP Building Energy Benchmarks THE WEIDT GROUP.
LHCb Lausanne Workshop, 21st March /12 Tracking Software for DC’06 E. Rodrigues, NIKHEF LHCb Tracking and Alignment Workshop  To do list, and done.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
Coast Construction & Design. Challenges Challenge One –Staffing & Collaboration Challenge Two –Design Challenge Three –Execution.
Science 10 Mr. Jean November 4 th, The plan: Video clip of the day Quiz topics Constant velocity Constant acceleration Project ideas Biggest things.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
How can collaboration be improved ? - can research collaboration facilitate growth for sub-suppliers? Kenneth Thomsen DTU Wind Energy Ane Holck DTU Innovation.
Centre for Radiation, Chemical and Environmental Hazards Radiation Protection Division formerly the National Radiological Protection Board Comparison of.
Spaces for teens Teens and Libraries – CLA Pre-Conference Magdalena Vander Kooy May 25, 2011.
Challenge the future Delft University of Technology Know What You Are Looking For A Theoretical Framework for Hedonic Office Studies Philip Koppels, Hilde.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
AKEGO GALLERY ENDICOTT, NY EVELYN CHOI DEA 648. AKEGO GALLERY ENDICOTT, NY PURPOSE To convert a former retail shop into a contemporary African art gallery.
+ Establish trust / Confidence. + Respect + Show appreciation + Maintain a positive attitude + Communication / Reflection + A strong team spirit + Thinking.
Speakman Place David Holden The Ingerman Group. Speakman Place Cornerstone West and The Ingerman Group collaborated to redevelop the former Speakman Company.
Overview and Update E7A Renewal Project. Exterior View E7A Renewal and Atrium Link to E7B.
Planning & Community Development Department 180 South Euclid Avenue Demolition of Existing Structure Consolidated Design Review (Appeal) City Council June.
Blank Jeopardy Blank blank
T. Trimpe Periodic Table Basics Challenge 4 T. Trimpe
Daniel Calcoen TE-MPE-EP
Heating Ventilating and Air Conditioning
Prepared by Frank Cooney B.Arch MRIA
EQUATIONS P2 Topic 4: Momentum, energy, work and power
TOWN OF ENFIELD FEASIBILITY STUDY FOR JFK MIDDLE SCHOOL
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Chapter 4 EXERCISE & FITNESS
Top 5 Qualities you must look while hiring an architect.
UPSIDE DOWN UP4 INGLE FARM CHILDREN’S CENTRE Completed 2013
Character Development
AD16WM Workspace Management Lecturer: Daniel Wong MBA, MSc, BBus
St Nicholas Church, Tuxford Nave, South & North Aisle Re-ordering
Propose the problems / topics to your lecturer for approval.
EQUATIONS P2 Topic 4: Momentum, energy, work and power
Conditioning the Spatial Integration of Renewable Energy?
Creating A Personalized Learning Space
Draft framework regulation on IESS
Mr Ant is an architect. He designs houses for the ants in Bilberry Wood. His study is on the second floor.
145 Main Street, Burton Joyce, Nottingham
Re-purpose Mortlake Brewery
Developing your Team Mission Patches
THE FAÇADE READY FOR PAINTING AND CLADDING COMPLETION.
EQUATIONS P2 Topic 4: Momentum, energy, work and power
Space is limited: Register Today
Title in large easily readable font
PKL INVESTMENTS LTD Value of contract: Length of contract:
ORION ALTERNATIVE SCHOOL
Insert Your Poster Title Here Your Name Goes Here Your Institution Name Can Go Here TRIFOLD AREA – THIS GUIDE WILL BE REMOVED BEFORE PRINTING – TRIFOLD.
Groups and Periods.
T. Trimpe Periodic Table Basics Challenge 5 T. Trimpe
Our Community Where is …?.
Key challenges to solve in a floating solar system
Presentation transcript:

Adaptive Re-use of the Former Denmark Hospital. Tom Stevens H+H Architects

INTRODUCTION

DENMARK HOSPITAL 1924

1924 FLOOR PLAN

PUSH FOR A NEW HOSPITAL

DENMARK HOSPITAL 2008

ZONES OF SIGNIFICANCE

PROPOSED WORKS

ADAPTIVE RE-USE WORKS Revealing significance

ADAPTIVE RE-USE WORKS Removing intrusive elements

ADAPTIVE RE-USE WORKS Reinstating facade

ADAPTIVE RE-USE WORKS Creating flexible spaces

RE-USE CHALLENGES FITTING USES INTO AVAILABLE SPACE MEETING ACCESS REQUIREMENTS MEETING ENERGY REQUIREMENTS SERVICES UPGRADES